Alcator C-Mod Weekly Highlights Dec. 05, 2005 FY2006 weeks of research operations: Planned: 12 weeks (tentative) Completed: 3.5 weeks Operations ---------- Research operations continued at Alcator C-Mod last week. Four run days were scheduled and completed. A total of 93 plasma discharges were produced with a startup reliability of 86%. Experiments were carried out in support of research under the Divertor/Edge, ICRF Physics, Transport, and Operations topics. The first full (overnight) boronization of the present campaign was conducted on Wednesday night. Plasma operations are scheduled to continue this week. Physics and Run Details ----------------------- Tuesday's run was devoted to MP#419 on wall pumping and hydrogen isotope retention, from the Divertor and Edge studies group. This run concentrated on 1MA lower single null discharges with a range of densities between 0.8