| Session Leader Summary for Run 1010801 (Wednesday): MP #291A -- ITB's with 70 MHz off-axis heating Session leader: J. Rice Physics operator: R. Granetz Engineer in charge: G. Dekow/W. Parkin/E. Fitzgerald This run day was extremely successful from the standpoint of accomplishing objectives of the mini-proposal and learning more about plasma conditions under which the density barrier and internal transport barrier (ITB) modes can be produced in C-Mod. The density barrier mode was produced with off-axis ICRF heating (70 MHz) on BOTH the tokamak high field side (HFS) at 3.9 T and the low field side (LFS) at 5.4 T. Preliminary attempts were also made at heating The LFS density barrier with on-axis ICRF power at 80 MHz. The density barrier mode was first produced at lower B_t = 3.9 T using 1.5 MW of off-axis ICRF heating power from the J-port antenna, driven at 70 MHz [see shots 1010801005 and 1010801011]. The central density was observed to rise to ne_TS(0) = 6 X 10^20 m^{-3} and the toroidal rotation velocity (v_tor) from HIREX decreased to zero and reversed direction (becoming counter-current. The central ion temperature (deduced from neutrons) increased slightly to 1.25 keV during the barrier formation. Interestingly, the value of B_t where the barrier formed at 70 MHz, scales nicely from the critical B_t for barrier formation at 80 MHz, that is: B_t = (70 MHz / 80 Mhz) * 4.5 T = 3.93 T. This places the minority hydrogen cyclotron resonance at about the same position on the HFS (12 cm) as it was at 4.5 T and 80 MHz. The toroidal field was varied around 3.9 T and this appears to be the threshold value of B_t for producing the ITB at 70 MHz. For example, at 4.0T, the density barrier would not form [see for example discharge 1010801013]. During the second phase of the run, B_t was increased up to 5.4 T and a density barrier mode was eventually produced on shot 1010801025. The J-port heating power used in this shot was only 1.35 MW because antenna arcing problems were experienced at higher J-port power levels as B_t was increased. ITB formation was again characterized by peaking density profile with ne_TS(0) = 6 X 10^20 m^{-3} and ne(0) / ne(ave) > 2. Formation of the density barrier at both 3.9T and 5.4T was preceeded by a transition to an H-mode phase. The 80 MHz power was also turned on for the final two plasmas of the day [shots 1010801026 and 1010801027] in an attempt to heat the LFS density barrier mode at 5.4 T. On shot 1010801026, there may be some evidence of heating within the barrier from the 80 MHz power (at the 0.5 MW level). The neutron rate more than tripled and the central density increase was arrested at ne_TS(0) = 3.5 X 10^20 m^{-3} during application of the on-axis ICRF power. These results are somewhat muddled however because there were two H->L back transitions at 0.81 sec and 0.91 sec, which prevented the initial barrier mode from becoming well - developed (i.e., peaked). Finally, shot 1010801027 is an excellent example of a P-mode produced by a pellet injection at about 1.3 sec. |
| Physics Operator Summaries |
| Entered: Jul 7 2004 04:37:14:567PM |
| Author: To Be Determined |
