| Miniproposals | ||||||||||||
|
| Operators | |
| Session leader(s): | Steve Wukitch,John Goetz |
| Physics operator(s): | Ian Hutchinson |
| Engineering operator(s): | Bill Byford,Bill Cochran |
| Engineering Operator Run Comment |
| RF Development Hutchinson/Wukitch/Cochran/Byford. |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Entered: Jul 7 2004 03:49:24:837PM |
| Author: To Be Determined |
| Engineering Setup for 1000913 RF development. Overnight ECDC in Deuterium. RF work will be going on in the cell during the morning. First shot is planned for High Noon. Power Systems setup as on 1000831024 (note: Chopper timing.) Gas System: Gas setup - fill B-top with 6 psi of D2 Hybrid enabled fill B-side lower with 1 psi of Ar Hybrid enabled fill B-side upper with 35 psi of D2, available for between-shot ECDC, Hybrid DISABLED fill C-side with 30 psi of D2 Hybrid enabled fill J-bottom with 30 psi of D2 Hybrid DISABLED NINJA - D2 in plenum for A-B limiter puffer at 10 psi The following gate valves should be enabled, assuming no vacuum problems: ECE, VUV DNB gate valve will be DISABLED for the beginning of the run; may enable later.FMIT#2 MW coefficients ---------------------------------------------------------------------------------------- The principal objectives for the run tomorrow are: 1. Verify J-port operational capability into vacuum. (10 shots) 2. Verify J-port operational capability into plasma. (3 shots) 3. Measure loading as a function of power comparing D, E, and J-port as a two strap. (1 shot) 4. Measure J, D, and E-port heating efficiency up to 1.5 MW each - L-mode required. (3 shots) 5. In diverted plasmas, verify simultaneous operational capability of D, E, and J-port antennas. (2 shots) 6. In diverted plasmas, maximize injected power. (5 shots) ---------------------------------------------------------------------------------------- begin with verifying operational capability of D and E into plasma we are waiting for the SF6 to fill J3 9" transmission line - 001 plasma, EDA, Ip~ 1 MA, BT~5.4 D: 1 MW one fault each -arc E: 1 MW one fault each - phase balance next shot: raise power to 1.3 MW each 002 plasma, EDA, Ip~ 1 MA, BT~5.4 D: 1.4 MW 5 faults E: 1.3 MW 4 faults - phase balance next shot: repeat 003 fizzle 004 D-port: draw 1.3MW from 0.7 to 1.4s E-port; draw 1.3MW from 0.7 to 1.4s J-port; off Results: plasma; diverted; 5.4T; 1MA; EDA, big injection - low Z 170kJ; H~2->1.8 D-port; 1.4MW; 2 faults (mixture) E-port; 1.3MW; 2 faults (mixture) 005 D-port: draw 1.3MW from 0.7 to 1.4s E-port; draw 1.3MW from 0.7 to 1.4s J-port; off Results: plasma; diverted; 5.4T; 1MA; EDA, big injection 187kJ; H~2->1.8 D-port; 1.4MW; 3 faults E-port; 1.3MW; 3 faults an unrequested BT wiggle ~0.9 sec 006 D-port: draw 1.3MW from 0.7 to 1.4s E-port; draw 1.3MW from 0.7 to 1.4s J-port; off Results: plasma; diverted; 5.4T; 1MA; EDA, big injection 180kJ; H~2->1.8 D-port; 1.4MW; 1 faults E-port; 1.3MW; 0 faults BT wiggle ~0.9 sec next shot: bring up J-port at 0.6 sec 007: D-port: draw 1.3MW from 0.7 to 1.4s E-port; draw 1.3MW from 0.7 to 1.4s J-port; draw 0.5MW from 0.6 to 1.4s Results: plasma; diverted; 5.4T; 1MA; EDA; early disruption from Mo; continuous increase in radiated power 160kJ; H~1.8 