Alternator Support Equipment Testing and Maintenance Schedule Lube Oil System AC pumps transfer switches. Procedures BSPS/FBSPS/BSPR 1/BSPR 2 FBSPR 3/FBSPR 4/LOPA/FLOPA-----------------------------------------3/yr DC pumps transfer switches. Procedures EBSPS/EBSPSA/FEBSPS/ FEBSPSA/EBSPR/FEBSPR-------------------------------------------------3/yr Oil level alarm switches. Procedures OLG/FOLG----------------------3/yr Oil level trip switches. Procedures FLOLT/LOLT----------------------3/yr Oil thermostatic switches. Procedures HTH-TR/AROT/FAROT----3/yr Helium Gas System Core monitor--------------------------------------------------------------------2/yr Purity indicator-----------------------------------------------------------------2/yr River and City Cooling Water System. Transfer switch-----------------------------------------------------------------2/yr Alternator Stator Protection Protective relays----------------------------------------------------------------3/yr IS Limiter------------------------------------------------------------------------2/yr Alternator Field Protection Ground fault---------------------------------------------------------------------2/yr Safety System Functional Testing DC Power and Battery Storage System Battery charging system and DC storage capacity---------------------1/yr Lube oil DC starters-----------------------------------------------------------1/yr Seal oil DC starters------------------------------------------------------------1/yr 480V AC Power systems Diesel transfer switch----------------------------------------------------------1/yr UPS Transfer switch-----------------------------------------------------------1/yr Lube Oil System AC and DC pumps transfer switches--------------------------------------1/yr AC and DC alarms, level and temperature switch----------------------1/yr Seal Oil System DC pump transfer switch-----------------------------------------------------1/yr Seal oil tank high and low level switches----------------------------------1/yr Helium Gas System Core monitor fault trip circuit----------------------------------------------1/yr Purity indicator fault circuit------------------------------------------------1/yr Low pressure gas alarm------------------------------------------------------1/yr River and City Water Emergency Transfer Auto valve and check valve operation-------------------------------------1/yr River water failure fault trip circuit---------------------------------------1/yr Vibration Monitor Alarm and trip fault circuit--------------------------------------------------3/yr Alternator Stator Protection Protective relays fault trip circuit------------------------------------------3/yr IS Limiter fault trip circuit--------------------------------------------------3/yr 13.8KV Kelex switch safety interlocks and inspection----------------1/yr Assure personal barriers are in place be fore starting Alternator Field Protection DC breaker fault trip circuit------------------------------------------------3/yr Yard breaker fault trip circuit----------------------------------------------3/yr AC field supply breaker fault trip circuit---------------------------------3/yr Ground fault trip circuit-------------------------------------------------------1/yr Drive System Protection Limit amp fault trip circuits-------------------------------------------------2/yr Silco fault trip circuits--------------------------------------------------------2/yr DC breaker shunt trip circuit-------------------------------------------------2/yr Limit amp starter trip circuit-------------------------------------------------2/yr Performance Checks Building fire and smoke detection system test-----------------------------2/yr Building water or oil flood system test--------------------------------------2/yr Building exit signs and fire extinguishers operational-------------------2/yr Drive System--------------------------------------------------------------------2/yr Silcomatic, Kramerstat, Limitamp, Switch Gear contactors, Auto Tansformer and Rectifier 2000 hp Motor. Exciter Power Supplies-------------------------------------------------------2/yr Exciter Power Source Yard 13.8 kv to 480 --------------------------------1/yr Alternator Power Source Yard 13.8 kv to 4160---------------------------1/yr