| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Yijun Lin |
| Physics operator(s): | Bill Rowan |
| Engineering operator(s): | Gary Dekow,Bill Parkin,Bill Cochran |
| Engineering Operator Run Comment |
| Purpose: MP 343A, Study of ICRF Mode Confersion Poloidal Flow Drive/Lin/ |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Entered: Jul 7 2004 03:49:34:023PM |
| Author: Yijun Lin |
| ------------------------------------------------------ Run summary: About 20 shots were dedicated to obtain a somewhat desired species mixture to get mode conversion at the He3-H hybrid layer. After shot 22, hints of correlated flow is seen, especially in shot 29, 30, 31, and 32. In these shots, the mode conversion layer is at about R = 0.75 m (mapped to the lower field side) while the X-ray spectrometer is also viewing at similar location. Later in the run, the flow seemed to disappear, presumablly because of the variation of special mixture. A B field scan is done in shot 40 and 41. Shot 41 possibly sees a flow shear when B field is scanned. We tried to run the fields in shot 42 (5.5 T) and 43 (5.4 T) at the points with max flow velocity as of shot 41, but the result is inconlusive. Unfortunately, there is only one spectrometer (#4) working in this run. If the correlation of the RF power and velocity is real, we won't know whether it is poloidal flow or toroidal flow. In general, the experimental result is encouraging. |
| Physics Operator Summaries |
| Entered: Jul 7 2004 04:37:18:787PM |
| Author: Bill Rowan |
| Physop Summary for Friday, July 11, 2003. 1030711. Purpose: MP 343A, Study of ICRF Mode Confersion Poloidal Flow Drive SL: Lin PO: Rowan EO: Cochran, Dekow, Parkin ENGINEERING SETUP------------------------------------------------------ NOTE>> ECDC overnight in HYDRODGEN p = 2e-4 Torr < 60 C Bake Overnight Run Starts at 8:00 AM and ends at 6:00 PM Power Systems as for 1030710017 A coils in same configuration as on 1030710 Gas setup: Fill B-Top with 6 psi of D2 hybrid enabled (PG4) Fill B-side lower with 1 psi Argon Hybrid Disabled (PG1) Fill B-side upper with 16 psi He3 Hybrid Disabled (PG2) Fill C-side with 30 psi H2 Hybrid enabled (PG3) ICRF: All transmitters in Run On by 7:30 AM Enable the ECE, VUV and DNB gate-valves, assuming no vacuum problems Z-Bolo shutter should be open for run Results---------------------------------------------------------------- The machine ran reasonably well. There were some problems with volt-second consumption during the first few shots. These were corrected by changing the plasma parameters and increasing the limit on OH2L The initial shots were inner wall limited. The latter part of the run was conducted with an SNL equilibrium. There was one outer wall limited shot during the transition to the SNL equilibrium. Absence of the ratiomatic for this run may have caused some problems in that some of the fizzles might have been avoided with shot by shot monitoring of the pressure prior to breakdown. He3 was used in this run. The He3 content of the plasma may have been scanned although there was no diagnostic available for this other than Zeff and plasma density During the run, argon puffs were added in addition to the usual one at 0.3 s. By the end of the run, there were 3 puffs, each of 40 ms duration with no deleterious effect on the plasma. Score card------------------------------------------------------------- plasmas 31 early disruptions 4 fizzles 8 total 43 Details---------------------------------------------------------------- To start, load shot 1030710026. This has the same equilibrium as the shot requested by the SL. Unlike 1030710017, this shot contains both the final settings from run 1030710 for He3 control as well as the H2 control. Also contains an attempt to remove the current divot that we have been seeing in the late part of the startup. Make mods in this shot as requested by session leader Bt = 