Alcator C-Mod Run 1000825 Information

Back to runs

Miniproposals
Miniproposal:268
Date Filed: 4/7/2000
Title:Conditioning of D-, E-, or J-Port ICRF Antenna
First Author:Gerd Schilling
Session Leader:Steve Wukitch (shots 1-21)
Miniproposal:276
Date Filed: 6/1/2000
Title:Transport Experiments in the Scrape-Off Layer during Ohmic L- andH-mode using Gas-Injection Plumes
First Author:Sanjay Gangadhara
Session Leader:Sanjay Gangadhara (shots 22-25)

Operators
Session leader(s):Steve Wukitch,Sanjay Gangadhara
Physics operator(s):Bill Rowan
Engineering operator(s):Gary Dekow,Ed Fitzgerald,Bill Cochran

Engineering Operator Run Comment
Wukitch,Rowan,Cochran,Fitzgerald

Session Leader Plans

Physics Operators Plans

Session Leader Summaries
Entered: Jul 7 2004 03:49:24:663PM
Author: To Be Determined
Engineering Setup for 1000825

MP268 ICRF Commissioning

Session Leader: S. Wukitch
Physics Operator: J.
Engineering Operators: B. Cochran/G. Dekow

Engineering Setup:

The machine should be boronized overnight with 1700 to 2000 Angstroms of
boron following by as much helium ECDC as possible while stopping at 07:30.

Run begins at 9:00 and ends at 17:00

Power system setup: Same as for 1000824026 (5.2 T, 0.8 MA inner wall diverted)

Set OH1, OH2U and OH2L fizzle delays at 400ms
Set TF fizzle delay at 500 ms


Gas setup: B-Top 6 psi D2 Hybrid Enabled
B-side lower 1 psi Argon Hybrid DISABLED
B-side upper leave as is Hybrid DISABLED
C-side 30 psi D2 Hybrid Enabled
J-bottom leave as is Hybrid DISABLED

The following Gate Valves should be ENABLED, assuming no vacuum problems:

ECE, VUV

For first plasma shot, load from 1000824026 (0.8 MA, 5.2 T).

1. Power testing and conditioning for D, E and J-port antennas
2. Power ramps for D, E and J
3. Power steps
4. gap, density, I, and BT scans

Primary goal is to power condition the J-port antenna. In addition,
we would like to perform BT scan to test higher field operation
particularly for D-port.


001 plasma - two brief elm free H-modes
H/D started at >0.1 and climbed to 0.2
total RF was 1.6MW
D-port 0.4 MW clean
E-port 0.4 MW clean
J-port ramped to 0.8 MW

next shot: raise contribution from J to 1 MW

002 plasma - disrupted 1.4 sec
H/D started at >0.15 and climbed to ~0.3
total RF was 1.8MW
right gap 1.6 cm from 2 cm

next shot: raise contribution from J to 1.2 MW and E-port off
right gap to 1.2 cm

003 plasma - disrupted 1.36 sec
H/D started at ~0.15 and climbed to ~0.3
total RF was 1.4MW
right gap ~1.2 cm

next shot: increase right gap to 2 cm

004 plasma
H/D started at ~0.15 and climbed to ~0.3
total RF was 1.4MW till J4 faults off
right gap ~2 cm

next shot: raise J power to 1.2 MW
decrease nl_04 target 10%

005 plasma
H/D started at ~0.2 and climbed to ~0.3
total RF was 1.6 MW till J faults off
right gap ~2 cm

next shot: raise J power to 1.5 MW and D-port off

006 plasma disrupted 1.145 sec
H/D started at ~0.2 and increased to 0.4
total RF was 1.5MW with few J faults

next shot: repeat with Ar puff off

007 plasma disrupted 1.15 sec
H/D started at ~0.2 and increased to 0.4
total RF was 1.5MW with few J faults