| Physics operator summary for run 1010801 (Wednesday): MP #291A -- ITB's with 70 MHz off-axis heating Session leader: J. Rice Physics operator: R. Granetz Engineer in charge: G. Dekow/W. Parkin/E. Fitzgerald Summary: The tokamak ran well, the J-antenna RF ran well (at 1.5 MW), and the DNB ran well. We did the B-field scan and got ITB's with the RF resonance on both the inboard and outboard sides (shots 5 and 25 respectively). See John's summary for the physics results. H/D remained low (4-5%) throughout the entire day. The one problem that cropped up a couple of times was a high resistance reading on the OH2U coax (2.5 micro-ohms). The joint temperature rise was not noticeably different than normal, so we continued operating, and the problem abated somewhat. Scorecard: 24 plasmas 3 fizzles 0 duds 0 tests 0 aborted and/or screwed up by computer problems ---------- 27 total ------------------------------------------------------------------------------- Engineering setup for Wednesday 01 August 2001 MP #291A -- ITB's with 70 MHz off-axis heating Session leader: J. Rice Physics operator: R. Granetz ECDC in D2 overnight, stopping by 8:00 am. Run begins at 09:00 and ends at 19:00. Power systems the same as for shot 1010730012. Gas setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid enabled (PG1) fill B-side upper with 10 psi D2 Hybrid DISABLED (PG2) (for ECDC) fill C-side with 30 psi D2 Hybrid enabled (PG3) fill J-Bottom with 30 psi He Hybrid DISABLED (PG5) Enable the following gate valves, assuming no vacuum problems: ECE, DNB, VUV ------------------------------------------------------------------------------- RF Setup: Transmitters 1 and 2 in run-on started at 08:00. Transmitters 3 and 4 in run-on started at 08:00. RF Waveforms: 2+ MW from J only, flattop from t=0.6 to 1.4 s. If J is having problems, switch to D and E. ------------------------------------------------------------------------------- Run Plan: MP 291A originally called for 80 MHz operation of D, E, and J at nearly full power, and toroidal field operation up to 6.0 tesla. Since J is now at 70 MHz, this run will concentrate instead on getting ITB's with J only, with toroidal fields starting at 4.5 T, dropping down by 0.2 T each shot to 3.5 T, then back up to 5.5 T. Primary goal is to get an ITB with 70 MHz ICRF resonance on the high-field side. If successful, then try for an ITB with 70 MHz ICRF resonance on the low-field side. We will also put in a helium puff for DNB CXRS. ------------------------------------------------------------------------------- Overnight ECDC in D2 was done. Hybrid coldstart done; no errors found Loaded PCS segment 1 from shot 1010731017, segment 2 from 1010730012. Added 100 ms helium puff from J-bottom starting at t=0.2 s. The valve is disabled for the beginning of the run. ------------------------------------------------------------------------------- Shot 01 -- Plasma. Disrupted at t=0.67 s. Killed by injection from the top of J-antenna, similar to yesterday. Pre-fill was too low because it was adjusted assuming DNB would be on, which is wasn't. H/D=3%. Prf=2.0 MW from J. Next shot: turn on DNB; increase pre-fill by 1 ms also. Enable helium puff from J-bottom valve. Shot 02 -- Plasma. Good shot. No ITB, as expected. J-bottom puffed, but CXRS didn't see