5.0 T Ip = 1.0 MA nl04 = 1.0e+20 Leave argon disabled for the first shot. Then set for 35 to 40 ms as suggested by John. Overnight ECDC in H2. Ending at 6am. EO: Cochran SL: Lin PO: Rowan 001. Plasma. Disruption during rampdown. Just at the beginning Next shot. Enable argon for the next shot. B-side lower. PG1. Approximately 40 ms 002. Plasma. Disruption at 0.4s Large increase in the soft x-rays. Assume that something fell in. Will just go again. Next shot. No pcs changes 003. Plasma. Disruption at the same time. Next shot. Reduced the rate of rise of IP Reduced the rate of rise of nl_04 Disable B-side lower (Argon puff) 004. Plasma. Disruption at 1.3 s Next shot. Increased the limits on OH2_L. ZCUR changed to 0 from -=1.5 cm 005. Plasma. Disruption during the rampdown at 1.6s Next shot: Add the argon back in. Reduced the current to 800 kA 006. Plasma. Rampdown okay. Next shot. Increased argon puff from 35 ms to 40 ms at request of SL Increase the prepuff by 2 ms from 27 ms by 29 ms 007. Plasma. Rampdown okay Next shot. Increased the prepuff by 2 ms from 29 to 31 ms 008. Plasma. EO: Gary Dekow Next shot. No PCS changes 009. Plasma Next shot. Increased Rcur by 2 cm 010. Plasma. Disruption at 0.5s Next shot. Rcur decreased by 1 cm Cleanin increaed by 1 cm 011. Fizzle. Next shot. No changes. Assume this is the post disruption fizzle. 012. Plasma. Full length Next shot. Reloaded clearin, rcur, clearin from shot 1030710013 013. Plasma. Full length. SNL at last. Next shot. Increased nl_04 to increase the He3 014. Fizzle. Next shot. Reduced prepuff by 2 ms to 29 ms 015. Plasma. Full length. Next shot. Added a maintenance level to PG2 for He3. 2ms pulse at 100V starting at 300 ms with a 35V back porch 016. Fizzle Next shot. Increased IC_EF4 from -1290 to -1280 017. Plasma. Next shot. Increased the He3 018. Fizzle Seems to be in an alternating mode; plasma/fizzle Next shot Decrease IC_EF4 from -1280 to -1300 Reduce prefill by 2 ms to 27 ms 019. Plasma. Next shot. Increased the He3 again. 020. Plasma. Next shot. Increased the He3 again. Increased the TF to 5.4T. 021. Plasma. Next shot. Increased the He3 again. 022. Plasma Next shot. Increased the TF to 5.6 T 023. Fizzle. Next shot. Increase the prefill by 2 ms to 29 ms 024. Plasma. Next shot. Moved the He3 pulse to 0.5 s 025. Fizzle Next shot. Increase the prefill by 2 ms to 31 ms 026. Plasma. EO: Parkin Increase the prefill by 2 ms to 33 ms 027. Plasma Next shot. Increase Ar from 40 ms to 45 ms 028. Fizzle Next shot. Decrease prefill by 2 ms to 31 ms 029. Plasma Next shot. Added a second argon puff at 600 ms 030. Plasma Next shot. No pcs changes 031. Plasma Next shot. No pcs changes. 032. Plasma Next shot. No pcs changes 033. Plasma Next shot. No pcs changes 034. Plasma Next shot. No pcs changes. 035. Plasma Next shot. No pcs changes 036. Plasma Next shot. Reduced He3 pulse 037. Plasma Next shot. No pcs changes 038. Fizzle Next shot. Reduce the prefill by 2 ms to 29 ms 039. Plasma Next shot. Bfield ramp. 5.2 at 0.5 s to 5.8 at 1.5s 040. Plasma Next shot. Added another 40 ms argon puff at 1s 041. Plasma Next shot. Bt = 5.5T 042. Plasma. Next shot. Bt = 5.4 T 043. Plasma Next shot. |
| Session Leader Comments | |||
| Jul 11 2003 06:14:12:533PM | Yijun Lin | ------------------------------------------------------ Run summary: About 20 shots were dedicated to obtain a somewhat desired species mixture to get mode conversion at the He3-H hybrid layer. After shot 22, hints of correlated flow is seen, especially in shot 29, 30, 31, and 32. In these shots, the mode conversion layer is at about R = 0.75 m (mapped to the lower field side) while the X-ray spectrometer is also viewing at similar location. Later in the run, the flow seemed to disappear, presumablly because of the variation of special mixture. A B field scan is done in shot 40 and 41. Shot 41 possibly sees a flow shear when B field is scanned. We tried to run the fields in shot 42 (5.5 T) and 43 (5.4 T) at the points with max flow velocity as of shot 41, but the result is inconlusive. Unfortunately, there is only one spectrometer (#4) working in this run. If the correlation of the RF power and velocity is real, we won't know whether it is poloidal flow or toroidal flow. In general, the experimental result is encouraging. | |