next shot: repeat with D and E-port / J-port off

008 plasma
total RF was 1.5MW

next shot: repeat with D and E-port off/ J-port on

009 plasma disrupted 1.1
total RF was 1.5MW

next shot: increase field to 5.4 T
reduce J-port and enable D and E

010 plasma disrupted 1.08
total RF was 1.5 MW
D-port failed

J-port injection killed the plasma k-port upper corner - same as last shot

next shot: increase field to 5.6 T
D-port on for 50 msec without E

011 plasma disrupted 1.08 sec
total RF was 2 MW

J-port injection killed the plasma k-port upper corner - same as last shot

next shot: increase field to 5.8 T
J-port off

012 plasma
total RF was 1.5 MW
BT~5.75 T

next shot: increase field to 5.9 T

013 plasma
total RF was 1.5 MW before D-port faults
BT~5.8 T

next shot: retune and try again

014 plasma
total RF was .75 MW (D-port faulted)
BT~5.8 T

next shot: stagger D and E

015 plasma
total RF was 1.5 MW till D-port faulted
BT~5.8 T

next shot: less overlap on D and E
016 no power

017 plasma
D-port ran but E-port failed
J-port performed poorly

next shot: repeat

018 no TF

019 plasma
no E-port
D-port ran
J4 failed
J3 ran

next shot: back to 5.2 T

020 fizzle

021 plasma disrupted ~1.4

total PRF~2.4 MW
J-port injection

next shot: turn session over to Sanjay

Summary:

J-port was responsible for a number of the disruptions. Comparing 1.5
MW discharges from D&E and J, the D&E plasmas ran while the J-port
ones disrupted early. H-side corners and K-side upper corner have
confirmed injections that result in disruptions. At BT up to 5.8 T, D
and E-port ran reliably individually. This is an improvement over May
and June when D would fault at fields < 5.4 T. We have a cross
coupling problem with high H/D at higher fields. Reducing H/D could
improve operations of both the J-port injections and the cross
coupling at higher toroidal fields.



Physics Operator Summaries
Entered: Jul 7 2004 04:37:11:800PM
Author: To Be Determined
Run Plan and Engineering Setup for 1000825

MP268 ICRF Commissioning
MP276 SOL Trans/Burping (Piggyback)

Session Leader: S. Wukitch
Physics Operator: B. Rowan
Engineering Operators: B. Cochran/G. Dekow

Engineering Setup:

Overnight ECDC in D2, stopping 1-2 hours before run.

Run begins 9:00 and ends at 15:00.

Power system setup: Same as for 1000824026 (5.2 T, 0.8 MA, inner wall diverted)

Set OH1, OH2U and OH2L fizzle delays at 300ms
Set TF fizzle delay at 400 ms


Gas setup: B-Top 6 psi D2 Hybrid Enabled
B-side lower 1 psi Argon Hybrid DISABLED
B-side upper leave as is Hybrid DISABLED
C-side 30 psi D2 Hybrid Enabled
J-bottom leave as is Hybrid DISABLED

The following Gate Valves should be ENABLED, assuming no vacuum problems:

ECE, VUV


Run Plan:

Load from shot 1000824026

Conduct ICRF commissioning according to SL desires

ICRF after 0.7 s to facilitate burping probe experiment

Perhaps diverted discharges later in the day for burping probe experiments.
Per Sanjay, reference shot for this is 1000517019 (0.8 MA, 5.2 T, 10^20 m^-3)

**********
Summary
The initial experiments was MP268 ICRF Commissioning. The run was started
with the last shot of the previous day, 1000824026.

Shots 002 and 003 were used to reduce the outer gap to approximately 1.2 cm
to improve the RF coupling. The plasma disrupted early on these two shots.
The 2Pi bolometer indicated increased radiation prior to the disruption.
On shot 004, the outer gap was returned to 2 cm. The shot ran full length.
It appears that the RF system is the source of the radiation and the
disruptions.

