Alcator C-Mod Run 1010611 Information

Back to runs

Miniproposals
Miniproposal:
Date Filed:
Title:
First Author:
Session Leader: Unknown (shots 1-3)

Operators
Session leader(s): Unknown
Physics operator(s):Jim Irby
Engineering operator(s): Unknown

Engineering Operator Run Comment
Test

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments

Physics Operator Comments
Jun 11 2001 01:05:28:170PM1010611001Jim IrbyWe are doing cycle tests of the data system and j-bottom
valve. We put approx 30 psi helium in the plenum. Put in
pulse width of 300 ms.

Peak pressure rise .20 mTorr


Jun 11 2001 01:17:34:470PM1010611002Jim IrbyIncreased pulse width to 350 ms, from -.650 to -.30 s

Peak pressure was 1.1 mTorr. Took about 350 ms to reach peak
pressure once pressure began to rise. Took about 80 ms to see
pressure rise start on G-side MKS gauge.

Jun 11 2001 01:39:23:503PM1010611003Jim IrbyRepeat of shot #2. Is j-bottom piezo reproducible?

Peak pressure 1.14 mTorr. Is is reproducible but
limited in flow rate.

Engineering Operator Comments
ShotTimeTypeStatusComment
110:55:35:843AMTestOkCycle Test
201:09:33:333PMTestOkCycle Test
301:19:49:210PMTestOkCYCLE AND J PORT GAS TEST