| Jul 11 2003 08:21:27:230AM | 1030711002 | Yijun Lin | disrupted before RF. |
| Jul 11 2003 08:57:45:283AM | 1030711002 | Yijun Lin | Shot 001: Plasma: Bt = 5.0 T, Ip = 1.0 MA, nl04 = 1.0 e20 m^-2, inner wall limited. Disrupted at 1.4 sec. H/D ~ 2.3-1.7 RF: modulated at 3.4 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimate from FRCECE): unclear PCI: No MC waves observed. No argon. Operator error. Next repeat. |
| Jul 11 2003 08:45:09:643AM | 1030711003 | Yijun Lin | disrupted before RF. |
| Jul 11 2003 09:27:24:490AM | 1030711004 | Yijun Lin | Plasma: Bt = 5.0 T, Ip = 1.0 MA, nl04 = 1.0 e20 m^-2, inner wall limited, disrupted at 1.33 sec H/D ~ 1.5 RF: modulated at 3.5 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimate from FRCECE): at flux surface R ~ 0.75 m (uncertain) PCI: No MC wave(s) observed No argon. Delibrately disabled to get plasma shot. |
| Jul 11 2003 09:40:01:837AM | 1030711005 | Yijun Lin | Plasma: Bt = 5.0 T, Ip = 1.0 MA, nl04 = 1.0 e20 m^-2, inner wall limited, H/D ~ 1.4 RF: modulated at 3.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimate from FRCECE): uncertain PCI: No MC wave(s) observed. No argon. Delibrately disabled to get plasma shot. RF is ``cooling'' plasma by outgasing. Next try 800 kA and enable Argon. ------ |
| Jul 11 2003 09:53:23:690AM | 1030711006 | Yijun Lin | Plasma: Bt = 5.0 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, inner wall limited H/D ~ 1.5 RF: modulated at 3. MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimate from FRCECE): unclear Too little argon. Next: more argon. |
| Jul 11 2003 05:09:20:393PM | 1030711007 | Yijun Lin | Shot 007 Plasma: Bt = 5.0 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, inner wall limited H/D ~ 1.5 RF: modulated at 3. MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimate from FRCECE): unclear |
| Jul 11 2003 01:34:30:200PM | 1030711008 | Yijun Lin | Plasma: Bt = 5.0 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, inner wall limited H/D ~ 2 RF: modulated at 2.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimate from FRCECE): ? Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) No rf correlated flow observed. No data from spectrometer #2. Next shot: same density, Lower single null. Want to do He3 scan to move the MC layer. |
| Jul 11 2003 01:34:37:153PM | 1030711009 | Yijun Lin | Plasma: Bt = 5.0 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, inner wall limited H/D > 2 RF: modulated at 2.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimate from FRCECE): ? Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) No rf correlated flow observed). No data from spectrometer #2 (?). Next shot: Lower SN |
| Jul 11 2003 10:39:29:470AM | 1030711010 | Yijun Lin | Plasma: Bt = 5.0 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. disrupted at 0.55 sec. |
| Jul 11 2003 10:48:17:173AM | 1030711011 | Yijun Lin | fizzle |
| Jul 11 2003 11:10:18:997AM | 1030711012 | Yijun Lin | Plasma: Bt = 5.0 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 3 ? RF: modulated at 2.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimate from FRCECE): unclear (R = 0.75 cm ??) Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) No rf correlated flow observed). No data from spectrometer #2 (?). |
| Jul 11 2003 05:09:56:160PM | 1030711013 | Yijun Lin | ------ shot 013 Plasma: Bt = 5.0 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 3 RF: modulated at 2.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimate from FRCECE): unclear. Amanda saw a hint of MC heating at R ~ 0.81 - 0.83 m. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) No rf correlated flow observed). No data from spectrometer #2 (?). Next Raise density requirement. |