D-port; 1.4MW; no faults E-port; 1.3MW; no faults J-port; 0.5MW; one fault (DC1) 008 fizzle 009 fizzle 010 D-port: draw .3MW from 0.7 to 1.4s E-port; draw .3MW from 0.7 to 1.4s J-port; draw .3 MW from 0.6 to 1.4 s Results: plasma; H-mode at 200 kW, diverted; 5.2T; 1MA D-port; 0.3 MW; 0 faults E-port; 0.3MW; 0 faults BT wiggle ~0.9 sec next shot: square up the pulses at 0.8 MW each 011: D-port: draw 0.8MW from 0.9 to 1.15s E-port; draw 0.8MW from 1.2 to 1.45s J-port; draw 0.8MW from 0.6 to 0.85s Results: plasma; limited; 5.4T; 1MA D-port; 0.8MW; no faults E-port; 0.8MW; no faults J-port; 0.8MW; on faults the performance of J-port is not good - only a small increase in Te, neutron rate, and no change in stored energy 012 D-port: draw 1.25 MW from 0.9 to 1.15s E-port; draw 1.25 MW from 1.2 to 1.45s J-port; draw 1.25 MW from 0.6 to .85s Results: plasma inner wall limited -- density feedback not working VERY high density D-port; 1.25 MW; all faults E-port; 1.25MW; all faults J-port; 1.25 MW all faults no RF power - not tuned to this next shot: repeat, hope for a better density feedback 013 D-port: draw 1.25MW from 0.9 to 1.125s E-port; draw 1.25MW from 1.2 to 1.425s J-port; draw 1.25MW from 0.6 to 0.825s Results: plasma; upper null diverted; MARFE until 0.74s D-port; 1.0MW; no faults E-port; 1.1MW; two faults J-port; 1.2MW; max faults because of high density MARFE and then XMTR 3, IPA anode overload 014 D-port: draw 1.25MW from 0.9 to 1.125s E-port; draw 1.25MW from 1.2 to 1.425s J-port; draw 1.25MW from 0.6 to 0.825s Results: plasma; upper null diverted; disrupts during J-port pulse D-port; didn't run E-port; didn't run J-port; 1.25MW; two faults; DC1 faults; lots of impurity injections 015 D-port: draw 0.3MW ramp from 0.9 to 1.125s E-port; draw 0.3MW ramp from 1.2 to 1.425s J-port; draw 0.3MW ramp from 0.6 to 0.825s Results: plasma; upper null diverted; D-port; ramp to 0.25MW; no faults E-port; ramp to 0.25MW; no faults J-port; ramp to 0.25MW; no faults 016 D-port: draw 0.5 to 1.0MW ramp from 0.9 to 1.125s E-port; draw 0.5 to 1.0MW ramp from 1.2 to 1.425s J-port; draw 0.5 ot 1.0MW ramp from 0.6 to 0.825s Results: plasma; upper null diverted; D-port; ramp from 0.5 to 1.0MW; no faults E-port; ramp from 0.5 to 1.0MW; no faults J-port; ramp from 0.5 to 0.95MW; no faults performance comparison: D-port is better than E- is better than J The primary purpose was to compare D, E, and J antennas heating efficiency. It was obvious from the first attempt with that the 2-strap J-port configuration was not heating as well as D and E. The phase indicates monopole phasing which is known to be less efficient. This is a result of an error in the resonant loop configuration. We will begin switching to the proper loop configuration shortly. Note shot 013-016 is upper null instead of inner wall limited which is another means of raising the H-mode threshold. |
| Physics Operator Summaries |
| Entered: Jul 7 2004 04:37:11:990PM |
| Author: To Be Determined |