any helium signals. H/D=5-6% Prf=1.4 MW (J). DNB fired at t=0.4 s. Next shot: reduce Btor by 0.2 T to 4.3 T (118 kA). Increase helium puff to 200 ms, and add a negative 30 volt bias to keep it from chattering when off. ECDC in D2 is on between shots now. Shot 03 -- Plasma. Good shot. Btor=4.3 T. Prf=1.5 MW (J). H/D=5%. DNB fired. Bill Rowan saw helium signals from top periscope. Next shot: reduce Btor by 0.2 T to 4.1 T (113 kA). Move helium puff earlier by 100 ms (now goes from t=0.1 to 0.3 s). Jim Terry will adjust Chromex to span the He 4686 region. ECDC in D2 is on between shots now. Shot 04 -- Plasma. Good shot. Btor=4.12 T. No ITB, as expected. DNB fired. Prf=1.5 MW (J). H/D=5%. Chromex sees He 4686 during first part of shot. Next shot: reduce Btor by 0.2 T to 3.9 T (107 kA). Reduce helium puff to 150 ms, still starting at t=0.1 s. ECDC in D2 is on between shots now. Shot 05 -- Plasma. Disrupted at t=1.5 s after an injection. This one might have had an ITB, which would not be unexpected. Btor=3.91 T. Prf=1.45 MW (J). H/D= %. DNB fired. Next shot: reduce Btor by 0.2 T to 3.7 T (101 kA). DNB will move to later in the shot (t=0.9 s), so I will add 1 ms to the pre-fill puff. ECDC in D2 is on between shots now. Shot 06 -- Fizzle. Pre-fill pressure was a little low (0.05 mTorr). Next shot: increase pre-fill puff by another 2 ms. Also enable the LPI gate valve. Shot 07 -- Plasma. Disrupted at t=1.45 s. Multiple H-L transitions. Lithium pellet injected at t=1.41 s. Btor=3.71 T. Startup still needs improvement. Pre-fill pressure is still low. H/D=5% Prf=1.5 MW (J). OH2U coax resistance warning came up; 2.5 micro-ohms. Jim Irby is studying it. Next shot: raise Btor by 0.1 T to 3.8 T (104 kA). Also increase pre-fill puff another 2 ms. ECDC in D2 is on between shots now. The OH2U coax resistance is real. The joint temperature rise doesn't seem abnormal though. We'll shorten the fizzle detector delays and continue with plasma operation. Shot 08 -- Fizzle. Pre-fill pressure is 0.06 mTorr, which should be fine. OH2U coax resistance dropped to 0.9 micro-ohms. Next shot: increase pre-fill puff another 2 ms (to 24 ms). Shot 09 -- Plasma. Good shot. Multiple H-L transitions. Btor=3.81 T. Prf=1.5 MW (J). Startup was still shaky. DNB fired at t=0.9 s. We got another OH coax resistance warning. Next shot: increase Btor by 0.1 T to 3.9 T. ECDC in D2 is on between shots now. Shot 10 -- Plasma. Disrupted at t=0.56 s, before the RF came on. Good startup on this one. Btor=3.91 T. Coax resistances were somewhat lower on this shot. Next shot: no changes. ECDC in D2 is on between shots now. Shot 11 -- Plasma. Good shot. Disrupted at t=1.44 s. Btor=3.91 T. Prf=1.5 MW (J). No DNB. H/D=5%. Got an ITB. Next shot: no changes; fire lithium pellet into ITB. ECDC in D2 is on between shots now. Shot 12 -- Plasma. Killed by lithium pellet at t=1.33 s. Prf=1.5 MW (J). DNB fired at t=0.9 s. Chromex bin 7 sees a doubling of signal during the beam. H/D=5%. Next shot: increase Btor by 0.1 T to 4.0 T. ECDC in D2 is on between shots now. Shot 13 -- Plasma. Good shot. Btor=4.0 T. Prf=1.5 MW (J). DNB fired. H/D=5-6%. Next shot: raise Btor to 4.7 T (130.5 kA) ECDC in D2 is on between shots now. Shot 14 -- Plasma. Good