| Jul 11 2003 11:30:50:030AM | 1030711014 | Yijun Lin | fizzle |
| Jul 11 2003 01:34:50:090PM | 1030711015 | Yijun Lin | Plasma: Bt = 5.0 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 3 RF: modulated at 2.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimate from FRCECE): unclear. From GPC: the MC layer may be at R > 0.8 m. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) No rf correlated flow observed). No data from spectrometer #2 (?). Next raise the He3 maintenance level. |
| Jul 11 2003 05:10:21:880PM | 1030711016 | Yijun Lin | fizzle |
| Jul 11 2003 01:34:55:780PM | 1030711017 | Yijun Lin | Plasma: Bt = 5.0 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 2.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimate from FRCECE): R ~ 0.8 m Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) No rf correlated flow observed). No data from spectrometer #2 (?). Estimated plasma mixture for this shot: 48% H, 12% D, 20% He3. Add a little more argon for next shot. More He3 for next shot. |
| Jul 11 2003 12:26:02:513PM | 1030711018 | Yijun Lin | fizzle |
| Jul 11 2003 05:10:49:427PM | 1030711019 | Yijun Lin | Plasma: Bt = 5.0 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 2.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) More MC heating seen. MC layer (estimate from FRCECE): R >= 0.8 m Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) No rf correlated flow observed). No data from spectrometer #2 (?). More He3 next shot. |
| Jul 11 2003 01:35:08:780PM | 1030711020 | Yijun Lin | Plasma: Bt = 5.0 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 2.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) More MC heating seen. MC layer (estimate from FRCECE): R >= 0.8 m Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) No rf correlated flow observed). No data from spectrometer #2 (?). More He3 next shot. |
| Jul 11 2003 01:35:22:140PM | 1030711021 | Yijun Lin | ----------------------------------- shot 021: Plasma: Bt = 5.4 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 2.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) More MC heating seen. MC layer (estimate from FRCECE): R ~ 0.79 m Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) No rf correlated flow observed). No data from spectrometer #2 (?). More He3 next shot. |
| Jul 11 2003 01:34:14:763PM | 1030711022 | Yijun Lin | Plasma: Bt = 5.4 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 2.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) More MC heating seen. MC layer (estimate from FRCECE): R ~ 0.79 m. SImilar location. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) No rf correlated flow observed). No data from spectrometer #2 (?). More He3 next shot. Move B field to 5.6 T. |
| Jul 11 2003 01:33:55:250PM | 1030711023 | Yijun Lin | fizzle |
| Jul 11 2003 02:24:40:443PM | 1030711024 | Yijun Lin | shot 024: Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 2.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimated from FRCECE): R ~ 0.75 m. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) Delay He3, to reduce MARFE. |
| Jul 11 2003 01:58:53:077PM | 1030711025 | Yijun Lin | fizzle |
| Jul 11 2003 02:24:34:773PM | 1030711026 | Yijun Lin | Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 2.3 MW, 100 ms on, 100 ms off. (0.5 to 1.4 sec) MC layer (estimated from FRCECE): R ~ 0.75 m (?). Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) About twice big velocity than previous shots seen. Possible correlation with RF power. (RF driven?) Next Modulate RF at 200 ms on, 200 ms off to get more rotation data. |