The TF was scanned shot by shot from 5.2 T to 5.8 T on shots 009 through 017.
Actually, the highest value was reached on shot 013 and the remaining shots
in the scan were taken to achieve the required RF parameters -- see SL summary.

The second experiment was MP276 SOL Trans/Burping. This experiment was
running in piggyback mode earlier, but took control for shots 022 through
025.

Score card
Plasma. Full length shots. 12
Plasma. Disruption. 9 (due to RF)
Fizzles 2
Engineering problems 2

Total 25

The disruptions seemed to be due to RF.
On the fizzles (020 and 023), the initial pressure and the null matched
that on the successful shots. After the fizzle on shot 020, I did nothing
and 021 was successful. After the fizzle on shot 023, I raised the pressure
by an inconsequential amount -- intending to continue if there was another
fizzle. Shot 024 was successful.


**********
Details
Delay in start. Note from Irby:
A failure in a HEAT PLC module caused a trip of the HEAT breaker.
Willy and Gary have been working on the problem since very early this
morning, and the start time estimate assumes they are able to fix
the problem. The vessel average temp dropped below -60C and
minimum temps reached -125C. No leaks however.

Started PCS and loaded shot 1000824026

Did cold start. With this result
rtnode -- data loaded, A matrix responds
rtnode -- data loaded, M matrix responds
rtnode -- data loaded, PID matrix responds
RT_NODE Done
25-AUG-2000 08:41:26.48 doing TCL command TYPE *************** END COLD
START ******************
*************** END COLDSTART ******************



Shot 001. Plasma. Breakdown consistent with reference shot 1000824026.
Couple of brief H-modes following 0.73 s.

Shot 002. Plasma. Reduced right gap by approx 0.002 m. Half the request of the SL.
Disruption at approx. 1.4 s.

Shot 002. Plasma. Reduced right gap by approx 0.002 m. Half the request of the SL.
Disruption at approx. 1.4 s.

Next shot. Will make an additional reduction in right gap.
RF will be reduced by the increment made for shot 002.

Shot 003. Plasma. Right gap responded to changes as expected.
Disruption occurred at a slightly earlier time, and there was
evidence of high radiated power at an earlier time that the previous shot.

Next shot. Returning to right gap used on shot 001. Testing whether this is
related to the disruption.

Shot 004.. Plasma. Returned to behavior of shot 001.

Next shot. Lowering density by 10%.
At request of Rice and with approval of SL, increased argon puff from 25ms to 30 ms.
Beginning Argon puffing on shot 005

Shot 005. Plasma.

Next shot. No changes.

Shot 006. Plasma. Disruption at 1.15 s.

Next shot. Disabled Ar puffing.

Shot 007. Plasma. Disruption at 1.26 s
Increased noise on F-side pressure. Mean seems unchanged from previous shot.

Next shot.
Note changes in RF (SL log) for next shot to look for source of disruption.

Shot 008. Plasma. Plasma current past 1.8 s.

Next shot.
Note changes in RF (SL log) for next shot to look for source of disruption.

Shot 009. Plasma. Disruption at 1.16 s.

Next shot. Increase BT to approx. 5.4 T

Shot 010. Plasma. Disruption at 1.07 s. At t = 0.5169, BT = 5.36758

Next shot. Increase BT to arrox. 5.6 T

Shot 011. Plasma. Disruption at 1.1 s. At t - 0.59, BT = 5.56 T

Next shot. Increase BT to approx. 5.8 T

Shot 012. Plasma. Full length shot. At t = 0.56, BT = 5.73

Next shot. Increase BT to approx. 5.9 T.

Shot 013. Plasma. Full length. At t = 0.80 s, BT = 5.8 T

Next shot. No changes.

Shot 014. Plasma. Full length.

Before the next shot: Cell access for Childs.

Next shot. No changes

Shot 015. Plasma

Next shot. No changes.

