Alcator C-Mod Run 1020627 Information

Back to runs

Miniproposals
Miniproposal:259
Date Filed: 4/5/2000
Title:MSE Calibration
First Author:Norton Bretz
Session Leader:Howard Yuh (shots 1-23)

Operators
Session leader(s):Howard Yuh
Physics operator(s):Steve Wolfe
Engineering operator(s):Gary Dekow

Engineering Operator Run Comment
RF Conditioning and MSE Beam-into-gas MP259 then continue MP298A startup

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries
Entered: Jul 7 2004 04:37:15:147PM
Author: To Be Determined
Physics Operator Summary for Th. 6/27/2002

MP259 MSE Calibration
RF Conditioning between shots
SL: Yuh, Wukitch
PO: Wolfe
EO: Dekow

Plan:
------
ECDC Overnight stopping by 7:00 AM
Run begins at 8:00AM and ends at 2:00PM

We will begin with TF and EF4 beam-into-gas shots for the MSE.
RF will do RF conditioning of J-port into vacuum between shots.
Later in the day we will resume plasma operation.

Engineering Setup:
Power System setup as for 1010720012 :
TF and EF4 only enabled for hybrid control
fizzle detector moved to 0.35sec
Gas setup:
B-Top 6 psi D2 Hybrid Enabled (PG4)
B-side lower 1 psi Ar Hybrid DISABLED (PG1)
B-side upper 10 psi D2 Hybrid DISABLED (PG2, for ECDC)
C-Side 30 psi D2 Hybrid DISABLED (PG3)
J-Bottom leave as is
Enable the following gate valves:
DNB
RF Setup: Xmtr #3 and 4 in Run On
PCS: Use segment 1 only, begin with load from 1010720012. We want 0.4mTorr
this time, so reduce the gas puff duration from 400msec to 130msec. Can tune
this with no power shots.

Results:
--------
We didn't get to do any plasma shots. Howard got most of the MSE shots he
wanted, except for the highest vertical field point at 4.5T. EF3 blew fuses
and repair would have taken too long. The Bz=.7T point at 5.3T had a short
beam pulse, but may be usable.

Things got off to a slow start. There was a power glitch last night that
caused several problems, and the high humidity cased condensation problems in
one OH supply and the RF crowbar cabinets; the latter led to an arc that
required several power room entries to track down and fix.

One consequence of the glitch was that SHAPE shut down. This caused the hybrid
coldstart to hang of course. Once I figured out that SHAPE was down, I
rebooted it; this takes about half an hour. ibq$bcs search showed all nodes
reachable. I then had to stop the BITBUS and HLOADER_SERVER servers before I
could do the coldstart successfully. All of this got done before 8:00,
barely. The Gas_camac Incaa_01 failed to init on shot 1, which meant we
couldn't look at the pressures. Dave Bellofato power cycled the crate, after
which it armed ok, and it worked the rest of the day.

We ran with the pump valves closed. My idea of doing this was to get a flat
pressure pulse, since Howard had originally planned to vary the beam timing to
see the end of at TF pulse. However, it turns out that the beam duct pumps on
the torus for a long time; the gate valve closes somewhere between 2sec and
5sec, and typically the pressure drops a factor of 2 while it's open.

We did a full sequence of shots at tf=-5.3T (I_tf=-150kA) with EF4 values of
-1, 0, 1, 3, and 5kA, and one point with EF3 added in at 6kA. A second attempt
with the EF3 included resulted in a blown fuse (estimated repair time >
30min), so we left EF3 off for the rest of the run. We then did a second
sequence at tf=-4.5T (I_tf=-127kA) with the same EF4 currents. The final data
point was a tf=-2.5T (I_tf= -72kA); this took 3 tries because I kept screwing
up the setup, but we finally got it just at 2:00PM.

The RF group fixed their arc problem and finally got some between shot
conditioning done starting around shot 12. Their shot rate was limited because
the C-Mod data acquisition cycle was taking nearly the full ten minutes
minimum recool time. It's not clear what was taking so long, since we had been
getting much shorter data store cycles on plasma runs.