| Phsyop Summary 1000913 RF development J-port configured as 2-strap. SL Wukitch PO Hutch Summary _______ With the exception of fizzles caused by excessive fill pressure and Bz, and a runaway gas puff shot, things went fairly well. Got some very nice EDA plasmas heated by D & E. (1,2, 4-6) Ran inner wall limited shot. Upper Null plasma made operative for purposes of keeping in L-mode (shot 12 on). Shot 16 is a good place to start with further development. The clearin offset needs to be corrected and the trace redrawn. However, that shot is using nl_zmeter, and so wire 14 needs to be replaced for interferometer feedback. All upper nulls are in segment 3. Did the power ramps both configurations. J-port in this 2-strap configuration performed poorly today, giving major injections at power over about 0.8MW Scorecard _________ Shot,Duration(s),Ipmax(MA) Shot,Duration(s),Ipmax 1 1.945 0.992 2 1.943 0.999 3 0.000 0.026 4 1.942 0.994 5 1.942 0.994 6 1.940 0.997 7 0.992 1.008 8 0.000 0.032 9 0.000 0.026 10 1.948 0.976 11 1.954 0.789 12 1.611 0.776 13 1.907 0.752 14 0.775 0.799 15 1.912 0.770 16 1.948 0.778 Finished summary for 1000913 Total of 16 shots. 16 shots. 13 plasmas. 3 fizzles. 0 duds. Details _______ Did not start till just after noon. ---------------------------------------------------------------------------- 1000913xxx hutch PHYSICS_OPERATOR Sep 13 2000 12:03:19:373PM . . . . . . . . . . . . . . . . . . . . RF development. Late start because of RF plumbing work. Cold Start. PCS settings from yesterday. Fill gas pulse. 20ms. ICEF4 -1295. Br offset +.001T Load from 1000831024. It has gas pulse 22ms, ICEF4-1305, Br .0005T. Load from 1000831023. Startup is the same, but doesn't push the early diversion so much. Load. ---------------------------------------------------------------------------- 1000913001 hutch PHYSICS_OPERATOR Sep 13 2000 12:40:38:390PM . . . . . . . . . . . . . . . . . . . . Plasma. 2MW RF nice and steady. Hesitation in current rise. Fill lower than expected. EFIT reports the plasma outboard drifting out. But predictors are not. ICEF4 to -1295A Br offset to .001. RCur moved in 1mm at 1.3s. Next shot has a change made to the EF2 resistor tap for Engineering test. ---------------------------------------------------------------------------- 1000913002 hutch PHYSICS_OPERATOR Sep 13 2000 1:00:44:560PM . . . . . . . . . . . . . . . . . . . . Plasma. RF 2.6MW. Apparent density peaking starting just before RF terminates. Slightly worse injections. W=170kJ. The EF2 current is slightly lower in this shot. Perhaps that it the ballast change, but also the current rise was faster. ECDC between shots. 6 minutes. ---------------------------------------------------------------------------- 1000913003 hutch PHYSICS_OPERATOR Sep 13 2000 1:19:07:716PM . . . . . . . . . . . . . . . . . . . . Fizzle. Bkdwn at 7ms. Fill pressure drifted up. Fill puff to 20ms. ICEF4 to -1330A. ---------------------------------------------------------------------------- 1000913004 hutch PHYSICS_OPERATOR Sep 13 2000 1:37:38:530PM . . . . . . . . . . . . . . . . . . . . Plasma. Big injection at .93 sec, but it survives. D-port trips just BEFORE the injection. Suspicious! Install field wiggle for ECE. ---------------------------------------------------------------------------- 1000913005 hutch PHYSICS_OPERATOR Sep 13 2000 1:55:25:263PM . . . . . . . . . . . . . . . . . . . . Plasma. Very similar injection without the RF trip. No