Alcator C-Mod Run 1000504 Information

Back to runs

Miniproposals
Miniproposal:265
Date Filed: 4/7/2000
Title:CXRS Commissioning
First Author:E.C. Eisner
Session Leader:Bill Rowan (shots 1-14)
Miniproposal:266
Date Filed: 4/1/2000
Title:DNB Conditioning
First Author:Bill Rowan
Session Leader:Bill Rowan (shots 1-14)

Operators
Session leader(s):Bill Rowan,Bill Rowan
Physics operator(s):Robert Granetz
Engineering operator(s):Gary Dekow

Engineering Operator Run Comment

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries
Entered: Jul 7 2004 04:37:10:473PM
Author: To Be Determined
Physics operator summary for run 1000504:

MP # 266 -- Beam Conditioning
MP # 265 -- CXRS Commissioning

SL: Bill Rowan
PO: R. Granetz
EO: G. Dekow

Summary: Three different tasks were worked on today. DNB and CXRS
commissioning is coming along; RF operation of D and E at nearly
3 MW was fairly reliable today, and J3 and J4 were running
simultaneously at 0.5 MW by the end of the day; and the LPI was able
to repeatedly trigger prompt disruptions using double-lithium pellets
with a small amount of silver powder sandwiched between them. Plasma
startup was very reliable, even after disruptions.

The run was delayed until noon because of a wide-area power failure
that occurred last evening, necessitating the resetting of many
pumps and other systems this morning. The only other problem was
a partial failure of the data acquisition on shot 09.

Scorecard: 11 plasmas
1 fizzle
0 duds
2 tests
0 aborted
----------
14 total

-------------------------------------------------------------------------------

Engineering setup for Thursday, 04 May 2000.

Run will start at 09:00 and end at 17:00.

ECDC overnight in D2, turn off 2 hours before run

Power system setup as on last shot on Wednesday (1000503023).

Gas setup - fill B-top with 6 psi of D2 Hybrid enabled
fill B-side lower with 1 psi of Ar Hybrid enabled
leave B-side upper as is Hybrid DISABLED
fill C-side with 30 psi of D2 Hybrid enabled
leave J-bottom as is Hybrid DISABLED

The following gate valves should be enabled, assuming no vacuum problems:
VUV and ECE

Run Plan:
---------

Start plasma operations from a reload of the last shot from Wednesday,
and proceed with DNB conditioning and CXRS commissioning.

-------------------------------------------------------------------------------

NOTE: A POWER FAILURE OCCURRED LAST NIGHT AROUND 22:15. This has
resulted in a 3.5 hour delay in the start of the run, in order
to restart pumps, reset gate valves, etc. Because of the
power failure, we only got a few hours of ECDC (in D2) last
night.

Hybrid coldstart done; no errors found

Loaded 1000503023 (last shot from yesterday)

-------------------------------------------------------------------------------

Shot 01 -- Test of EF4 under PLC control, at the request of Bill Cochran.
Lots of spikes on a gate signal. Bill wants to do the test again
after changing a ground.

Shot 02 -- Test of EF4 under PLC control, this time with RF also.
Result: fewer spikes. Fizzle detector prevented the RF from
firing.

Next shot: try for plasma. Pre-fill puff is set to 12 ms, since the
DNB valve will be enabled.

Shot 03 -- Fizzle. Br0 was too negative. Gas fill was lower than normal, but
still within OK range.

Next shot: change Br0 offset by +1 mT.

Shot 04 -- Plasma. Good full-length shot. Current rise was not the best...
Bz didn't rise as fast as normal.

Next shot: no PCS changes. Enable LPI at 1.3 s.

Shot 05 -- Plasma. Disrupted at t=1.43 s. Prf=2 MW. H-mode. Lithium pellet
at t=1.30 s, with P-mode until t=1.41 s. Flux loop F08 had a
baseline offset.

Next shot: repeat.

Shot 06 -- Plasma. Good shot. Prf=2.3 MW. EDA H-mode. No Li pellet.
H/D=3-4%. Good heating.

Next shot: repeat. Fire a silver-dusted single Li pellet at t=1.5 s

Shot 07 -- Plasma. Good shot. Prf=2.9 MW for 0.5 s ! Multiple EDA H-modes.
Ag-coated Li pellet went in, but didn't disrupt the plasma. No
P-mode either. Big spikes on the X-rays and 2pi bolo at the H-L
back-transitions. Weak or non-existant enhanced neutron modes.

Next shot: repeat. Fire a double-Li Ag-sandwiched pellet at 1.5 s.

Short break for cell and power room access.

Shot 08 -- Plasma. Good shot. Double-Li Ag-sandwiched pellet successfully
killed the plasma. Prf=2.9 MW for 0.5 s. Multiple EDA H-modes.