| Jul 11 2003 02:48:51:913PM | 1030711027 | Yijun Lin | Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 2.3 MW, 200 ms on, 200 ms off. (0.5 to 1.4 sec) MC layer (estimated from FRCECE): R ~ 0.75 m. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) No clear correlation with RF. |
| Jul 11 2003 02:40:00:193PM | 1030711028 | Yijun Lin | fizzle |
| Jul 11 2003 03:15:22:747PM | 1030711029 | Yijun Lin | Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 2.3 MW, 200 ms on, 200 ms off. (0.5 to 1.4 sec) MC layer (estimated from FRCECE): R ~ 0.75 m. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) Possible flow drive? (He3 puff at 0.5 sec) (Possible correlation between 0.7 to 1.0 sec). Next do 2nd Ar puff at 0.6 sec. |
| Jul 11 2003 03:18:09:843PM | 1030711030 | Yijun Lin | Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 2.3 MW, 200 ms on, 200 ms off. (0.5 to 1.4 sec) MC layer (estimated from FRCECE): R ~ 0.75 m. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) data good up to 1.1 sec. (Hee puff at 0.5 sec) Possible correlation of the rotation with RF power. Next shot: raise RF power to see whether the rotation goes higher. |
| Jul 11 2003 05:08:46:410PM | 1030711031 | Yijun Lin | shot 031: Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 4 MW, (got similar level as 30). 200 ms on, 200 ms off. (0.5 to 1.4 sec) MC layer (estimated from FRCECE): R ~ 0.75 m. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) He3 puff at 0.5 sec. The velocity is smaller. (Still a hint of correlation). |
| Jul 11 2003 03:42:28:297PM | 1030711032 | Yijun Lin | Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 4 MW, (got similar level as 30). 200 ms on, 200 ms off. (0.5 to 1.4 sec) MC layer (estimated from FRCECE): R ~ 0.75 m. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) He3 puff at 0.5 sec. POssible correlation between 0.8 to 1.2 sec. Next Move RF power earlier by 100 ms to see whether the rotation can follow. |
| Jul 11 2003 03:52:24:707PM | 1030711033 | Yijun Lin | Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 3 MW (got less than 2 MW), 200 ms on, 200 ms off. (0.5 to 1.4 sec) Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) He3 puff at 0.5 sec. No clear indication of any RF related flow. |
| Jul 11 2003 04:11:47:167PM | 1030711034 | Yijun Lin | Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 3 MW, 200 ms on, 200 ms off. (0.5 to 1.4 sec) Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) He3 puff at 0.5 sec. Possible correlation (0.8- 1.4 sec) Next: Delay RF to start 0.7 sec to get long time background rotation without RF. |
| Jul 11 2003 04:19:40:667PM | 1030711035 | Yijun Lin | Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 3 MW (got less 2 MW), RF on 0.7-0.9 sec and 1.1 - 1.3 sec. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) He3 puff at 0.5 sec. No correlated flow seen. (Need higher power to see the flow?) |
| Jul 11 2003 04:36:26:253PM | 1030711036 | Yijun Lin | Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 3 MW, RF on 0.7-0.9 sec and 1.1 - 1.3 sec. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) He3 puff at 0.5 sec. No clearindication. Suspect the He3 level too high. Next shot try to reduce the He3 level. |
| Jul 11 2003 05:08:14:313PM | 1030711037 | Yijun Lin | Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 3 MW (got about 2 MW), RF on 0.7-0.9 sec and 1.1 - 1.3 sec. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) He3 puff at 0.5 sec. No clear indication. (somehow, I lost the possible flow). Next shot: repeat. See if the RF goes better. |
| Jul 11 2003 04:56:13:523PM | 1030711038 | Yijun Lin | fizzle |
| Jul 11 2003 05:19:14:083PM | 1030711039 | Yijun Lin | shot 039: Plasma: Bt = 5.6 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: modulated at 3 MW, RF on 0.7-0.9 sec and 1.1 - 1.3 sec. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) He3 puff at 0.5 sec. No clear indication. Next Ramp B field from 5.2 T to 5.8 T to see where the MC layer exactly. ------- |