shot. Btor=4.71 T. Prf=1.44 MW (J). DNB fired. H/D=5%. Next shot: raise Btor to 4.9 T (136.5 kA) ECDC in D2 is on between shots now. Shot 15 -- Plasma. Good shot. Btor=4.9 T. Prf=1.46 MW (J). H/D=5%. DNB fired. Next shot: raise Btor to 5.1 T (142.5 kA) ECDC in D2 is on between shots now. Shot 16 -- Plasma. Good shot. Btor=5.1 T. Prf=1.5 MW (J). No ITB. DNB fired. Next shot: raise Btor to 5.3 T (148.5 kA). Reduce helium puff to 75 ms. ECDC in D2 is on between shots now. Shot 17 -- Plasma. Good shot. Btor=5.3 T. Prf=1.45 MW (J). DNB fired. H/D=4%. Next shot: raise Btor by 0.1 T to 5.4 T (151500 kA). Set helium puff to 150 ms, starting at t=0.70 s. DNB will fire at t=1.0 s. ECDC in D2 is on between shots now. Shot 18 -- Plasma. Disrupted at t=1.21 s. Btor=5.4 T. DNB fired at t=1.0 s. Helium puffed at t=0.7 s. H/D=4%. Next shot: move helium puff back to t=0.10-0.25 s. (DNB will move back to t=0.9 s) ECDC in D2 is on between shots now. Shot 19 -- Plasma. Good shot. Btor=5.4 T. Prf=1.16 MW (J). DNB fired at t=0.9 s. Helium puffed at t=0.1 s. H/D=4% Next shot: Prf will be raised back up to 1.5 MW. ECDC in D2 is on between shots now. Shot 20 -- Plasma. Disrupted at t=1.29 s. Btor=5.4 T. Prf=1.34 MW (J). DNB fired at t=0.9 s. Next shot: no changes. ECDC in D2 is on between shots now. Shot 21 -- Plasma. Good shot. Btor=5.4 T. Prf=1.33 MW (J). DNB fired. Two EN modes. Next shot: increase Btor by 0.1 T to 5.5 T. ECDC in D2 is on between shots now. Shot 22 -- Plasma. Good shot. Btor=5.5 T. Prf=1.35 MW (J). DNB fired. Almost completely L-mode. H/D=3.5% Next shot: reduce Btor by 0.1 T to 5.4 T. Reduce target density to nl_04=1.0e20 m-2 (was 1.1). ECDC in D2 is on between shots now. Shot 23 -- Fizzle. Nothing obviously wrong. Next shot: repeat with no changes. Shot 24 -- Plasma. Good shot. Btor=5.4 T. Prf=1.33 MW (J). DNB fired. Next shot: add 1 ms to pre-fill. ECDC in D2 is on between shots now. Shot 25 -- Plasma. Good shot. Very clear ITB. Btor=5.4 T. Prf=1.35 MW (J). DNB fired at t=0.9 s. H/D=4-5%. Target nl_04=1.0e20 m-2. Next shot: repeat with no changes (John's HIREX had a high-voltage trip). ECDC in D2 is on between shots now. Shot 26 -- Plasma. Good shot. Btor=5.4 T. Prf=1.4 MW (J) + a little from D and E after t=1.0 s. No ITB. DNB fired. H/D=4-5%. Next shot: repeat with no changes. ECDC in D2 is on between shots now. The LOGBOOK database server has stopped working. Don Nelson and Josh Stillerman are looking into it from home, but we'll go ahead and try for another shot anyway. SQL database server began working again after Don rebooted node RED. Shot 27 -- Plasma. Good shot. Btor=5.4 T. No ITB. Li pellet at t=1.3 s. Prf=1.37 MW (J) + some from D and E after t=1.1 s. DNB fired. H/D=5%. End of run. |
| Session Leader Comments | |||
| Aug 1 2001 09:30:05:957AM | 1010801001 | John Rice | disrupted early 2.0 MW from J too much |
| Aug 1 2001 09:30:38:643AM | 1010801002 | John Rice | 4.5 T, steady rotation, no ITB 1.5 MW from J |
| Aug 1 2001 09:48:05:130AM | 1010801003 | John Rice | 4.3 T, steady rotation, no ITB 1.5 MW from J |
| Aug 1 2001 10:07:42:723AM | 1010801004 | John Rice | 4.1 T, steady rotation, no ITB 1.5 MW from J |
