Alcator C-Mod Run 1001121 Information

Back to runs

Miniproposals
Miniproposal:267
Date Filed: 4/4/2000
Title:Dependence of SOL Fluctuations and Particle Transport on Collisionality
First Author:Brian Labombard
Session Leader:Brian Labombard (shots 1-10)

Operators
Session leader(s):Brian Labombard
Physics operator(s):Dmitri Mossessian
Engineering operator(s):Bill Parkin,Bill Cochran

Engineering Operator Run Comment
MP #267 SOL fluct. Mossessian/Labombard/Cochran/Parkin.

Session Leader Plans

Physics Operators Plans

Session Leader Summaries
Entered: Jul 7 2004 03:49:25:460PM
Author: To Be Determined
11/21/00 run: MP#267 - reversed field

"Dependence of SOL Fluctuations and Particle Transport on Collisionality"
- reversed field, Day 2 continued...

Session Leader - B. LaBombard
Phys Op - D. Mossessian

________________________________________________________________________________
Reason for today's run:
The plan today was to complete the remaining portion of the second half
of the Day 2 plan, covering two densities at Bt=4 tesla and three densities at
6 tesla. Even though these discharges have been tough to obtain, it was
considered critical to continue pursuing them because they should help us sort
out differences between Ip and q scalings of the SOL transport/turbulence. But,
considering the effort that has been invested in obtaining these data, it is going
to be tough for the results, however interesting they are, to match expectations.
________________________________________________________________________________
Today's plan:

The plan was to make use of a 1/2 day run (starting at 2:00 p.m.) following
the repair of the alternator motor.

Start with shot 1001116007
Ip = 0.8 MA, Bt = 4 tesla, change density program to NL04 ~ 0.9
Good equilibrium and FSP/ASP target is essential.

Take two shots at each condition to optimize scanning
probe insertion depths.

NL04 = 0.9, Ip = 0.8, Bt = 4
NL04 = 1.2, Ip = 0.8, Bt = 4

NL04 = 1.2, Ip = 0.8, Bt = 6
NL04 = 0.9, Ip = 0.8, Bt = 6
NL04 = 0.6, Ip = 0.8, Bt = 6
________________________________________________________________________________
Results:
We managed to complete the MP today. We got 7 shots spanning the density
and field range that we wanted, most with good probe targeting and C2D4 plumes.
Sanjay should have plenty of plume data for his thesis. The turbulence imaging system
was also operated today (except for shot 10 with He puff off).
At this time we can not report on the dependence of the SOL transport
and turbulence on the the magnitude of Bt (or q, density,...) in reversed field
versus normal field conditions. This will require the usual detailed analysis,
which takes some time. But we now have a fairly nice reverse field database to chew
on. - Many thanks to the operations crew who put up with us.
We did note today something about the density 'bursts' in the SOL, which
if understood, could be an important piece in the SOL transport puzzle: During previous
normal Bt/Ip operation, it was noted that a 'parallel flow burst' directed away from
the outer divertor (presumably along field lines) was often associated with an 'ion
saturation burst' event in the SOL. In contrast, during reversed Bt/Ip operation, the 'parallel
flow bursts' are now directed towards the outer divertor. Thus the simple idea that these
flow bursts are caused by an 'ionization burst' in the divertor does not hold up. The
observation suggests that the parallel flow bursts care about the direction
of ExB in the SOL. Perhaps a tight coupling between ExB and parallel flows might exist
in the SOL, even over the time evolution of the 'bursts and blobs', such that the
local ExB perturbation drives primarily a 'toroidal flow burst'. But this is just idle
speculation at the moment.
________________________________________________________________________________

Shot Notes:

Setup for this run, unless otherwise noted:
ASP and FSP N-S in Vf mode, E-W in SINGLE probe sweep mode
ASP still has problem with shorts on East probe.

Shot 1 - Ip =0.8, NL04 =0.9, Bt=4.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
He puff on, C2D4 on.
FSP 5+ mm outside LCFS
ASP did not make it far enough.
Note: parallel flow 'bursts' now are towards the divertor.

Shot 2 - Ip =0.8, NL04~ 1 and ramping, Bt=4.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
He puff on, C2D4 on.
FSP 5+ mm outside LCFS

Shot 3 - Ip =0.8, NL04 =0.92 and ramping, Bt=4.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
He puff on, C2D4 on.
FSP 5+ mm outside LCFS
Good targeting on ASP, some arcing.

Shot 4 - Ip =0.8, NL04 ~.9, Bt=6.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
He puff on, C2D4 on.
FSP 5+ mm outside LCFS
Good targeting on ASP

Shot 7 - Ip =0.8, NL04 ~.6 ramping to 0.8 (from He puff), Bt=6.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
He puff on, C2D4 on.
ASP goes deep

Shot 9 - Ip =0.8, NL04 ~1 ramping to 1.2, Bt=6.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
He puff on, C2D4 on.
ASP goes deep

Shot 10 - Ip =0.8, NL04 ~.6, Bt=6.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
NO He puff, C2D4 on.
ASP goes deep, FSP goes deep.
Plumes do NOT show expected flow toward divertor with strong ExB.
Strange plume seen on top camera during third scan.