Next shot: see if we can still get a plasma after that disruption.
Also try another silver-sandwiched double-Li pellet at 1.5 s.

Shot 09 -- Plasma. Good shot. Double-Li Ag-sandwiched pellet successfully
killed the plasma again. Lots of DAQ problems. Probably had RF,
and an H-mode, but we'll never know for sure.

Next shot: repeat. Fire a tungsten-doped Li pellet at 1.5 s.

Delay for Josh to try and figure out the DAQ problems.

Shot 10 -- Plasma. Good shot. Prf=2.6 MW. Multiple EDA H-modes. The
tungsten-doped Li pellet killed the plasma, but not promptly.

Next shot: repeat. LPI will fire a plain Li pellet at t=1.4 s.

Shot 11 -- Plasma. Good shot. Nice long steady EDA H-mode. Prf=2.6 MW for
0.5 s. Li pellet at t=1.4 s.

Next shot: repeat.

Shot 12 -- Plasma. Good shot. Prf=2.6 MW. Multiple EDA H-modes. Li pellet
at t=1.4 s. J3 and J4 were on simultaneously late in the RF pulse.

Next shot: repeat.

Shot 13 -- Plasma. Good shot. Prf=2.6 MW. One long and one short EDA H-mode.
Li pellet at 1.4 s.

Next shot: repeat.

Shot 14 -- Plasma. Good shot. Prf=2.6 MW. Nice long steady EDA H-mode.
Li pellet at 1.4 s.

End of run.

Session Leader Comments
May 4 2000 12:34:57:950PM1000504001Bill RowanShot 001. Not opening gate valve. 31kV on acc. Gate valve closed because this is an engineering test.
Synched with C-Mod. Good DNB pulse
May 4 2000 12:53:36:653PM1000504002Bill RowanShot 002. Not opening gate valve. 31kV on acc. Gate valve closed because this is an engineering test.
Synched with C-Mod
May 4 2000 01:03:41:810PM1000504003Bill RowanShot 003. Opened DNB gate valve on this shot

May 4 2000 01:20:57:043PM1000504004Bill RowanShot 004. Opened gate valve. 33 kV on accelerator
May 4 2000 01:27:00:187PM1000504004Bill RowanApprox 54 A of arc current during conditioning shot which is not synched with C-Mod
Approx 35 A of arc current with firing with machine. Apparent loading of 480
May 4 2000 01:58:19:687PM1000504005Bill RowanShot 005. Opened gate valve. 33 kV on acc.
May 4 2000 02:12:45:467PM1000504006Bill RowanShot 006. Opened gate valve. 36 kV on accelerator. 45A arc current
70 A arc current when not firing with C-Mod
May 4 2000 02:24:58:497PM1000504007Bill RowanShot 007. Opened gate valve. 36 kV on accelerator. 45A arc current
May 4 2000 02:56:53:140PM1000504008Bill RowantShot 008. Opened gate valve. 39 kV on acc. 60 A arc current.
85A arc current when not firing with C-Mod
May 4 2000 03:46:54:907PM1000504009Bill RowanShot 009. Opened gate valve. HV disabled due to problems with power supplies
May 4 2000 03:47:21:577PM1000504010Bill RowanShot 010. Opened gate valve. 44 kV on accelerator.

Physics Operator Comments
May 4 2000 12:21:30:513PMRobert GranetzEngineering setup for Thursday, 04 May 2000.

Run will start at 09:00 and end at 17:00.

ECDC overnight in D2, turn off 2 hours before run

Power system setup as on last shot on Wednesday (1000503023).

Gas setup - fill B-top with 6 psi of D2 Hybrid enabled
fill B-side lower with 1 psi of Ar Hybrid enabled
leave B-side upper as is Hybrid DISABLED
fill C-side with 30 psi of D2 Hybrid enabled
leave J-bottom as is Hybrid DISABLED

The following gate valves should be enabled, assuming no vacuum problems:
VUV and ECE
May 4 2000 12:21:43:530PMRobert GranetzRun Plan:
---------

Start plasma operations from a reload of the last shot from Wednesday,
and proceed with DNB conditioning and CXRS commissioning.
May 4 2000 12:21:57:530PMRobert Granetz NOTE: A POWER FAILURE OCCURRED LAST NIGHT AROUND 22:15. This has
resulted in a 2 hour delay in the start of the run, in order
to restart pumps, reset gate valves, etc. Because of the
power failure, we only got a few hours of ECDC (in D2) last
night.

Hybrid coldstart done; no errors found

Loaded 1000503023 (last shot from yesterday)
May 4 2000 12:47:02:640PM1000504001Robert GranetzShot 01 -- Test of EF4 under PLC control, at the request of Bill Cochran.
Lots of spikes on a gate signal. Bill wants to do the test again
after changing a ground.
May 4 2000 12:55:09:467PM1000504002Robert GranetzShot 02 -- Test of EF4 under PLC control, this time with RF also.
Result: fewer spikes. Fizzle detector prevented the RF from
firing.