| Aug 1 2001 10:34:15:537AM | 1010801004 | John Rice | 3.9 T, rotation drops with ITB formation 1.5 MW from J |
| Aug 1 2001 11:07:42:427AM | 1010801005 | John Rice | 3.9 T, rotation drops with ITB formation 1.5 MW from J |
| Aug 1 2001 11:08:16:673AM | 1010801007 | John Rice | 3.7 T, rotation drops with ITB formation, H-L transitions 1.5 MW from J |
| Aug 1 2001 12:04:36:630PM | 1010801009 | John Rice | 3.8 T, rotation drops with ITB formation, H-L transitions 1.5 MW from J |
| Aug 1 2001 12:50:13:237PM | 1010801009 | John Rice | 3.9 T, disrupted before RF |
| Aug 1 2001 12:49:25:660PM | 1010801011 | John Rice | 3.9 T, rotation drops with ITB formation 1.5 MW from J |
| Aug 1 2001 01:07:32:190PM | 1010801012 | John Rice | 3.9 T, H-L transition 1.5 MW J port |
| Aug 1 2001 01:28:33:393PM | 1010801013 | John Rice | 4.0 T, steady rotation, no ITB 1.5 MW J port |
| Aug 1 2001 01:57:18:003PM | 1010801014 | John Rice | 4.7 T, steady rotation, no ITB 1.5 MW J port |
| Aug 1 2001 02:19:02:713PM | 1010801015 | John Rice | 4.9 T, steady rotation, no ITB 1.5 MW J port |
| Aug 1 2001 02:44:11:170PM | 1010801016 | John Rice | 5.1 T, steady rotation, no ITB, some trips 1.5 MW J port |
| Aug 1 2001 03:13:40:803PM | 1010801017 | John Rice | 5.3 T, several RF trips, ambiguous regarding ITB formation 1.5 MW J port |
| Aug 1 2001 03:40:59:403PM | 1010801018 | John Rice | 5.4 T, several RF trips 1.5 MW J port |
| Aug 1 2001 04:03:21:367PM | 1010801019 | John Rice | 5.4 T, late H-mode due to lower power, one RF trip 1.2 MW J port |
| Aug 1 2001 04:24:55:973PM | 1010801020 | John Rice | 5.4 T, one RF trip, rotation drop and ITB formation 1.4 MW J port |
| Aug 1 2001 04:55:12:467PM | 1010801021 | John Rice | 5.4 T, one RF trip, rotation drop and ITB formation 1.4 MW J port |
| Aug 1 2001 05:15:08:927PM | 1010801022 | John Rice | 5.5 T, no H-mode 1.4 MW J port |
| Aug 1 2001 05:54:17:393PM | 1010801024 | John Rice | 5.4 T, rotation slows and 'possible' ITB formation 1.3 MW J port |
| Aug 1 2001 06:12:25:503PM | 1010801025 | John Rice | 5.4 T, 'oh yeah' ITB formation 1.4 MW J port |
| Aug 1 2001 07:01:29:940PM | 1010801027 | John Rice | 5.4 T, rotation slowing, ITB formation, density peaking 1.4 MW J port plus D and E ramp, stabilizing barrier |
| Physics Operator Comments | |||
| Jul 31 2001 02:42:58:280PM | Robert Granetz | Engineering setup for Wednesday 01 August 2001 MP #291A -- ITB's with 70 MHz off-axis heating Session leader: J. Rice Physics operator: R. Granetz ECDC in D2 overnight, stopping by 8:00 am. Run begins at 09:00 and ends at 19:00. Power systems the same as for shot 1010730012. Gas setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid enabled (PG1) fill B-side upper with 10 psi D2 Hybrid DISABLED (PG2) (for ECDC) fill C-side with 30 psi D2 Hybrid enabled (PG3) fill J-Bottom with 30 psi He Hybrid DISABLED (PG5) Enable the following gate valves, assuming no vacuum problems: ECE, DNB, VUV ------------------------------------------------------------------------------- RF Setup: Transmitters 1 and 2 in run-on started at 08:00. Transmitters 3 and 4 in run-on started at 08:00. RF Waveforms: 2+ MW from J only, flattop from t=0.6 to 1.4 s. If J is having problems, switch to D and E. | |