Physics Operator Summaries
Entered: Jul 7 2004 04:37:12:690PM
Author: To Be Determined
Physop summary for Tuesday, November 21, run 1001121

_________________________________________________
Engineering Setup for Tuesday, November 21

In support of MP#267 SOL fluctuations

SL LaBombard
PO Mossessian

Engineering setup:
-------------------

Run begins 13:00 (or as soon as we have the alternator) and ends at 18:00

Power System Setup: Same as on 1001109022

Gas setup - fill B-top with 6 psi of D2 Hybrid enabled
fill B-side lower with 1 psi of Ar Hybrid DISABLED
fill B-side upper with 35 psi of D2 Hybrid DISABLED, for ECDC
fill C-side with 30 psi of D2 Hybrid enabled
leave J-bottom as is Hybrid DISABLED

The following gate valves should be enabled, assuming no vacuum problems:
ECE, VUV, DNB, Beast

The following transmitters should be turned on 1, 2, and 4

Run Plan (LaBombard)
-------------------
Start with shot 1001116007
Ip = 0.8 MA, Bt = 4 tesla
Good equilibrium and FSP/ASP target is essential.

Take two shots at each condition to optimize scanning
probe insertion depths.

NL04 = 0.9, Ip = 0.8, Bt = 4
NL04 = 1.2, Ip = 0.8, Bt = 4

NL04 = 1.2, Ip = 0.8, Bt = 6
NL04 = 0.9, Ip = 0.8, Bt = 6
NL04 = 0.6, Ip = 0.8, Bt = 6

______________________________
*******************************************************

Scorecard:
10 shots
3 fizzles

Summary:

Run started at 14:00 and was rather successful. Out of 10 shots we had 3 fizzles (all because
fields were wondering around).Generally, the startup was not very reliable. In most cases plasma was bouncing off
outer wall at around 0.015. No major problems or PCS changes, apart from planned field and
density programming (see details below).

Best startups are shots 09 and 10.

Details:

1001121001 Plasma. Hits the outer wall at 0.015 sec and barely survives.

For next shot: nl04 -> 1.2e20, RCUR up by 0.25 at 1.5 sec trying to keep
the right gap constant.

1001121002 Plasma. Bz dropped a little by itself helping the startup problem

For next shot: nl04 -> 0.9e20 again. No other changes

1001121003 Plasma. Startup as in shot 1.

For next shot: Drop Bz IC_EF4 1325 -> 1320. Bt to 6 T

1001121004 Plasma. Dropping Bz didn't help - still hitting outer wall at 0.017 sec

For next shot: Pulse_gas4 22 msec -> 24 msec (to slow current rise),
tweak right gap (RCUR down 1 mm) to keep it const, nl04 ->6e19

1001121005 Fizzle. Late breakdown and Br dropped, lifting it too high.

For next shot: add 1 mT to Br offset, bring pulse_gas4 to 23 msec (just in case)

1001121006 Fizzle. Somewhat earlier breakdown than in shot 5, but Br is too high and Bz
looks too low.
SPANNA crushed after this shot.

Started up PCS again and loaded shot 4, changing nl04 to 0.6e20.

1001121007 Plasma. Late breakdown (0.01) but nice smooth current rise.

For next shot: no startup changes. NL04 ->1.2e20. RCUR down by 1 mm.

1001121008 Fizzle. Late breakdown. Steve thinks Bz too low.

For next shot: IC_EF4 up 1320 ->1335

1001121009 Plasma.

For next shot: nl04 -> 0.6e20

1001121010 Plasma.

Session Leader Comments
Nov 21 2000 02:30:43:950PM1001121001Brian LabombardShot 1 - Ip =0.8, NL04 =0.9, Bt=4.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
He puff on, C2D4 on.
FSP 5+ mm outside LCFS
ASP did not make it far enough.
Note: parallel flow 'bursts' now are towards the divertor.

Next shot: Go to NL04 = 1.2 (then maybe repeat NL04=0.9 to get better target.)
Nov 21 2000 03:10:22:530PM1001121003Brian LabombardShot 3 - Ip =0.8, NL04 =0.92 and ramping, Bt=4.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
He puff on, C2D4 on.
FSP 5+ mm outside LCFS
Good targeting on ASP, some arcing.

Next shot: Stay at NL06=0.9, go to 6 tesla.
Nov 21 2000 04:41:39:793PM1001121004Brian LabombardShot 4 - Ip =0.8, NL04 ~.9, Bt=6.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
He puff on, C2D4 on.
FSP 5+ mm outside LCFS
Good targeting on ASP

Next shot: go to NL04 ~ 0.6
Nov 21 2000 04:47:06:060PM1001121007Brian LabombardShot 7 - Ip =0.8, NL04 ~.6 ramping to 0.8 (from He puff), Bt=6.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
He puff on, C2D4 on.
ASP goes deep

Next shot: go to NL04 ~ 1.2
Nov 22 2000 09:44:31:327AM1001121007Brian LabombardShot 7 - Ip =0.8, NL04 ~.6 ramping to 0.8 (from He puff), Bt=6.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
He puff on, C2D4 on.
ASP goes deep, some shorts on third scan

Next shot: go to NL04 ~ 1.2
Nov 22 2000 09:45:51:043AM1001121009Brian LabombardShot 9 - Ip =0.8, NL04 ~1 ramping to1.2 , Bt=6.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
He puff on, C2D4 on.