| Jul 11 2003 05:49:53:520PM | 1030711040 | Yijun Lin | Plasma: Bt = 5.2-5.8 T ramp, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: 2.5 MW, continuous, No modulation. Check if there is any correlation of the rotation with the B field. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) A weak trend of the velocity with B field. Not yet know why. Next repeat. One more argon puff at 1.0s. (0.3 s, 0.6 s). Hope the RF will stay on. ------- |
| Jul 11 2003 05:50:12:770PM | 1030711041 | Yijun Lin | Plasma: Bt = 5.2-5.8 T ramp, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: 2.5 MW, continuous, No modulation. Check if there is any correlation of the rotation with the B field. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) flow shear detected at t = 0.9 and 1.1 sec ? (B at 5.4 to 5.5 T) Possible. Next run Bt at 5.5 T, to see whether we can see the velocity again also ramp RF power. |
| Jul 11 2003 05:58:26:817PM | 1030711042 | Yijun Lin | -------------------------------------- shot 042: Plasma: Bt = 5.5 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: 1 MW -- 4 MW, continuous, No modulation. 0.7 - 1.4 sec. Check if there is rotation in correlation with the RF power. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) Hard to say whether there is effect on the flow (if there is any). Next: try 5.4 T. |
| Jul 11 2003 06:13:54:690PM | 1030711043 | Yijun Lin | -------------------------------------------------- shot 043: Plasma: Bt = 5.4 T, Ip = 0.8 MA, nl04 = 1.0 e20 m^-2, lower single null. H/D ~ 4 RF: 1 MW -- 4 MW, continuous, No modulation. 0.7 - 1.4 sec. Check if there is rotation in correlation with the RF power. Rotation: Spectrometer #4 (R = 0.747 m, Z = 0.079 m) Flow may be in different direction as shot 42, but it is inclusive. End of run |
| Physics Operator Comments | |||
| Jul 11 2003 07:39:48:817AM | Bill Rowan | Engineering Setup for Friday, July 11, 2003. 1030711. Purpose: MP 343A, Study of ICRF Mode Confersion Poloidal Flow Drive SL: Lin PO: Rowan ENGINEERING SETUP NOTE>> ECDC overnight in HYDRODGEN p = 2e-4 Torr < 60 C Bake Overnight Run Starts at 8:00 AM and ends at 6:00 PM Power Systems as for 1030710017 A coils in same configuration as on 1030710 Gas setup: Fill B-Top with 6 psi of D2 hybrid enabled (PG4) Fill B-side lower with 1 psi Argon Hybrid Disabled (PG1) Fill B-side upper with 16 psi He3 Hybrid Disabled (PG2) Fill C-side with 30 psi H2 Hybrid enabled (PG3) ICRF: All transmitters in Run On by 7:30 AM Enable the ECE, VUV and DNB gate-valves, assuming no vacuum problems Z-Bolo shutter should be open for run To start, load shot 1030710026. This has the same equilibrium as the shot requested by the SL. Unlike 1030710017, this shot contains both the final settings from run 1030710 for He3 control as well as the H2 control. Also contains an attempt to remove the current divot that we have been seeing in the late part of the startup. Make mods in this shot as requested by session leader Bt = 5.0 T Ip = 1.0 MA nl04 = 1.0e+20 Leave argon disabled for the first shot. Then set for 35 to 40 ms as suggested by John. Overnight ECDC in H2. Ending at 6am. EO: Cochran | |
| Jul 11 2003 08:15:07:663AM | 1030711001 | Bill Rowan | 001. Plasma. Disruption during rampdown. Just at the beginning |
| Jul 11 2003 08:15:21:540AM | 1030711001 | Bill Rowan | Next shot. Enable argon for the next shot. B-side lower. PG1. Approximately 40 ms |
| Jul 11 2003 08:22:01:043AM | 1030711002 | Bill Rowan | 002. Plasma. Disruption at 0.4s |
| Jul 11 2003 08:29:56:317AM | 1030711002 | Bill Rowan | Large increase in the soft x-rays before the disruption. Assume that something fell in. Will just go again. Next shot. No pcs changes |
| Jul 11 2003 08:49:50:917AM | 1030711003 | Bill Rowan | 003. Plasma. Disruption at the same time. Next shot. Reduced the rate of rise of IP Reduced the rate of rise of nl_04 |