| Jul 31 2001 02:43:08:110PM | Robert Granetz | Run Plan: MP 291A originally called for 80 MHz operation of D, E, and J at nearly full power, and toroidal field operation up to 6.0 tesla. Since J is now at 70 MHz, this run will concentrate instead on getting ITB's with J only, with toroidal fields starting at 4.5 T, dropping down by 0.2 T each shot to 3.5 T, then back up to 5.5 T. Primary goal is to get an ITB with 70 MHz ICRF resonance on the high-field side. If successful, then try for an ITB with 70 MHz ICRF resonance on the low-field side. We will also put in a helium puff for DNB CXRS. | |
| Aug 1 2001 08:50:40:050AM | Robert Granetz | Overnight ECDC in D2 was done. Hybrid coldstart done; no errors found Loaded PCS segment 1 from shot 1010731017, segment 2 from 1010730012. Added 100 ms helium puff from J-bottom starting at t=0.2 s. The valve is disabled for the beginning of the run. | |
| Aug 1 2001 09:18:55:363AM | 1010801001 | Robert Granetz | Shot 01 -- Plasma. Disrupted at t=0.67 s. Killed by injection from the top of J-antenna, similar to yesterday. Pre-fill was too low because it was adjusted assuming DNB would be on, which is wasn't. H/D=3%. Prf=2.0 MW from J. Next shot: turn on DNB; increase pre-fill by 1 ms also. Enable helium puff from J-bottom valve. |
| Aug 1 2001 09:58:55:160AM | 1010801002 | Robert Granetz | Shot 02 -- Plasma. Good shot. No ITB, as expected. J-bottom puffed, but CXRS didn't see any helium signals. H/D=5-6% Prf=1.4 MW (J). DNB fired at t=0.4 s. Next shot: reduce Btor by 0.2 T to 4.3 T (118 kA). Increase helium puff to 200 ms, and add a negative 30 volt bias to keep it from chattering when off. ECDC in D2 is on between shots now. |
| Aug 1 2001 09:58:31:597AM | 1010801003 | Robert Granetz | Shot 03 -- Plasma. Good shot. Btor=4.3 T. Prf=1.5 MW (J). H/D=5%. DNB fired. Bill Rowan saw helium signals from top periscope. Next shot: reduce Btor by 0.2 T to 4.1 T (113 kA). Move helium puff earlier by 100 ms (now goes from t=0.1 to 0.3 s). Jim Terry will adjust Chromex to span the He 4686 region. ECDC in D2 is on between shots now. |
| Aug 1 2001 10:19:46:283AM | 1010801004 | Robert Granetz | Shot 04 -- Plasma. Good shot. Btor=4.12 T. No ITB, as expected. DNB fired. Prf=1.5 MW (J). H/D=5%. Chromex sees He 4686 during first part of shot. Next shot: reduce Btor by 0.2 T to 3.9 T (107 kA). Reduce helium puff to 150 ms, still starting at t=0.1 s. ECDC in D2 is on between shots now. |
| Aug 1 2001 10:36:34:410AM | 1010801005 | Robert Granetz | Shot 05 -- Plasma. Disrupted at t=1.5 s after an injection. This one might have had an ITB, which would not be unexpected. Btor=3.91 T. Prf=1.45 MW (J). H/D= %. DNB fired. Next shot: reduce Btor by 0.2 T to 3.7 T (101 kA). DNB will move to later in the shot (t=0.9 s), so I will add 1 ms to the pre-fill puff. ECDC in D2 is on between shots now. |
| Aug 1 2001 11:00:56:923AM | 1010801006 | Robert Granetz | Shot 06 -- Fizzle. Pre-fill pressure was a little low (0.05 mTorr). Next shot: increase pre-fill puff by another 2 ms. Also enable the LPI gate valve. |
