| Session leader(s): | Jim Irby |
| Physics operator(s): | Bill Rowan |
| Engineering operator(s): | Gary Dekow,Bill Cochran |
| Engineering Operator Run Comment |
| Plasma Startup (298a); SL:Irby; PO:Rowan,EO: Cochran/Dekow |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Entered: Jul 7 2004 03:49:28:790PM |
| Author: To Be Determined |
| Run Summary for Run 1020607 Plasma Startup (298a) SL:Irby PO:Rowan EO: Cochran/Dekow Overnight ECDC in D2 at 2e-4 Torr stopped at 07:00 Startup was from 1010801015; an 800 kA shot Results: Our first fizzle since August 2001 was obtained on shot 2 today. Tweaks of Br0 and Bz0 continued until shot 16 when a 530 kA, 122 ms, discharge was produced following final tweaks in gas and Bz0. Shot 15 was probably terminated early by too much gas. The CII signal was relatively low for this early in the campaign. ECDC was run between many shots and may have helped somewhat to keep the fizzle rate up. Wall conditioning will continue all next week. A great deal of the run day was lost because of a CAMAC problem on server 2. The problem was eventually traced to a broken fiber from the Magnetics rack. An oscillation in EF2L, that made it difficult to control Br0, was fixed late in the run while the broken fiber was being tracked down. Boards and plugs were reseated, and several suspect ICs were replaced. |
| Physics Operator Summaries |
| Entered: Jul 7 2004 04:37:14:833PM |
| Author: To Be Determined |
| Physop Summary for 1020607 SL:Irby PO:Rowan EO: Cochran/Dekow ENGINEERING SETUP FOR 1020607 Overnight ECDC in D2 at 2e-4 Torr, stopping at 07:00 Power systems the same as for shot 1010801015 c-side and b-top gas should be as on run 1020606 RUN PLAN First attempt at obtaining plasmas following an extended down time. Overnight ECDC in D2 at 2e-4 Torr, stopping at 07:00 Startup from 1010801015; an 800 kA shot We will want between shot ecdc in D2 We should try to have the following diagnostics if at all possible: . TCI . Video view from A-Hor (or new F-Hor if possible) . G-side ratiomatic . single chord VB . CII, or H-alpha, or some othe photon... RUN SUMMARY One plasma (disruption at 120 ms) was made during this run, 016. The remainder of the shots were fizzles and duds. Prior to the first shot, the density demand was set to 0 since a feedback signal was not expected. Specifically, NL_04 was set to 0 in segment 2 because a TCI channel was not available. On the previous day's operation, the operator changed IC_EF4 from -1305 (the value for the model shot 101080105) to -1250 to correct BZ_0. This same change was used to start the run today. For earlier shots in this run, it was not possible to adjust BR_0 because it was oscillating -- apparently due to a power supply oscillation which was remedied in the course of the run. There were some CAMAC problems similar to those experienced at the end of the last campaign: hangs during the init state. These were removed by turning off unneeded modules (XTOMO) and by repairing connectors/cables (MAGNETICS). In the course of the run, the DNB was fired in synchronization with the C-Mod shots. These shots would have been fired into plasma but for the short duration of the C-Mod shots. The MSE system detected the emission due to the interaction of the beam with the background neutral gas. SCORECARD Plasmas 0 Disruptions 1 Fizzles 6 Duds 6 No power 3 Total 16 |
| Session Leader Comments | |||
| Jun 7 2002 09:33:42:480AM | 1020607002 | Jim Irby | flash on h-alpha, cii, and c-port tv. |
| Jun 7 2002 11:49:32:657AM | 1020607009 | Jim Irby | Still having problems with EF2L that may be affecting startup ---- stopping for a while for Bill and Gary to debug |
| Jun 7 2002 12:56:57:647PM | 1020607011 | Jim Irby | Bill and Gary spent some time looks at EF2 supply. Nothing found, but they reseated and cleaned some components. |