change. ---------------------------------------------------------------------------- 1000913006 hutch PHYSICS_OPERATOR Sep 13 2000 2:31:58:450PM . . . . . . . . . . . . . . . . . . . . Plasma. Injection moves to the end of the shot. W=180kJ. H/D ratio still up at about 7%. H-factor 2 assuming 90% htg. 30 minute break to fix TCI. ---------------------------------------------------------------------------- 1000913007 hutch PHYSICS_OPERATOR Sep 13 2000 2:50:53:873PM . . . . . . . . . . . . . . . . . . . . Plasma. Disrupts at 1s. Caused by progressive impurity problem started at the start of RF (D&E) J port was on at 0.5MW. Argon puff to 24ms from 22ms. ---------------------------------------------------------------------------- 1000913008 hutch PHYSICS_OPERATOR Sep 13 2000 2:58:41:233PM . . . . . . . . . . . . . . . . . . . . Fizzle. High pressure. .072 mtorr; late breakdown, .63s ICEF4 to -1305A. ---------------------------------------------------------------------------- 1000913009 hutch PHYSICS_OPERATOR Sep 13 2000 3:22:43:340PM . . . . . . . . . . . . . . . . . . . . Fizzle. p_0=0.77. That's too high. Br did not respond much. Bkdwn at 6.6ms. Lower fill puff to 18ms from 20. ICEF4 to -1310A ---------------------------------------------------------------------------- 1000913010 hutch PHYSICS_OPERATOR Sep 13 2000 3:43:18:623PM . . . . . . . . . . . . . . . . . . . . Plasma. Small RF coupling ramps. Load segment 2 from 1000906016 to segment 4. Switch to segment 4. Fill puff to 16ms. ---------------------------------------------------------------------------- 1000913011 hutch PHYSICS_OPERATOR Sep 13 2000 4:04:20:046PM . . . . . . . . . . . . . . . . . . . . Plasma. Good comparison of D, E and J antennas at .8MW. J looks really bad, even though this is supposed to be 2-strap. No changes ---------------------------------------------------------------------------- 1000913012 hutch PHYSICS_OPERATOR Sep 13 2000 4:27:00:123PM . . . . . . . . . . . . . . . . . . . . Plasma disrupts at 1.6s. Runaway puff. Interferometer died. Remove the offset from RCUR on the upper null and draw at .661 Switch to segment 3. The upper null case. Adjust the density to 0.8e20 ---------------------------------------------------------------------------- 1000913013 hutch PHYSICS_OPERATOR Sep 13 2000 4:44:00:153PM . . . . . . . . . . . . . . . . . . . . Plasma. Get nl_zmeter into wire 14 from 991112014. Scale to 0.25 units (was .48). Put EF4 demand to full reversal during the ramp-down to try to fix EF2 zero. ---------------------------------------------------------------------------- 1000913014 hutch PHYSICS_OPERATOR Sep 13 2000 5:01:05:546PM . . . . . . . . . . . . . . . . . . . . Plasma disrupts at .76s during the J-port pulse. Adjust the segment 3 cross-over to prevent thrash. ---------------------------------------------------------------------------- 1000913015 hutch PHYSICS_OPERATOR Sep 13 2000 5:22:50:936PM . . . . . . . . . . . . . . . . . . . . Plasma. Ramps down ok. EF2 just avoids zeroing. Ip offset in segment 3 to -23000. Was zero. Adjust rcur ramp out to start earlier. ---------------------------------------------------------------------------- 1000913016 hutch PHYSICS_OPERATOR Sep 13 2000 5:28:39:840PM . . . . . . . . . . . . . . . . . . . . Plasma. Some injections not attributable to RF. RF ramps 0.5-1MW on all three antennas. J-port still injecting but some signs of heating too. |
