| Session leader(s): | Unknown |
| Physics operator(s): | Jim Irby |
| Engineering operator(s): | Bill Cochran |
| Engineering Operator Run Comment |
| Power System Tests. Irby/Cochran |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Physics Operator Summaries |
| Entered: Jul 7 2004 04:37:11:707PM |
| Author: To Be Determined |
| Physics Operator Run Summary for 1000816 This run was dedicated to bringing up the power supplies after several weeks of down time to upgrade the j-port antenna and add boron nitride tiles to all antennas. Physop : J Irby EO : B Cochran Summary: After problems with two power supply PCs, and some minor data system problems the power tests went very well today. All supplies are now tested and ready for operation. The last shot of the day was a plasma attempt that resulted in a fizzle with a very late breakdown (shot 29). It should be a good shot to start with tomorrow. Many diagnostics are already back online. Problems: EF4 reverse bridge under PLC had a problem, but EF4 worked fine under hybrid control. EF2L had large ripple under PLC control, but was okay when the current and voltage demand was tweaked a little. The G-side ratiomatic was not working today and needs to be repaired before tomorrow's run. |
| Session Leader Comments |
| Physics Operator Comments | |||
| Aug 16 2000 10:39:42:247AM | Jim Irby | Today is the first run after the vessel entry to upgrade the j-port antenna and install massive amounts of boron nitride tiles. We have had several days of 120C bake and several more days of ECDC in D2 at 2.e-4 Torr. Today: 1) power tests 2) check out gas system, data system, hybrid 3) ? Problems this morning: . fault indications on OH1 commutation bank. Bill found a loose connection . OH and EF3 control PCs had disk error problems . PCS file locations had been changed . coldstart log file not updating properly Alternator ready at 09:50 Did coldstart ---------------------------------------------------------------------------- 1000816xxx irby PHYSICS_OPERATOR Aug 16 2000 10:01:48:780AM . . . . . . . . . . . . . . . . . . . . Today is the first run after the vessel entry to upgrade the j-port antenna and install massive amounts of boron nitride tiles. We have had several days of 120C bake and several more days of ECDC in D2 at 2.e-4 Torr. Today: 1) power tests 2) check out gas system, data system, hybrid 3) ? Problems this morning: . fault indications on OH1 commutation bank. Bill found a loose connection . OH and EF3 control PCs had disk error problems . PCS file locations had been changed . coldstart log file not updating properly Alternator ready at 09:50 Did cold start rtnode -- data loaded, A matrix responds rtnode -- data loaded, M matrix responds rtnode -- data loaded, PID matrix responds RT_NODE Done Loaded 1000616001, dropped Ip to 800 kA | |
| Aug 16 2000 12:18:39:590PM | 1000816004 | Jim Irby | OH2U test --- looks good |
| Aug 16 2000 12:27:16:123PM | 1000816005 | Jim Irby | Removed waggle from TF --- still have backporch OH2U other polarity |
| Aug 16 2000 12:49:23:513PM | 1000816005 | Jim Irby | oh2l --- negative --- looks okay |
| Aug 16 2000 12:55:27:420PM | 1000816007 | Jim Irby | OH2L -- positive --- looks okay We have been puffing D2 for the last couple of shots. We are getting gas into the machine, but the ratiomatic is not on. We assume it's powered off in the cell. |
| Aug 16 2000 01:06:06:170PM | 1000816008 | Jim Irby | oh1 looks good |
| Aug 16 2000 04:58:23:937PM | 1000816024 | Jim Irby | Disabled gas for next shot to see how sparker responds |
| Aug 16 2000 05:39:04:640PM | 1000816027 | Jim Irby | zeroed voltage programming on ef4 turned off segment 02 EF4 looks good |
| Aug 16 2000 06:08:49:623PM | 1000816029 | Jim Irby | Plasma attempt: very late breakdown, fizzle |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 2 | 11:27:11:997AM | Test | Bad | camac errors |
| 3 | 11:47:03:200AM | Test | Ok | CAMAC only |
| 4 | 12:09:53:013PM | Test | Ok | OH2U forward only, okay |
| 5 | 12:22:37:450PM | Test | Ok | OH2U reverse test only, okay |
| 6 | 12:38:22:360PM | Test | Ok | OH2L forward only |
| 7 | 12:50:28:140PM | Test | Ok | OH2L reverse test |
| 8 | 01:03:05:420PM | Test | Ok | OH1 forward only |
| 9 | 01:15:22:327PM | Test | Ok | OH1 reverse only |
| 10 | 01:30:30:157PM | Test | Ok | EF1U test only |
| 11 | 01:44:56:530PM | Test | Ok | EF1U reverse test only |
| 12 | 01:59:48:687PM | Test | Ok | EF1L forward test only |
| 13 | 02:14:17:263PM | Test | Ok | EF1L reverse test only |
| 14 | 02:28:50:157PM | Test | Ok | EF4 Forward test only |
| 15 | 02:43:23:140PM | Test | Bad | EF4 Reverse did not fire |
| 16 | 02:54:59:577PM | Test | Bad | EF4 reverse did not fire |
| 17 | 03:13:10:030PM | Test | Ok | EF2U test only |
| 18 | 03:22:33:217PM | Test | Bad | EF2L has large ripple on it's output |
| 19 | 04:06:43:467PM | Test | Ok | EFC Chopper test only |
| 20 | 04:19:37:653PM | Test | Ok | EF3 Test only |
| 21 | 04:28:43:670PM | Test | Ok | TF 50ka test only |
| 22 | 04:38:53:840PM | Test | Ok | TF 100ka test only |
| 23 | 04:51:47:983PM | Test | Ok | TF 150ka test only |
| 24 | 05:01:49:327PM | Test | Ok | OH commutation test |
| 25 | 05:11:05:343PM | Test | Ok | EF1 commutation test |
| 26 | 05:21:13:340PM | Test | Ok | EF4 double swing test |
| 27 | 05:37:01:903PM | Test | Ok | EF4 Double swing test |
| 28 | 05:46:25:903PM | Test | Ok | EF2L test only |
| 29 | 06:02:06:733PM | Plasma | Ok | No faults, all systems fired |