Shot 016. No power shot. Engineering problem.

Shot 017. Plasma. Disruption at 1.5 s.

Next shot. No changes.

Shot 018. No TF

Shot 019. Plasma. Full length shot.

Dekow taking over as EO.

For next shot: Reduced BT to approx 5.2 T

Shot 020. Fizzle.

Shot 021. Plasma. Disruption at 1.4 s.
Last shot for MP268 ICRF Commissioning.

Next shot: Transition to MP 276. SOL Trans/Burping probe. RF off.

Shot 022. Plasma. Full length shot.

Next shot. No changes.

Shot 023. Fizzle

Next shot. Add 1 ms to prefill.

Shot 024. Plasma. Full length.

Next shot. No changes

Shot 025. Plasma. Full length.

Last shot.

Session Leader Comments
Aug 25 2000 09:26:35:967AM1000825001Steve Wukitch001 plasma - two brief elm free H-modes
H/D started at >0.1 and climbed to 0.2
total RF was 1.6MW

next shot: raise contribution from J to 1 MW
Aug 25 2000 09:41:26:500AM1000825002Steve Wukitch002 plasma - disrupted 1.4 sec
H/D started at >0.15 and climbed to ~0.3
total RF was 1.8MW

next shot: raise contribution from J to 1.2 MW and E-port off
Aug 25 2000 10:02:35:797AM1000825003Steve Wukitch003 plasma - disrupted 1.36 sec
H/D started at ~0.15 and climbed to ~0.3
total RF was 1.4MW
right gap ~1.2 cm

next shot: increase right gap to 2 cm
Aug 25 2000 10:14:01:797AM1000825004Steve Wukitch004 plasma
H/D started at ~0.15 and climbed to ~0.3
total RF was 1.4MW till J4 faults off
right gap ~2 cm

next shot: raise J power to 1.2 MW
decrease nl_04 target 10%
Aug 25 2000 10:30:20:920AM1000825005Steve Wukitch005 plasma
H/D started at ~0.2 and climbed to ~0.3
total RF was 1.6 MW till J faults off
right gap ~2 cm

next shot: raise J power to 1.4 MW and D-port off

Aug 25 2000 10:51:30:653AM1000825006Steve Wukitch006 plasma disrupted 1.145 sec
H/D started at ~0.2 and increased to 0.4
total RF was 1.5MW with few J faults

next shot: repeat with Ar puff off

Aug 25 2000 11:05:03:530AM1000825007Steve Wukitch007 plasma disrupted 1.15 sec
H/D started at ~0.2 and increased to 0.4
total RF was 1.5MW with few J faults

next shot: repeat with D and E-port / J-port off

Aug 25 2000 11:27:26:873AM1000825008Steve Wukitch008 plasma
total RF was 1.5MW

next shot: repeat with D and E-port off/ J-port on

Aug 25 2000 11:56:00:013AM1000825009Steve Wukitch009 plasma disrupted 1.1
total RF was 1.5MW

next shot: increase field to 5.4 T
reduce J-port and enable D and E
Aug 25 2000 12:04:05:200PM1000825010Steve Wukitch010 plasma disrupted 1.08
total RF was 1.5 MW
D-port failed

next shot: increase field to 5.6 T
D-port on for 50 msec without E
Aug 25 2000 12:20:41:170PM1000825011Steve Wukitch011 plasma disrupted 1.08
total RF was 2 MW