| Session Leader Comments | |||
| Sep 13 2000 12:34:49:683PM | John Goetz | The principal objectives for the run today are: 1. Verify J-port operational capability into vacuum. (10 shots) 2. Verify J-port operational capability into plasma. (3 shots) 3. Measure loading as a function of power comparing D, E, and J-port as a two strap. (1 shot) 4. Measure J, D, and E-port heating efficiency up to 1.5 MW each - L-mode required. (3 shots) 5. In diverted plasmas, verify simultaneous operational capability of D, E, and J-port antennas. (2 shots) 6. In diverted plasmas, maximize injected power. (5 shots) ---------------------------------------------------------------------------------------- begin with verifying operational capability of D and E into plasma we are waiting for the SF6 to fill J3 9" transmission line | |
| Sep 13 2000 12:32:19:950PM | 1000913001 | John Goetz | Shot 1000913001: D-port: draw 1MW from 0.7 to 1.4s E-port; draw 1MW from 0.7 to 1.4s J-port; off Results: plasma; diverted; 5.4T; 1MA; EDA 150kJ; H~1.7 D-port; 1MW; one fault E-port; 1MW; one fault |
| Sep 13 2000 12:57:29:327PM | 1000913002 | John Goetz | Shot 1000913002: D-port: draw 1.3MW from 0.7 to 1.4s E-port; draw 1.3MW from 0.7 to 1.4s J-port; off Results: plasma; diverted; 5.4T; 1MA; EDA 165kJ; H~2->1.8 D-port; 1.4MW; five faults (mixture) E-port; 1.3MW; four faults (mixture) |
| Sep 13 2000 01:08:44:937PM | 1000913003 | John Goetz | Shot 1000913003: D-port: draw 1.3MW from 0.7 to 1.4s E-port; draw 1.3MW from 0.7 to 1.4s J-port; off Results: fizzle |
| Sep 13 2000 01:43:49:000PM | 1000913004 | John Goetz | Shot 1000913004: D-port: draw 1.3MW from 0.7 to 1.4s E-port; draw 1.3MW from 0.7 to 1.4s J-port; off Results: plasma; diverted; 5.4T; 1MA; EDA interrupted by big injection 160kJ; H~1.8 after injection D-port; 1.4MW; two faults E-port; 1.3MW; two faults |
| Sep 13 2000 01:46:20:250PM | 1000913005 | John Goetz | Shot 1000913005: D-port: draw 1.3MW from 0.7 to 1.4s E-port; draw 1.3MW from 0.7 to 1.4s J-port; off Results: plasma; diverted; 5.4T; 1MA; EDA interrupted by big injection 180kJ; H>2 before injection - 160kJ; H~1.8 after injection D-port; 1.4MW; three faults (mixture) E-port; 1.3MW; three faults (mixture) |
| Sep 13 2000 02:45:45:280PM | 1000913007 | John Goetz | Shot 1000913007: D-port: draw 1.3MW from 0.7 to 1.4s E-port; draw 1.3MW from 0.7 to 1.4s J-port; draw 0.5MW from 0.6 to 1.4s Results: plasma; diverted; 5.4T; 1MA; EDA; early disruption from Mo; continuous increase in radiated power 160kJ; H~1.8 D-port; 1.4MW; no faults E-port; 1.3MW; no faults J-port; 0.5MW; one fault (DC1) |
| Sep 13 2000 03:40:23:327PM | 1000913010 | John Goetz | Shot 1000913010: D-port: draw 0.3MW ramp from 0.9 to 1.15s E-port; draw 0.3MW ramp from 1.2 to 1.45s J-port; draw 0.3MW ramp from 0.6 to 0.85s Results: plasma; diverted; 5.4T; 1MA; Bt waggle had an H-mode transition so shot is no good D-port; 0.3MW; no faults E-port; 0.3MW; no faults J-port; 0.3MW; on faults |