Next shot: try for plasma. Pre-fill puff is set to 12 ms, since the
DNB valve will be enabled.
May 4 2000 01:08:07:123PM1000504003Robert GranetzShot 03 -- Fizzle. Br0 was too negative. Gas fill was lower than normal, but
still within OK range.

Next shot: change Br0 offset by +1 mT.
May 4 2000 01:28:04:123PM1000504004Robert GranetzShot 04 -- Plasma. Good full-length shot. Current rise was not the best...
Bz didn't rise as fast as normal.

Next shot: no PCS changes. Enable LPI at 1.3 s.
May 4 2000 02:13:17:530PM1000504005Robert GranetzShot 05 -- Plasma. Disrupted at t=1.43 s. Prf=2 MW. H-mode. Lithium pellet
at t=1.30 s, with P-mode until t=1.41 s. Flux loop F08 had a
baseline offset.

Next shot: repeat.
May 4 2000 02:12:55:733PM1000504006Robert GranetzShot 06 -- Plasma. Good shot. Prf=2.3 MW. EDA H-mode. No Li pellet.
H/D=3-4%. Good heating.

Next shot: repeat. Fire a silver-dusted single Li pellet at t=1.5 s
May 4 2000 02:44:35:360PM1000504007Robert GranetzShot 07 -- Plasma. Good shot. Prf=2.9 MW for 0.5 s ! Multiple EDA H-modes.
Ag-coated Li pellet went in, but didn't disrupt the plasma. No
P-mode either. Big spikes on the X-rays and 2pi bolo at the H-L
back-transitions. Weak or non-existant enhanced neutron modes.

Next shot: repeat. Fire a double-Li Ag-sandwiched pellet at 1.5 s.
May 4 2000 03:01:45:360PM1000504008Robert GranetzShot 08 -- Plasma. Good shot. Double-Li Ag-sandwiched pellet successfully
killed the plasma.. Prf=2.9 MW for 0.5 s. Multiple EDA H-modes.

Next shot: see if we can still get a plasma after that disruption.
Also try another silver-sandwiched double-Li pellet at 1.5 s.
May 4 2000 03:39:31:373PM1000504009Robert GranetzShot 09 -- Plasma. Good shot. Double-Li Ag-sandwiched pellet successfully
killed the plasma again. Lots of DAQ problems. Probably had RF,
and an H-mode, but we'll never know for sure.

Next shot: repeat. Fire a tungsten-doped Li pellet at 1.5 s.

Delay for Josh to try and figure out the DAQ problems.
May 4 2000 03:50:03:997PM1000504010Robert GranetzShot 10 -- Plasma. Good shot. Prf=2.6 MW. Multiple EDA H-modes. The
tungsten-doped Li pellet killed the plasma, but not promptly.

Next shot: repeat. LPI will fire a plain Li pellet after t=1.4 s.
May 4 2000 04:14:31:263PM1000504011Robert GranetzShot 11 -- Plasma. Good shot. Nice long steady EDA H-mode. Prf=2.6 MW for
0.5 s. Li pellet at t=1.4 s.

Next shot: repeat.
May 4 2000 05:18:17:967PM1000504012Robert GranetzShot 12 -- Plasma. Good shot. Prf=2.6 MW. Multiple EDA H-modes. Li pellet
at t=1.4 s. J3 and J4 were on simultaneously late in the RF pulse.

Next shot: repeat.
May 4 2000 05:18:35:140PM1000504013Robert GranetzShot 13 -- Plasma. Good shot. Prf=2.6 MW. One long and one short EDA H-mode.
Li pellet at 1.4 s.

Next shot: repeat.
May 4 2000 05:18:45:200PM1000504014Robert GranetzShot 14 -- Plasma. Good shot. Prf=2.6 MW. Nice long steady EDA H-mode.
Li pellet at 1.4 s.

End of run.

Engineering Operator Comments
ShotTimeTypeStatusComment
112:30:01:890PMTestOkEF4 Test
212:49:36:327PMTestOkEF4 PLC Test
301:01:00:077PMPlasmaOk
401:15:09:437PMPlasmaOk
501:36:15:233PMPlasmaOk
601:57:07:263PMPlasmaOk
702:18:41:280PMPlasmaOk
802:48:10:623PMPlasmaOk
903:06:28:640PMPlasmaOk
1003:40:30:327PMPlasmaOk
1104:03:19:170PMPlasmaOk
1204:23:49:420PMPlasmaOk
1304:47:34:263PMPlasmaOk
1405:08:47:937PMPlasmaOk