| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Unknown |
| Physics operator(s): | Jim Irby |
| Engineering operator(s): | Gary Dekow |
| Engineering Operator Run Comment |
| Cycle and Gas Tests; PO:Irby; EO:Dekow |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments |
| Physics Operator Comments | |||
| Jul 15 2002 12:58:05:113PM | Jim Irby | Setting up to run data cycles to test gas puffs and neutral pressure gauges. J-Bottom should be operational again. Possibly one new ratiomatic. | |
| Jul 15 2002 12:59:31:290PM | Jim Irby | Did cold start: rtnode -- data loaded, A matrix responds rtnode -- data loaded, M matrix responds rtnode -- data loaded, PID matrix responds RT_NODE Done 15-JUL-2002 12:58:42.88 No errors indicated from Hybrid | |
| Jul 15 2002 02:28:22:457PM | 1020715001 | Jim Irby | g-side ratiomatic controller has been replaced with Willy's new controller --- will need to check calibration very carefully pulse_gas5 (j-bottom) has been set to turn on from 0.150 to 0.200 s This shot is just a data system test --- no valves enabled Note: even with nothing connected to the hard x-ray camac I have 200mV 120Hz noise spikes. |
| Jul 15 2002 03:16:59:313PM | 1020715003 | Jim Irby | g-side ratiomatic was working for this shot ---- 1.34e-6 Torr with IGT at 1.1e-7 Torr. no gas enabled but we did see a very small pulse at -3 seconds. |
| Jul 15 2002 03:45:42:107PM | 1020715004 | Jim Irby | Gas valves enabled. Should have lots of gas pulse widths too short |
| Jul 15 2002 03:45:59:107PM | 1020715005 | Jim Irby | pulse widths too short |
| Jul 15 2002 04:40:33:457PM | 1020715007 | Jim Irby | We got some calibation data from c-side, j-bottom, and b-top. This shot was done with the gatevalve toggle enabled. |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 02:13:36:107PM | Test | Ok | Cycle and Gas Test |
| 2 | 02:32:33:947PM | Test | Ok | Cycle Test |
| 3 | 02:54:50:950PM | Test | Ok | Cycle Test |
| 4 | 03:19:16:970PM | Test | Ok | cycle and Gas Test |
| 5 | 03:35:22:840PM | Test | Ok | |
| 6 | 03:47:17:170PM | Test | Ok | |
| 7 | 04:06:41:013PM | Test | Ok | Cycle and Gas test |