| Sep 13 2000 03:59:58:437PM | 1000913011 | John Goetz | Shot 1000913011: D-port: draw 0.8MW from 0.9 to 1.15s E-port; draw 0.8MW from 1.2 to 1.45s J-port; draw 0.8MW from 0.6 to 0.85s Results: plasma; limited; 5.2T; 1MA D-port; 0.8MW; no faults E-port; 0.8MW; no faults J-port; 0.8MW; on faults the performance of J-port is not good - only a small increase in Te, neutron rate, and no change in stored energy |
| Sep 13 2000 04:07:42:827PM | 1000913012 | John Goetz | Shot 1000913012: D-port: draw 1.25MW from 0.9 to 1.125s E-port; draw 1.25MW from 1.2 to 1.425s J-port; draw 1.25MW from 0.6 to 0.825s Results: plasma; runaway density antennas didn't run |
| Sep 13 2000 04:37:17:123PM | 1000913013 | John Goetz | Shot 1000913013: D-port: draw 1.25MW from 0.9 to 1.125s E-port; draw 1.25MW from 1.2 to 1.425s J-port; draw 1.25MW from 0.6 to 0.825s Results: plasma; upper null diverted; MARFE until 0.74s D-port; 1.0MW; no faults E-port; 1.1MW; two faults J-port; 1.2MW; max faults because of high density MARFE and then XMTR 3, screen overload |
| Sep 13 2000 04:57:13:607PM | 1000913014 | John Goetz | Shot 1000913014: D-port: draw 1.25MW from 0.9 to 1.125s E-port; draw 1.25MW from 1.2 to 1.425s J-port; draw 1.25MW from 0.6 to 0.825s Results: plasma; upper null diverted; disrupts during J-port pulse D-port; didn't run E-port; didn't run J-port; 1.25MW; two faults; DC1 faults; lots of impurity injections |
| Sep 13 2000 05:11:21:467PM | 1000913015 | John Goetz | Shot 1000913015: D-port: draw 0.3MW ramp from 0.9 to 1.125s E-port; draw 0.3MW ramp from 1.2 to 1.425s J-port; draw 0.3MW ramp from 0.6 to 0.825s Results: plasma; upper null diverted; D-port; ramp to 0.25MW; no faults E-port; ramp to 0.25MW; no faults J-port; ramp to 0.25MW; no faults |
| Sep 13 2000 05:55:03:483PM | 1000913016 | John Goetz | Shot 1000913016: D-port: draw 0.5 to 1.0MW ramp from 0.9 to 1.125s E-port; draw 0.5 to 1.0MW ramp from 1.2 to 1.425s J-port; draw 0.5 ot 1.0MW ramp from 0.6 to 0.825s Results: plasma; upper null diverted; D-port; ramp from 0.5 to 1.0MW; no faults E-port; ramp from 0.5 to 1.0MW; no faults J-port; ramp from 0.5 to 0.95MW; no faults performance comparison: D-port is better than E- is better than J |
| Physics Operator Comments | |||
| Sep 13 2000 12:03:19:373PM | Ian Hutchinson | RF development. Late start because of RF plumbing work. Cold Start. PCS settings from yesterday. Fill gas pulse. 20ms. ICEF4 -1295. Br offset +.001T Load from 1000831024. It has gas pulse 22ms, ICEF4-1305, Br .0005T. Load from 1000831023. Startup is the same, but doesn't push the early diversion so much. Load. | |
| Sep 13 2000 12:40:38:390PM | 1000913001 | Ian Hutchinson | Plasma. 2MW RF nice and steady. Hesitation in current rise. Fill lower than expected. EFIT reports the plasma outboard drifting out. But predictors are not. ICEF4 to -1295A Br offset to .001. RCur moved in 1mm at 1.3s. Next shot has a change made to the EF2 resistor tap for Engineering test. |
| Sep 13 2000 01:00:44:560PM | 1000913002 | Ian Hutchinson | Plasma. RF 2.6MW. Apparent density peaking starting just before RF terminates. Slightly worse injections. W=170kJ. The EF2 current is slightly lower in this shot. Perhaps that it the ballast change, but also the current rise was faster. ECDC between shots. 6 minutes. |