J-port injection killed the plasma k-port upper corner - same as last shot

next shot: increase field to 5.8 T
J-port off

Aug 25 2000 12:37:30:483PM1000825012Steve Wukitch012 plasma
total RF was 1.5 MW
BT~5.75 T

next shot: increase field to 5.9 T

Aug 25 2000 01:04:03:450PM1000825013Steve Wukitch013 plasma
total RF was 1.5 MW before D-port faults
BT~5.8 T

next shot: retune and try again

Aug 25 2000 01:19:18:560PM1000825014Steve Wukitch014 plasma
total RF was .75 MW (D-port faulted)
BT~5.8 T

next shot: stagger D and E

Aug 25 2000 01:49:32:217PM1000825015Steve Wukitch015 plasma
total RF was 1.5 MW till D-port faulted
BT~5.8 T

next shot: less overlap on D and E

-
Aug 25 2000 02:10:23:797PM1000825016Steve Wukitch016 no power
Aug 25 2000 02:40:24:763PM1000825017Steve Wukitch017 plasma
D-port ran but E-port failed
J-port performed poorly

next shot: repeat
Aug 25 2000 03:14:58:403PM1000825019Steve Wukitch019 plasma
no E-port
D-port ran
J4 failed
J3 ran

next shot: back to 5.2 T
Aug 25 2000 03:49:07:437PM1000825020Steve Wukitch020 fizzle
Aug 25 2000 04:04:52:763PM1000825021Steve Wukitch021 plasma disrupted ~1.4

total PRF~2.4 MW
J-port injection

next shot: turn session over to Sanjay
Aug 25 2000 04:06:23:217PM1000825022 BFSP Injection of C2D4

15.6 torr of C2D4 in FSP plenum

FSP firing at 0.60, 0.80, 1.0 seconds
NINJA timing: trigger: -1.0, duration: 1.25
deep insertion of FSP ( ~ +3 mm)

PPPL Xybion gates: 0.55 ms, 0.55 ms, 0.55 ms
LANL Xybion gates: 0.95 ms, 0.95 ms, 0.95 ms
Viewing through CII/CIII beam-splitter

Missed first scan - plasma gets "blown away" by
some injection.

Good data on other two scan, though exposures
are low.

Next shot - repeat, with increased exposures
Aug 25 2000 04:20:46:730PM1000825023 BFSP Injection of C2D4

15.4 torr of C2D4 in FSP plenum

FSP firing at 0.60, 0.80, 1.0 seconds
NINJA timing: trigger: -1.0, duration: 1.25
deep insertion of FSP ( ~ +3 mm)

PPPL Xybion gates: 0.60 ms, 0.60 ms, 0.60 ms
LANL Xybion gates: 1.025 ms, 1.025 ms, 1.025 ms
Viewing through CII/CIII beam-splitter

Fizzle. Try again next shot.
Aug 25 2000 04:42:27:857PM1000825024 BFSP Injection of C2D4

15.4 torr of C2D4 in FSP plenum

FSP firing at 0.60, 0.80, 1.0 seconds
NINJA timing: trigger: -1.0, duration: 1.25
deep insertion of FSP ( ~ +3 mm)

PPPL Xybion gates: 0.60 ms, 0.60 ms, 0.60 ms
LANL Xybion gates: 1.025 ms, 1.025 ms, 1.025 ms
Viewing through CII/CIII beam-splitter

Again, something strange happens on the first
scan (0.6 s). Data from other two scans looks
good.

Next scan - move probe further out, and adjust
exposures accordingly.
Aug 25 2000 05:01:14:640PM1000825025 BFSP Injection of C2D4

15.3 torr of C2D4 in FSP plenum

FSP firing at 0.70, 0.90, 1.1 seconds
NINJA timing: trigger: -1.0, duration: 1.25
shallow insertion of FSP ( ~ +10 mm)

PPPL Xybion gates: 0.60 ms, 0.60 ms, 0.60 ms
LANL Xybion gates: 1.05 ms, 1.025 ms, 1.05 ms
Viewing through CII/CIII beam-splitter

Good data for first two scans. Last scan,
made a mistake and had 6.0 ms exposure instead
of 0.6 ms for PPPL camera. Good LANL data.

End of run.