| Jun 7 2002 04:35:36:513PM | 1020607013 | Jim Irby | EF2L supply is fixed Dud. Bz0 high. |
| Jun 7 2002 05:16:24:187PM | 1020607016 | Jim Irby | Plasma: 530kA, 122 ms |
| Physics Operator Comments | |||
| Jun 7 2002 08:03:29:340AM | Bill Rowan | Run Plan for run 1020607 Plasma Startup (298a) SL:Irby PO:Rowan EO: Cochran/Dekow Overnight ECDC in D2 at 2e-4 Torr, stopping at 07:00 Startup from 1010801015; an 800 kA shot We will want between shot ecdc in D2 c-side and b-top gas should be as on run 1020606 We should try to have the following diagnostics if at all possible: . TCI . Video view from A-Hor (or new F-Hor if possible) . G-side ratiomatic . single chord VB . CII, or H-alpha, or some othe photon... Expect a delay in start of operations this morning for magnetics repair. | |
| Jun 7 2002 08:45:52:593AM | Bill Rowan | Started pcs There will be no density feedback today. Set the feedback to 0 after 100 ms. | |
| Jun 7 2002 08:56:59:250AM | Bill Rowan | Changed IC_EF4 from -1305 to -1250. Note BZ_0 for the last shot 023 from yesterday. | |
| Jun 7 2002 09:10:33:897AM | 1020607001 | Bill Rowan | 001. No power |
| Jun 7 2002 09:29:03:113AM | 1020607002 | Bill Rowan | 002. Signal on H-alpha and CII. No current rise. For the next shot: Change IC_EF4 from -1250 to -1200. |
| Jun 7 2002 09:46:32:043AM | 1020607003 | Bill Rowan | 003. Dud. ECDC before this shot. |
| Jun 7 2002 09:55:40:997AM | 1020607003 | Bill Rowan | Next shot. No ECDC before the next shot. Reduced BR_0 by 1 mT |
| Jun 7 2002 10:10:47:080AM | 1020607004 | Bill Rowan | 004. Fizzle. Next shot. No ECDC Lowered BR_0 by 0.75 mT Increased IC_EF4 from -1200 to -1190 |
| Jun 7 2002 10:27:23:733AM | 1020607005 | Bill Rowan | 005. Dud. Next shot. No ECDC Increased IC_EF4 from -1190 to -1180 |
| Jun 7 2002 10:43:13:147AM | 1020607006 | Bill Rowan | 006. Dud Next shot. ECDC before the shot Increased IC_EF4 from -1180 to -1170 |
| Jun 7 2002 11:06:49:573AM | 1020607007 | Bill Rowan | 007. Dud. Next shot. ECDC before shot. Changed BR_0 to increase by 2 mT |
| Jun 7 2002 11:23:59:913AM | 1020607008 | Bill Rowan | 008. Fizzle. Next shot. ECDC before this shot. |
| Jun 7 2002 11:46:15:197AM | 1020607009 | Bill Rowan | 009. Fizzle Next shot. ECDC before this shot. |
| Jun 7 2002 12:03:39:613PM | 1020607010 | Bill Rowan | 010. Dud. No changes before the next shot. |
| Jun 7 2002 12:57:55:507PM | 1020607011 | Bill Rowan | 011. No power. CAMAC server is down |
| Jun 7 2002 04:43:02:603PM | 1020607013 | Bill Rowan | 013. Dud Next shot. IC_EF4 from -1170 to -1180 Add 1 ms to the gas prepuff |
| Jun 7 2002 04:51:31:193PM | 1020607014 | Bill Rowan | 014. Fizzle Next shot. Add 2 ms to gas prepuff |
| Jun 7 2002 05:10:26:960PM | 1020607015 | Ian Hutchinson | Ran user10/hutch/mds/predictors/load_predictors.pro This is, I think, supposed to update all the coefficients in the analysis fluxihh tree. It was up till now using the f24A flux loop. After shot 15 it will use f24. Looking in a traverser, the loop is really changed. |
| Jun 7 2002 05:19:08:377PM | 1020607016 | Bill Rowan | 016. Plasma, 120 ms. 0.5 MA Large carbon puff at theend of the shot. |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 09:06:08:390AM | Plasma | Bad | EF1 Commutation Supply was off |
| 2 | 09:18:54:377AM | Plasma | Ok | |
| 3 | 09:40:44:257AM | Plasma | Ok | |
| 4 | 09:57:53:687AM | Plasma | Ok | |
| 5 | 10:13:43:570AM | Plasma | Ok | |
| 6 | 10:30:39:957AM | Plasma | Ok | |
| 7 | 10:54:14:273AM | Plasma | Ok | |
| 8 | 11:14:46:680AM | Plasma | Ok | |
| 9 | 11:37:18:683AM | Plasma | Ok | |
| 10 | 11:56:57:430AM | Plasma | Ok | |
| 11 | 12:52:56:483PM | Plasma | Bad | Camac2_Server went down during init |
| 12 | 04:13:23:993PM | Plasma | Bad | Camac Problems |
| 13 | 04:28:14:207PM | Plasma | Ok | |
| 14 | 04:43:40:200PM | Plasma | Ok | |
| 15 | 04:56:40:127PM | Plasma | Ok | |
| 16 | 05:09:42:410PM | Plasma | Ok | |