| Sep 13 2000 01:19:07:717PM | 1000913003 | Ian Hutchinson | Fizzle. Bkdwn at 7ms. Fill pressure drifted up. Fill puff to 20ms. ICEF4 to -1330A. |
| Sep 13 2000 01:37:38:530PM | 1000913004 | Ian Hutchinson | Plasma. Big injection at .93 sec, but it survives. D-port trips just BEFORE the injection. Suspicious! Install field wiggle for ECE. |
| Sep 13 2000 01:55:25:263PM | 1000913005 | Ian Hutchinson | Plasma. Very similar injection without the RF trip. No change. |
| Sep 13 2000 02:31:58:450PM | 1000913006 | Ian Hutchinson | Plasma. Injection moves to the end of the shot. W=180kJ. H/D ratio still up at about 7%. H-factor 2 assuming 90% htg. 30 minute break to fix TCI. |
| Sep 13 2000 02:50:53:873PM | 1000913007 | Ian Hutchinson | Plasma. Disrupts at 1s. Caused by progressive impurity problem started at the start of RF (D&E) J port was on at 0.5MW. Argon puff to 24ms from 22ms. |
| Sep 13 2000 02:58:41:233PM | 1000913008 | Ian Hutchinson | Fizzle. High pressure. .072 mtorr; late breakdown, .63s ICEF4 to -1305A. |
| Sep 13 2000 03:22:43:340PM | 1000913009 | Ian Hutchinson | Fizzle. p_0=0.77. That's too high. Br did not respond much. Bkdwn at 6.6ms. Lower fill puff to 18ms from 20. ICEF4 to -1310A |
| Sep 13 2000 03:43:18:623PM | 1000913010 | Ian Hutchinson | Plasma. Small RF coupling ramps. Load segment 2 from 1000906016 to segment 4. Switch to segment 4. Fill puff to 16ms. |
| Sep 13 2000 04:04:20:047PM | 1000913011 | Ian Hutchinson | Plasma. Good comparison of D, E and J antennas at .8MW. J looks really bad, even though this is supposed to be 2-strap. No changes |
| Sep 13 2000 04:27:00:123PM | 1000913012 | Ian Hutchinson | Plasma disrupts at 1.6s. Runaway puff. Interferometer died. Remove the offset from RCUR on the upper null and draw at .661 Switch to segment 3. The upper null case. Adjust the density to 0.8e20 |
| Sep 13 2000 04:44:00:153PM | 1000913013 | Ian Hutchinson | Plasma. Get nl_zmeter into wire 14 from 991112014. Scale to 0.25 units (was .48). Put EF4 demand to full reversal during the ramp-down to try to fix EF2 zero. |
| Sep 13 2000 05:01:05:547PM | 1000913014 | Ian Hutchinson | Plasma disrupts at .76s during the J-port pulse. Adjust the segment 3 cross-over to prevent thrash. |
| Sep 13 2000 05:22:50:937PM | 1000913015 | Ian Hutchinson | Plasma. Ramps down ok. EF2 just avoids zeroing. Ip offset in segment 3 to -23000. Was zero. Adjust rcur ramp out to start earlier. |
| Sep 13 2000 05:28:39:840PM | 1000913016 | Ian Hutchinson | Plasma. Some injections not attributable to RF. RF ramps 0.5-1MW on all three antennas. J-port still injecting but some signs of heating too. |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 12:13:13:340PM | Plasma | Ok | |
| 2 | 12:38:48:310PM | Plasma | Ok | |
| 3 | 12:58:08:373PM | Plasma | Ok | |
| 4 | 01:18:35:810PM | Plasma | Ok | |
| 5 | 01:36:16:577PM | Plasma | Ok | |
| 6 | 01:53:44:983PM | Plasma | Ok | |
| 7 | 02:30:27:153PM | Plasma | Ok | |
| 8 | 02:49:29:140PM | Plasma | Ok | |
| 9 | 03:05:14:950PM | Plasma | Ok | |
| 10 | 03:22:32:357PM | Plasma | Ok | |
| 11 | 03:41:41:077PM | Plasma | Ok | |
| 12 | 04:02:13:060PM | Plasma | Ok | |
| 13 | 04:24:55:420PM | Plasma | Ok | |
| 14 | 04:42:30:153PM | Plasma | Ok | |
| 15 | 04:59:45:763PM | Plasma | Ok | |
| 16 | 05:21:51:123PM | Plasma | Ok | |