| Aug 1 2001 11:18:25:300AM | 1010801007 | Robert Granetz | Shot 07 -- Plasma. Disrupted at t=1.45 s. Multiple H-L transitions. Lithium pellet injected at t=1.41 s. Btor=3.71 T. Startup still needs improvement. Pre-fill pressure is still low. H/D=5% Prf=1.5 MW (J). OH2U coax resistance warning came up; 2.5 micro-ohms. Jim Irby is studying it. Next shot: raise Btor by 0.1 T to 3.8 T (104 kA). Also increase pre-fill puff another 2 ms. ECDC in D2 is on between shots now. |
| Aug 1 2001 11:40:02:067AM | 1010801007 | Robert Granetz | The OH2U coax resistance is real. The joint temperature rise doesn't seem abnormal though. We'll shorten the fizzle detector delays and continue with plasma operation. |
| Aug 1 2001 11:49:50:380AM | 1010801008 | Robert Granetz | Shot 08 -- Fizzle. Pre-fill pressure is 0.06 mTorr, which should be fine. OH2U coax resistance dropped to 0.9 micro-ohms. Next shot: increase pre-fill puff another 2 ms (to 24 ms). |
| Aug 1 2001 12:28:37:270PM | 1010801009 | Robert Granetz | Shot 09 -- Plasma. Good shot. Multiple H-L transitions. Btor=3.81 T. Prf=1.5 MW (J). Startup was still shaky. DNB fired at t=0.9 s. We got another OH coax resistance warning. Next shot: increase Btor by 0.1 T to 3.9 T. ECDC in D2 is on between shots now. |
| Aug 1 2001 12:29:27:690PM | 1010801010 | Robert Granetz | Shot 10 -- Plasma. Disrupted at t=0.56 s, before the RF came on. Good startup on this one. Btor=3.91 T. Coax resistances were somewhat lower on this shot. Next shot: no changes. ECDC in D2 is on between shots now. |
| Aug 1 2001 12:49:07:380PM | 1010801011 | Robert Granetz | Shot 11 -- Plasma. Good shot. Disrupted at t=1.44 s. Btor=3.91 T. Prf=1.5 MW (J). No DNB. H/D=5%. Got an ITB. Next shot: no changes; fire lithium pellet into ITB. ECDC in D2 is on between shots now. |
| Aug 1 2001 01:16:36:083PM | 1010801012 | Robert Granetz | Shot 12 -- Plasma. Killed by lithium pellet at t=1.33 s. Prf=1.5 MW (J). DNB fired at t=0.9 s. Chromex bin 7 sees a doubling of signal during the beam. H/D=5%. Next shot: increase Btor by 0.1 T to 4.0 T. ECDC in D2 is on between shots now. |
| Aug 1 2001 02:22:47:597PM | 1010801013 | Robert Granetz | Shot 13 -- Plasma. Good shot. Btor=4.0 T. Prf=1.5 MW (J). DNB fired. H/D=5-6%. Next shot: raise Btor to 4.7 T (130.5 kA) ECDC in D2 is on between shots now. |
| Aug 1 2001 02:22:57:970PM | 1010801014 | Robert Granetz | Shot 14 -- Plasma. Good shot. Btor=4.71 T. Prf=1.44 MW (J). DNB fired. H/D=5%. Next shot: raise Btor to 4.9 T (136.5 kA) ECDC in D2 is on between shots now. |
| Aug 1 2001 03:05:28:113PM | 1010801016 | Robert Granetz | Shot 16 -- Plasma. Good shot. Btor=5.1 T. Prf=1.5 MW (J). No ITB. DNB fired. Next shot: raise Btor to 5.3 T (148.5 kA) Reduce helium puff to 75 ms. ECDC in D2 is on between shots now. |
| Aug 1 2001 03:16:07:137PM | 1010801017 | Robert Granetz | Shot 17 -- Plasma. Good shot. Btor=5.3 T. Prf=1.45 MW (J). DNB fired. H/D=4%. Next shot: raise Btor by 0.1 T to 5.4 T (151500 kA). Set helium puff to 150 ms, starting at t=0.70 s. DNB will fire at t=1.0 s. ECDC in D2 is on between shots now. |
| Aug 1 2001 03:44:56:630PM | 1010801018 | Robert Granetz | Shot 18 -- Plasma. Disrupted at t=1.21 s. Btor=5.4 T. DNB fired at t=1.0 s. Helium puffed at t=0.7 s. H/D=4%. Next shot: move helium puff back to t=0.10-0.25 s. (DNB will move back to t=0.9 s) ECDC in D2 is on between shots now. |
