| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Unknown |
| Physics operator(s): | Jim Irby |
| Engineering operator(s): | Gary Dekow |
| Engineering Operator Run Comment |
| Shot Cycle Tests PO: Irby EO:Dekow |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Physics Operator Summaries |
| Entered: Jul 7 2004 04:37:14:833PM |
| Author: To Be Determined |
| PO/Irby EO/Dekow We ran through the shot cycle today and checked the following: . gas puff from b-top (startup), and c-side operating . Most of the ionization and MKS gauges are working. G-Side ratio still needs work. . sparker is working . the new feature that allows us to close the Torvac gatevalves at PULSE and open two minutes later is working. We puffed the torus up to 8 or 9 mTorr and Brian checked that the final pressure was consistent with our measurements of fueling rates. Had a problem with server 2. It was fixed by checking over the wiring and not actually fixing anything. Will probably see this problem again. |
| Session Leader Comments |
| Physics Operator Comments | |||
| Jun 5 2002 02:06:25:667PM | Jim Irby | Today's run will be a set of cycle tests taken to test . gas puff system . TF tap camac electronics using 4kA PEI pulse . OH coax electronics . New TF scanner . pressure gauges . DNB timing/cycle . Between shot ecdc | |
| Jun 5 2002 03:21:35:670PM | 1020605001 | Jim Irby | Got some gas in the machine. G-Side MKS is working. Sparker turn on for next shot |
| Jun 5 2002 03:41:41:170PM | 1020605002 | Jim Irby | G_Side_rat, b_bottom_mks, e_top_mks, e_bottom_mks Torvac IGP1 working. |
| Jun 5 2002 04:09:56:970PM | 1020605003 | Jim Irby | Sparker is working |
| Jun 5 2002 04:52:57:237PM | 1020605006 | Jim Irby | made some changes trying to get c-side running --- load/clean enabled Torvac gatevalve closure on PULSE: It worked --- pressure to 9 mTorr --- gatevalves opened after two minutes Looks like C-Side gas puff is working |
| Jun 5 2002 05:23:43:143PM | 1020605010 | Jim Irby | Reduced c-side gas puff Had CAMAC problems.... |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 03:01:59:673PM | Test | Ok | Cycle Test |
| 2 | 03:22:46:580PM | Test | Ok | cycle test |
| 3 | 03:40:27:997PM | Test | Ok | Cycle test |
| 4 | 03:52:02:297PM | Test | Ok | cycle test |
| 5 | 04:02:52:753PM | Test | Ok | |
| 6 | 04:14:21:570PM | Test | Ok | |
| 7 | 04:26:45:227PM | Test | Ok | |
| 8 | 04:39:48:793PM | Test | Ok | |
| 9 | 04:54:01:207PM | Test | Ok | |
| 10 | 05:04:53:100PM | Test | Ok | |
| 11 | 05:31:17:610PM | Test | Ok | |