Physics Operator Comments
Aug 25 2000 08:48:54:217AMBill RowanRun Plan and Engineering Setup for 1000825

MP268 ICRF Commissioning
MP276 SOL Trans/Burping (Piggyback)

Session Leader: S. Wukitch
Physics Operator: B. Rowan
Engineering Operators: B. Cochran/G. Dekow

Engineering Setup:

Overnight ECDC in D2, stopping 1-2 hours before run.

Run begins 9:00 and ends at 15:00.

Power system setup: Same as for 1000824026 (5.2 T, 0.8 MA, inner wall diverted)

Set OH1, OH2U and OH2L fizzle delays at 300ms
Set TF fizzle delay at 400 ms


Gas setup: B-Top 6 psi D2 Hybrid Enabled
B-side lower 1 psi Argon Hybrid DISABLED
B-side upper leave as is Hybrid DISABLED
C-side 30 psi D2 Hybrid Enabled
J-bottom leave as is Hybrid DISABLED

The following Gate Valves should be ENABLED, assuming no vacuum problems:

ECE, VUV


Run Plan:

Load from shot 1000824026

Conduct ICRF commissioning according to SL desires

ICRF after 0.7 s to facilitate burping probe experiment

Perhaps diverted discharges later in the day for burping probe experiments.
Per Sanjay, reference shot for this is 1000517019 (0.8 MA, 5.2 T, 10^20 m^-3)


Delay in start. Note from Irby:
A failure in a HEAT PLC module caused a trip of the HEAT breaker.
Willy and Gary have been working on the problem since very early this
morning, and the start time estimate assumes they are able to fix
the problem. The vessel average temp dropped below -60C and
minimum temps reached -125C. No leaks however.

Started PCS and loaded shot 1000824026

Did cold start. With this result
rtnode -- data loaded, A matrix responds
rtnode -- data loaded, M matrix responds
rtnode -- data loaded, PID matrix responds
RT_NODE Done
25-AUG-2000 08:41:26.48 doing TCL command TYPE *************** END COLD
START ******************
*************** END COLDSTART ******************
Aug 25 2000 09:29:05:920AM1000825001Bill RowanShot 001. Plasma. Breakdown consistent with reference shot 1000824026.
Couple of brief H-modes following 0.73 s.
Aug 25 2000 09:43:21:340AM1000825002Bill RowanShot 002. Plasma. Reduced right gap by approx 0.002 m. Half the request of the SL.
Disruption at approx. 1.4 s.

Next shot. Will make an additional reduction in right gap.
RF will be reduced by the increment made for shot 002.

Aug 25 2000 09:59:05:467AM1000825003Bill RowanShot 003. Plasma. Right gap responded to changes as expected.
Disruption occurred at a slightly earlier time, and there was
evidence of high radiated power at an earlier time than the previous shot.

Next shot. Returning to right gap used on shot 001. Testing whether this is
related to the disruption.
Aug 25 2000 10:16:10:420AM1000825004Bill RowanShot 004.. Plasma. Returned to behavior of shot 001.

Next shot. Lowering density by 10%.
At request of Rice and with approval of SL, increased argon puff from 25ms to 30 ms.
Beginning Argon puffing on shot 005
Aug 25 2000 10:31:26:653AM1000825005Bill RowanShot 005. Plasma.

Next shot. No changes.
Aug 25 2000 10:52:31:577AM1000825006Bill RowanShot 006. Plasma. Disruption at 1.15 s.

Next shot. Disabled Ar puffing.
Aug 25 2000 11:04:15:077AM1000825007Bill RowanShot 007. Plasma. Disruption at 1.26 s

Note changes in RF (SL log) for next shot to look for source of disruption.
Aug 25 2000 11:08:10:780AM1000825007Bill RowanOn this shot, increased noise on F-side pressure. Mean seems unchanged from previous shot.
Aug 25 2000 11:27:22:937AM1000825008Bill RowanShot 008. Plasma. Plasma current past 1.8 s.

Next shot.
Note changes in RF (SL log) for next shot to look for source of disruption.