| Aug 1 2001 04:27:17:413PM | 1010801020 | Robert Granetz | Shot 20 -- Plasma. Disrupted at t=1.29 s. Btor=5.4 T. Prf=1.34 MW (J). DNB fired at t=0.9 s. Next shot: no changes ECDC in D2 is on between shots now. |
| Aug 1 2001 04:54:29:980PM | 1010801021 | Robert Granetz | Shot 21 -- Plasma. Good shot. Btor=5.4 T. Prf=1.33 MW (J). DNB fired. Two EN modes. Next shot: increase Btor by 0.1 T to 5.5 T. ECDC in D2 is on between shots now. |
| Aug 1 2001 05:19:12:827PM | 1010801022 | Robert Granetz | Shot 22 -- Plasma. Good shot. Btor=5.5 T. Prf=1.35 MW (J). DNB fired. Almost completely L-mode. H/D=3.5% Next shot: reduce Btor by 0.1 T to 5.4 T. Reduce target density to nl_04=1.0e20 m-2 (was 1.1). ECDC in D2 is on between shots now. |
| Aug 1 2001 05:38:56:957PM | 1010801023 | Robert Granetz | Shot 23 -- Fizzle. Nothing obviously wrong. Next shot: repeat with no changes. |
| Aug 1 2001 05:51:41:403PM | 1010801024 | Robert Granetz | Shot 24 -- Plasma. Good shot. Btor=5.4 T. Prf=1.33 MW (J). DNB fired. Next shot: add 1 ms to pre-fill. ECDC in D2 is on between shots now. |
| Aug 1 2001 06:20:02:457PM | 1010801025 | Robert Granetz | Shot 25 -- Plasma. Good shot. Very clear ITB. Btor=5.4 T. Prf=1.35 MW (J). DNB fired at t=0.9 s. H/D=4-5%. Target nl_04=1.0e20 m-2. Next shot: repeat with no changes (John's HIREX had a high-voltage trip). ECDC in D2 is on between shots now. |
| Aug 1 2001 07:02:00:473PM | 1010801026 | Robert Granetz | Shot 26 -- Plasma. Good shot. Btor=5.4 T. Prf=1.4 MW (J) + a little from D and E after t=1.0 s. No ITB. DNB fired. H/D=4-5%. Next shot: repeat with no changes. ECDC in D2 is on between shots now. |
| Aug 1 2001 07:02:19:503PM | 1010801026 | Robert Granetz | The LOGBOOK database server has stopped working. Don Nelson and Josh Stillerman are looking into it from home, but we'll go ahead and try for another shot anyway. |
| Aug 1 2001 07:10:48:880PM | 1010801027 | Robert Granetz | SQL database server began working again after Don rebooted node RED. |
| Aug 1 2001 07:12:00:180PM | 1010801027 | Robert Granetz | Shot 27 -- Plasma. Good shot. Btor=5.4 T. No ITB. Li pellet at t=1.3 s. Prf=1.37 MW (J) + some from D and E after t=1.1 s. DNB fired. H/D=5%. End of run. |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 09:01:43:473AM | Plasma | Ok | |
| 2 | 09:21:19:753AM | Plasma | Ok | |
| 3 | 09:40:24:970AM | Plasma | Ok | |
| 4 | 10:01:30:130AM | Plasma | Ok | |
| 5 | 10:24:46:740AM | Plasma | Ok | |
| 6 | 10:48:02:957AM | Plasma | Ok | |
| 7 | 11:02:45:597AM | Plasma | Ok | |
| 8 | 11:40:25:253AM | Plasma | Ok | |
| 9 | 11:55:26:707AM | Plasma | Ok | |
| 10 | 12:17:18:643PM | Plasma | Ok | |
| 11 | 12:39:05:880PM | Plasma | Ok | |
| 12 | 01:01:02:237PM | Plasma | Ok | |
| 13 | 01:24:25:287PM | Plasma | Ok | |
| 14 | 01:49:06:037PM | Plasma | Ok | |
| 15 | 02:14:21:267PM | Plasma | Ok | |
| 16 | 02:38:19:220PM | Plasma | Ok | |
| 17 | 03:02:20:110PM | Plasma | Ok | |
| 18 | 03:27:05:453PM | Plasma | Ok | |
| 19 | 03:52:31:127PM | Plasma | Ok | |
| 20 | 04:16:26:800PM | Plasma | Ok | |
| 21 | 04:38:22:980PM | Plasma | Ok | |
| 22 | 05:02:56:467PM | Plasma | Ok | |
| 23 | 05:27:36:700PM | Plasma | Ok | |
| 24 | 05:42:06:353PM | Plasma | Ok | |
| 25 | 06:06:16:980PM | Plasma | Ok | |
| 27 | 07:06:05:527PM | Test | Bad | |