From: BAROLO::WOLFE 28-AUG-1995 14:15:20.44 To: @weekly CC: Subj: Alcator C-MOD Weekly Highlights Alcator C-MOD Weekly Highlights August 28, 1995 The scheduled upgrade and maintenance interval on Alcator C-MOD continued last week. Good progress was made toward readying the machine for the next operating period. The gas handling cabinet for the new Boronization system has arrived from the vendor and is being installed in the C-MOD cell. All twenty inner divertor modules are now ready for installation. Eleven out of twenty of the old upper gusset protection modules have been removed from the machine and fitted with the new tiles and are now being re-installed. The West half of the igloo cover is now back in place. Diagnostic systems mounted to this cover, including the upper TCI and Thomson scattering optics, can now be reinstalled. The TCI CO2 laser is now reinstalled on its optical table. The sixth Thomson Scattering spectrometer has now been calibrated and installed in the cell. Martin Greenwald is visiting the TCV Group in Lausanne, Switzerland, for a collaboration on their Confinement Studies Program. Earl Marmar is participating in the ITER Diagnostics Workshop and Expert Group Meeting in Varenna, Italy. Last week Rejean Boivin visited Los Alamos to make arrangements for a collaboration involving use at C-MOD of the Time-of_Flight (TOF) Neutral Spectrometer previously used on ZT-40 and CTX.