Next shot: go to NL04 ~ 0.6
Nov 22 2000 09:49:58:013AM1001121010Brian LabombardShot 10 - Ip =0.8, NL04 ~0.6 (He puff off) , Bt=6.0 tesla
ASP and FSP scanning at .7, .95, and 1.2 seconds
C2D4 on.
ASP goes deep, some shorting on third scan.
FSP plume on side camera during last scan is strange.

End of run

Physics Operator Comments
Nov 21 2000 02:04:30:577PMDmitri MossessianEngineering Setup for Tuesday, November 21

MP#267 SOL fluct LaBombard
PO Mossessian
SL LaBombard

Engineering setup:
-------------------

Run begins 13:00 (or as soon as we have the alternator) and ends at 18:00

Power System Setup: Same as on 1001109022

Gas setup - fill B-top with 6 psi of D2 Hybrid enabled
fill B-side lower with 1 psi of Ar Hybrid DISABLED
fill B-side upper with 35 psi of D2 Hybrid DISABLED, for ECDC
fill C-side with 30 psi of D2 Hybrid enabled
leave J-bottom as is Hybrid DISABLED

The following gate valves should be enabled, assuming no vacuum problems:
ECE, VUV, DNB, Beast

The following transmitters should be turned on 1, 2, and 4

Run Plan (LaBombard)
-------------------
Start with shot 1001116007
Ip = 0.8 MA, Bt = 4 tesla
Good equilibrium and FSP/ASP target is essential.

Take two shots at each condition to optimize scanning
probe insertion depths.

NL04 = 0.9, Ip = 0.8, Bt = 4
NL04 = 1.2, Ip = 0.8, Bt = 4

NL04 = 1.2, Ip = 0.8, Bt = 6
NL04 = 0.9, Ip = 0.8, Bt = 6
NL04 = 0.6, Ip = 0.8, Bt = 6

______________________________

Starting at 01:58 PM

Load shot 1001116007.
NL04 to 0.9e20

Coldstart OK
Nov 21 2000 02:33:08:530PM1001121001Dmitri MossessianPlasma. Hits the outer wall at 0.015 sec and barely survives.

For next shot: nl04 -> 1.2e20, RCUR up by 0.25 at 1.5 sec trying to keep
the right gap constant.
Nov 21 2000 02:46:39:763PM1001121002Dmitri MossessianPlasma. Bz dropped a little by itself helping the startup problem

For next shot: nl04 -> 0.9e20 again. No other changes
Nov 21 2000 03:17:27:327PM1001121003Dmitri MossessianPlasma. Startup as in shot 1.

For next shot: Drop Bz IC_EF4 1325 -> 1320. Bt to 6 T
Nov 21 2000 03:32:06:810PM1001121004Dmitri MossessianPlasma. Dropping Bz didn't help - still hitting outer wall at 0.017 sec

For next shot: Pulse_gas4 22 msec -> 24 msec (to slow current rise),
tweak right gap (RCUR down 1 mm) to keep it const, nl04 ->6e19
Nov 21 2000 03:53:42:343PM1001121005Dmitri MossessianFizzle. Late breakdown and Br dropped, lifting it too high.

For next shot: add 1 mT to Br offset, bring pulse_gas4 to 23 msec (just in case)
Nov 21 2000 04:35:48:373PM1001121006Dmitri MossessianFizzle. Somewhat earlier breakdown than in shot 5, but Br is too high and Bz
looks too low.
SPANNA crushed after this shot.
Started up PCS again and loaded shot 4, changing nl04 to 0.6e20.
Nov 21 2000 04:50:57:623PM1001121007Dmitri MossessianPlasma. Late breakdown (0.01) but nice smooth current rise.

For next shot: no startup changes. NL04 ->1.2e20. RCUR down by 1 mm.
Nov 21 2000 05:26:13:140PM1001121008Dmitri MossessianFizzle. Late breakdown. Steve thinks Bz too low.

For next shot: IC_EF4 up 1320 ->1335
Nov 21 2000 05:38:07:250PM1001121009Dmitri MossessianPlasma.

For next shot: nl04 -> 0.6e20
Nov 21 2000 06:06:41:483PM1001121010Dmitri MossessianPLasma.

Engineering Operator Comments
ShotTimeTypeStatusComment
102:09:06:873PMPlasmaOkAll Systems fired
202:36:37:997PMPlasmaOk
302:56:50:450PMPlasmaOk
403:19:42:327PMPlasmaOk
503:43:29:293PMPlasmaOk
604:16:20:840PMPlasmaOk
704:39:14:123PMPlasmaOk
805:07:21:670PMPlasmaOk
905:32:33:827PMPlasmaOk
1006:01:54:513PMPlasmaOk