Aug 25 2000 11:39:09:937AM1000825009Bill RowanShot 009. Plasma. Disruption at 1.16 s.

Next shot. Increase BT to approx. 5.4 T
Aug 25 2000 12:03:54:810PM1000825010Bill RowanShot 010. Plasma. Disruption at 1.07 s. At t = 0.52, BT = 5.4

Next shot. Increase BT to arrox. 5.6 T
Aug 25 2000 12:26:13:450PM1000825011Bill RowanShot 011. Plasma. Disruption at 1.1 s. At t - 0.59, BT = 5.56 T

Next shot. Increase BT to approx. 5.8 T
Aug 25 2000 12:45:19:373PM1000825012Bill RowanShot 012. Plasma. Full length shot. At t = 0.56, BT = 5.73

Next shot. Increase BT to approx. 5.9 T.
Aug 25 2000 12:59:45:730PM1000825013Bill RowanShot 013. Plasma. Full length. At t = 0.80 s, BT = 5.8 T

Next shot. No changes.
Aug 25 2000 01:29:45:937PM1000825014Bill RowanShot 014. Plasma. Full length.

Before the next shot: Cell access for Childs.

Next shot. No changes
Aug 25 2000 01:53:31:530PM1000825015Bill RowanShot 015. Plasma

Next shot. No changes.
Aug 25 2000 02:13:50:403PM1000825016Bill RowanShot 016. No power shot. Engineering problem.
Aug 25 2000 02:41:47:340PM1000825017Bill RowanShot 017. Plasma. Disruption at 1.5 s.

Next shot. No changes.
Aug 25 2000 02:49:16:107PM1000825018Bill RowanShot 018. No TF
Aug 25 2000 03:07:34:450PM1000825019Bill RowanShot 019. Plasma. Full length shot.

Dekow taking over as EO.
Aug 25 2000 03:11:21:843PM1000825019Bill RowanFor next shot: Reduce BT to approx 5.2 T
Aug 25 2000 03:46:56:297PM1000825021Bill RowanShot 021. Plasma. Disruption at 1.4 s.
Last shot for MP268 ICRF Commissioning.

Next shot: Transition to MP 276. SOL Trans/Burping probe. RF off.
Aug 25 2000 04:06:20:480PM1000825022Bill RowanShot 022. Plasma. Full length shot.

Next shot. No changes.
Aug 25 2000 04:24:38:060PM1000825023Bill RowanShot 023. Fizzle

Next shot. Add 1 ms to prefill.
Aug 25 2000 04:39:55:717PM1000825024Bill RowanShot 024. Plasma. Full length.

Next shot. No changes
Aug 25 2000 04:55:04:843PM1000825025Bill RowanShot 025. Plasma. Full length.

Last shot.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:10:11:857AMPlasmaOk
209:30:28:310AMPlasmaOk
309:47:30:000AMPlasmaOk
410:02:30:077AMPlasmaOk
510:18:55:560AMPlasmaOk
610:36:40:890AMPlasmaOk
710:53:11:920AMPlasmaOk
811:12:29:873AMPlasmaOk
911:29:56:793AMPlasmaOk
1011:50:40:450AMPlasmaOk
1112:10:46:810PMPlasmaOk
1212:31:01:170PMPlasmaOk
1312:54:19:327PMPlasmaOk
1401:14:52:153PMPlasmaOk
1501:42:13:733PMPlasmaOk
1602:08:24:497PMPlasmaBadShot Aborted
1702:23:27:247PMPlasmaOk
1802:46:03:420PMPlasmaBadNo TF
1903:01:32:310PMPlasmaOk
2003:21:53:840PMPlasmaOk
2103:36:06:560PMPlasmaOk
2203:57:31:920PMPlasmaOk
2304:16:57:310PMPlasmaOk
2404:30:02:810PMPlasmaOk
2504:52:07:750PMPlasmaOk