Session Leader Comments

Physics Operator Comments
Jun 27 2002 07:39:12:937AMSteve WolfeSetting up for beam into gas MSE calibration
Inmport seq 1 from 1010720012
shorten pg4 to 131msec (was 400)
turn off seg 2
load/clean
coldstart seems to hang.
shape had crashed last night. Reboot it in the interface room, may need to stop the servers.
bitbus errors on all nodes.
When it finishes I'll stop the servers and try again.
Jun 27 2002 07:51:01:953AMSteve Wolfein tcl stop server bitbus and hloader_server
log into shape, it's real slow. batch_2 still running
do a bcs search
BCS>sea
Bitbus Addresses

Device Code (16): 99, Version Number (16): 1
Node List (10):
0 5 6 7 8 9 10 11
16 17 18 19 24 25 26 27
32 33 34 35 40 41 42 43
48 49 50 51 76 80 81 82
83 97 98 99
looks ok.
try another coldstart (hyb_Init_dispatch)
ok, all matrices respond.
hloader server ok.

We'll do a no power test for shot 1 anyway.
Jun 27 2002 08:34:48:787AM1020627001Steve Wolfeshot#1: gas/dnb/hybrid test only. Use gatevalves closed in pulse.
toggle ninja off at the plc screen- they pulsed last shot yesterday and I don't
know they turned it off.
beam will fire at 0.15sec.

gas went. gas_camac incaa had an init failure, so no ratiomatic.
itg went to 1.9e-4
beam didn't go. operator error.
rf crew will look for their arc.

Jun 27 2002 08:49:04:620AM1020627002Steve Wolfeshot#2: gas/dnb/hybrid test only. again.
beam will fire at 0.15sec.
dave b. power cycled crate, I init'ed the incaa in tcl ok.
try again.

beam went, perhaps at the wrong time?

at .15sec the ratiomatic reads .475mTorr
Bill sees a beam signature at 0.4sec, p0 down to .46mTorr
pressure falls until 3.5sec, when it goes flat at .27mTorr;
presumably it is pumping out into beam duct.
Jun 27 2002 09:04:10:907AM1020627003Steve Wolfeshot#3: repeat with re-timed beam.
cycle had hung on daqa analysis_server: video_daq:kill_m2_srv and gary had to blow it away

small gas puff? only 8e-5 on torus gauge
got a pulse. ratiomatic signal looks ok, same as last time.
Howard says signals acceptable, beam current still a little low.

next shot: tf -150kA and ef4 at -1kA.
Jun 27 2002 09:31:45:353AM1020627004Steve Wolfeshot#4: tf -150kA and ef4 at -1kA.
Ian's vacbrbz was somehow going to barolo server and failing.
I changed it to claret but it won't go for this shot.

got some 400a induced current on ef3; next time we'll shut the aux power off
to stop the gates.
next shot: increase gas to 165msec, to get pressure up to 0.6mTorr.
Jun 27 2002 09:43:20:177AM1020627005Steve Wolfeshot#5: tf -150kA and ef4 at -1kA.
increase gas to 165msec, to get pressure up to 0.6mTorr.
no beam? looks like dnb gate valve either didn't open or
opened and closed before the shot.
Jun 27 2002 10:00:33:017AM1020627006Steve Wolfeshot#6: tf -150kA and ef4 at -1kA.
increase gas to 165msec, to get pressure up to 0.6mTorr.

ok, got beam and gas.
mflux bz0=-.069 at .15sec

next shot: tf only
Jun 27 2002 10:12:02:073AM1020627007Steve Wolfeshot#7: tf -150kA and ef4 off.
load waveform for ef4 +1kA, supply off this time.

got beam got field. bz0=6mT

next shot: ef4 at +1kA
Jun 27 2002 10:26:41:217AM1020627008Steve Wolfeshot#8: tf -150kA and ef4 +1kA

got field, gas, beam. Bz0=0.06T

next shot: +3KA on EF4
Jun 27 2002 10:43:22:340AM1020627009Steve Wolfeshot#9: tf -150kA and ef4 +3kA
Howard needs to tune a filter.

got fields, gas, no beam!
bz=0.185T

next shot: repeat
Jun 27 2002 10:55:04:977AM1020627010Steve Wolfeshot#10: tf -150kA and ef4 +3kA
gas,fields, and beam.

next shot: 5kA
Jun 27 2002 11:13:38:530AM1020627011Steve Wolfeshot#11: tf -150kA and ef4 +5A
load wire 8 from 1010720024, seg 1 wire 8; leave ef3 off for this shot.

