| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Unknown |
| Physics operator(s): | Jim Irby |
| Engineering operator(s): | Unknown |
| Engineering Operator Run Comment |
| Test |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments |
| Physics Operator Comments | |||
| Jun 11 2001 01:05:28:170PM | 1010611001 | Jim Irby | We are doing cycle tests of the data system and j-bottom valve. We put approx 30 psi helium in the plenum. Put in pulse width of 300 ms. Peak pressure rise .20 mTorr |
| Jun 11 2001 01:17:34:470PM | 1010611002 | Jim Irby | Increased pulse width to 350 ms, from -.650 to -.30 s Peak pressure was 1.1 mTorr. Took about 350 ms to reach peak pressure once pressure began to rise. Took about 80 ms to see pressure rise start on G-side MKS gauge. |
| Jun 11 2001 01:39:23:503PM | 1010611003 | Jim Irby | Repeat of shot #2. Is j-bottom piezo reproducible? Peak pressure 1.14 mTorr. Is is reproducible but limited in flow rate. |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 10:55:35:843AM | Test | Ok | Cycle Test |
| 2 | 01:09:33:333PM | Test | Ok | Cycle Test |
| 3 | 01:19:49:210PM | Test | Ok | CYCLE AND J PORT GAS TEST |