| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Unknown |
| Physics operator(s): | Ian Hutchinson |
| Engineering operator(s): | Gary Dekow,Bill Cochran |
| Engineering Operator Run Comment |
| Power Tests EO:Cochran/Dekow PO:Hutchinson |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments |
| Physics Operator Comments | |||
| May 31 2002 08:39:36:330AM | Ian Hutchinson | Power Tests after machine reassembly. PO Hutch EO Cochrane Vessel at 35 deg C. Pressure 3.2e-6, not baked yet. Coils EFs are at -125. Cylinder -45 | |
| May 31 2002 11:12:02:863AM | 1020531001 | Ian Hutchinson | No data. Something broken in the system. |
| May 31 2002 01:26:41:053PM | 1020531005 | Ian Hutchinson | Finally after many tries and struggles with data system etc got current in EF2 under PLC control, and some coupling to ef3 and ef4. mflux shows a plausible looking flux shape. |
| May 31 2002 02:01:49:107PM | 1020531006 | Ian Hutchinson | EF2 Lower on PLC control. Looks good. |
| May 31 2002 02:02:07:903PM | 1020531008 | Ian Hutchinson | Chopper test. OK |
| May 31 2002 02:03:17:563PM | 1020531009 | Ian Hutchinson | Higher current chopper test. The radial field (Br(mflux)) is positive for these cases which have positive current in the efc_l rogowski. This is correct polarity so the coils are hooked up correctly. |
| May 31 2002 02:54:16:110PM | 1020531011 | Ian Hutchinson | EF3 test positive current looks ok. |
| May 31 2002 02:58:59:210PM | 1020531012 | Ian Hutchinson | EF4 test negative 2kA. Granetz replaces bp26_gh with bp26_bc in hybrid input 55. |
| May 31 2002 03:09:14:510PM | 1020531012 | Ian Hutchinson | Called the Rcur controller. Initially when I tried to edit it, it said I could not because bp26 was wrong. Then after calling it had bp26_bc and could be displayed through edit. Then hit the algs button in segment 1. It seemed to call all the algorithms. There were a few where the scale factor did not satisfy the criterion for all the values, but I ignored that and just hit ok. Load. Call the algorithms for segments 2-4. All ok except for the NL04 factor which I just oked anyway. Load/clean. |
| May 31 2002 03:35:05:297PM | 1020531013 | Ian Hutchinson | EF4 1kA positive current. Now load wire of segment 1 wire 15 from 1000816027 the double swing EF4 |
| May 31 2002 04:05:24:180PM | 1020531014 | Ian Hutchinson | Double swung EF4 looks ok. Asked for -1200 to +1000 but got -1000 to +800. |
| May 31 2002 04:06:11:590PM | 1020531015 | Ian Hutchinson | EF1_u -2000A PLC control ok. |
| May 31 2002 04:19:13:360PM | 1020531016 | Ian Hutchinson | EF!_u +2000A |
| May 31 2002 04:19:32:407PM | 1020531017 | Ian Hutchinson | Operator error. Not enabled. |
| May 31 2002 04:30:17:407PM | 1020531018 | Ian Hutchinson | EF1_l -2000A PLC controlled. |
| May 31 2002 04:48:00:467PM | 1020531019 | Ian Hutchinson | EF1 +2000A. |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 3 | 12:26:52:447PM | Test | Bad | Camac and plc problems |
| 4 | 12:48:58:137PM | Test | Ok | Camac Test Shot |
| 5 | 01:03:46:940PM | Test | Ok | ef2U Test only |
| 6 | 01:24:21:863PM | Test | Ok | |
| 7 | 01:38:03:510PM | Test | Ok | EF2L Test |
| 8 | 01:48:07:430PM | Test | Ok | efc chopper test 400V |
| 9 | 01:59:10:133PM | Test | Ok | efc chopper test 600V |
| 10 | 02:07:52:790PM | Test | Ok | efc chopper test 800v |
| 11 | 02:37:50:850PM | Test | Ok | ef3 test |
| 12 | 02:50:53:120PM | Test | Ok | ef4 forward test |
| 13 | 03:19:58:900PM | Test | Ok | ef4 reverse test |
| 14 | 03:33:16:700PM | Test | Ok | ef4 double swing test |
| 15 | 03:57:17:427PM | Test | Ok | ef1u test |
| 16 | 04:06:12:450PM | Test | Ok | ef1u reverse test |
| 17 | 04:14:46:667PM | Test | Bad | ef1l forward, PS not enabled |
| 18 | 04:22:45:397PM | Test | Ok | ef1L forward test |
| 19 | 04:31:14:737PM | Test | Ok | ef1L reverse test |
| 20 | 04:42:22:440PM | Test | Ok | EF1U and L Commutation Test |