got fields, beam, gas
bz0=.0311T

next shot: add EF3 at 6kA,
Jun 27 2002 11:31:58:357AM1020627012Steve Wolfeshot#12: tf -150kA and ef4 +5A , ef3 +6kA

beam, gas, fields, but beam pulse was short.
bz0=.705T
rf pulsing into vacuum before shot 12
next shot: repeat
Jun 27 2002 11:38:29:570AM1020627013Steve Wolfeshot#13: tf -150kA and ef4 +5A , ef3 +6kA

ef3 crowbarred. no ef3, got beam and gas.
Jun 27 2002 11:55:55:970AM1020627013Steve Wolfeshot#13: tf -150kA and ef4 +5A , ef3 +6kA

ef3 crowbarred. no ef3, got beam and gas.
ef3 has a fuse loss. Go on to the 4.5T EF4 only shots.
Jun 27 2002 12:12:02:933PM1020627014Steve Wolfeshot#14: tf -127kA and ef4 +5kA ,
got beam, fields, gas.
bz0=.312

next shot: ef4=3ka
Jun 27 2002 12:28:08:770PM1020627015Steve Wolfeshot#15: tf -127kA and ef4 +3kA ,
gas,no beam. Got efc too -- operator error, tmx was turned on.
Note that 0V program on the chopper turns the supply on!

next shot: try again.
Jun 27 2002 12:38:38:677PM1020627016Steve Wolfeshot#16: tf -127kA and ef4 +3kA ,

fields, gas, beam (too short)
bz0=.185

next shot: repeat
Jun 27 2002 12:52:32:433PM1020627017Steve Wolfeshot#17: tf -127kA and ef4 +3kA ,

fields, gas, beam
bz0=.186T

next shot: ef4 to +1kA
Jun 27 2002 01:05:38:780PM1020627018Steve Wolfeshot#18: tf -127kA and ef4 +1kA ,
bz0=.059T

next shot: turn on c-side for 100msec at 6sec for plenum calibration
tf only
Jun 27 2002 01:17:48:487PM1020627019Steve Wolfeshot#19: tf -127kA no EF4,
cside puff for 100msec at 6sec for plenum calibration
loaded ef4 -1kA pulse for next shot, supply off for this shot.

got beam, gas, tf. C-side didn't go because the fizzle detector takes
out the gas. Leave it disabled again.

bz0=-.006T

next shot: ef4 to -1kA.
Jun 27 2002 01:30:00:840PM1020627020Steve Wolfeshot#20: tf -127kA , EF4=-1kA

beam,gas,fields.
bz0=-.069T

next shot: tf only at 2.5T
Jun 27 2002 01:41:26:043PM1020627021Steve Wolfeshot#21: tf -72kA , EF4 off
physop error - I didn't load it. Still 127kA

next shot: really -72ka
Jun 27 2002 01:59:11:040PM1020627022Steve Wolfeshot#22: tf -72kA , EF4 off
got beam (maybe short) , field.
No gas puff. I erased it accidentally

next shot: last chance.
Jun 27 2002 02:06:40:630PM1020627023Steve Wolfeshot#23: tf -72kA , EF4 off, gas back to 165msec

got beam gas, field.
bz0=-.004T

That's a wrap.

Engineering Operator Comments
ShotTimeTypeStatusComment
108:09:31:873AMTestOkCycle Test
208:38:18:917AMTestOkGAS TEST
308:56:00:313AMTestOkGas Test
409:23:18:183AMTestOkMSE Calibration
509:36:52:673AMTestOkMSE Calibration
609:53:56:437AMTestOkMSE Calibration
710:07:39:427AMTestOkMSE Calibration
810:22:15:553AMTestOkMSE Calibration
910:38:35:117AMTestOkmse calibration
1010:51:57:607AMTestOkMSE Calibrations
1111:09:05:243AMTestOk
1211:22:05:997AMTestOkMSE Calibrations
1311:35:29:453AMTestBadEF3 Supply Problem
1412:07:19:347PMTestOkMSE Calibration
1512:21:04:180PMTestBadTMX were enable by mistake
1612:33:43:060PMTestOkMSE Calibrations
1712:47:48:317PMTestOkMSE Calibration
1801:00:44:680PMTestOkMSE Calibration
1901:13:29:170PMTestOkMSE Calibration
2001:26:17:600PMTestOkMSE Calibrations
2101:39:07:320PMTestOkMSE Calibration
2201:51:51:090PMTestOkMSE Calibrations
2302:04:30:330PMTestOkMSE Calibration