| Jul 11 2003 08:52:24:850AM | 1030711003 | Bill Rowan | Disable B-side lower (Argon puff) |
| Jul 11 2003 09:23:48:403AM | 1030711004 | Bill Rowan | 004. Plasma. Disruption at 1.3 s Next shot. Increased the limits on OH2_L. ZCUR changed to 0 from -1.5 cm |
| Jul 11 2003 09:35:32:940AM | 1030711005 | Bill Rowan | 005. Plasma. Disruption during the rampdown at 1.6s Next shot: Add the argon back in. Reduced the current to 800 kA |
| Jul 11 2003 09:48:07:923AM | 1030711006 | Bill Rowan | 006. Plasma. Rampdown okay. Next shot. Increased argon puff from 35 ms to 40 ms at request of SL Increase the prepuff by 2 ms from 27 ms by 29 ms |
| Jul 11 2003 09:59:10:957AM | 1030711007 | Bill Rowan | 007. Plasma. Rampdown okay Next shot. Increased the prepuff by 2 ms from 29 to 31 ms |
| Jul 11 2003 10:22:32:940AM | 1030711008 | Bill Rowan | 008. Plasma. EO: Gary Dekow Next shot. No PCS changes |
| Jul 11 2003 10:23:49:610AM | 1030711009 | Bill Rowan | 009. Plasma Next shot. Increased Rcur by 2 cm |
| Jul 11 2003 10:53:24:920AM | 1030711010 | Bill Rowan | 010. Plasma. Disruption at 0.5s Next shot. Rcur decreased by 1 cm Clearin increased by 1 cm |
| Jul 11 2003 10:48:35:237AM | 1030711011 | Bill Rowan | 011. Fizzle. Next shot. No changes. Assume this is the post disruption fizzle. |
| Jul 11 2003 11:13:19:090AM | 1030711012 | Bill Rowan | 012. Plasma. Full length Next shot. Reloaded clearin, rcur, clearin from shot 1030710013 |
| Jul 11 2003 11:24:03:607AM | 1030711013 | Bill Rowan | 013. Plasma. Full length. SNL at last. Next shot. Increased nl_04 to increase the He3 |
| Jul 11 2003 11:39:55:403AM | 1030711014 | Bill Rowan | 014. Fizzle. Next shot. Reduced prepuff by 2 ms to 29 ms |
| Jul 11 2003 11:50:57:937AM | 1030711015 | Bill Rowan | 015. Plasma. Full length. Next shot. Added a maintenance level to PG2 for He3. 2ms pulse at 100V starting at 300 ms with a 35V back porch |
| Jul 11 2003 11:59:49:390AM | 1030711016 | Bill Rowan | 016. Fizzle Next shot. Increased IC_EF4 from -1290 to -1280 |
| Jul 11 2003 12:19:13:513PM | 1030711017 | Bill Rowan | 017. Plasma. Next shot. Increased the He3 |
| Jul 11 2003 12:34:00:013PM | 1030711018 | Bill Rowan | 18. Fizzle Seems to be in an alternating mode; plasma/fizzle Next shot Decrease IC_EF4 from -1280 to -1300 Reduce prefill by 2 ms to 27 ms |
| Jul 11 2003 12:47:20:437PM | 1030711019 | Bill Rowan | 019. Plasma. Next shot. Increased the He3 again. |
| Jul 11 2003 01:00:03:390PM | 1030711020 | Bill Rowan | 020. Plasma. Next shot. Increased the He3 again. Increased the TF to 5.4T. |
| Jul 11 2003 01:10:52:623PM | 1030711021 | Bill Rowan | 021. Plasma. Next shot. Increased the He3 again. |
| Jul 11 2003 01:28:21:373PM | 1030711022 | Bill Rowan | 022. Plasma Next shot. Increased the TF to 5.6 T |
| Jul 11 2003 01:36:34:920PM | 1030711023 | Bill Rowan | 023. Fizzle. Next shot. Increase the prefill by 2 ms to 29 ms |
| Jul 11 2003 01:48:54:280PM | 1030711024 | Bill Rowan | 024. Plasma. Next shot. Moved the He3 pulse to 0.5 s |
| Jul 11 2003 02:32:35:803PM | 1030711027 | Bill Rowan | 027. Plasma Next shot. Increase Ar from 40 ms to 45 ms |
| Jul 11 2003 02:41:54:133PM | 1030711028 | Bill Rowan | 028. Fizzle Next shot. Decrease prefill by 2 ms to 31 ms |
| Jul 11 2003 03:02:30:097PM | 1030711029 | Bill Rowan | 029. Plasma Next shot. Added a second argon puff at 600 ms |
| Jul 11 2003 03:13:43:023PM | 1030711030 | Bill Rowan | 030. Plasma Next shot. No pcs changes |
| Jul 11 2003 03:27:57:817PM | 1030711031 | Bill Rowan | 031. Plasma Next shot. No pcs changes. |
| Jul 11 2003 03:44:09:597PM | 1030711033 | Bill Rowan | 032. Plasma Next shot. No pcs changes |
| Jul 11 2003 03:54:12:930PM | 1030711033 | Bill Rowan | 033. Plasma Next shot. No pcs changes |
| Jul 11 2003 04:08:03:923PM | 1030711034 | Bill Rowan | 034. Plasma Next shot. No pcs changes. |
| Jul 11 2003 04:24:34:863PM | 1030711035 | Bill Rowan | 035. Plasma Next shot. No pcs changes |
| Jul 11 2003 04:36:14:220PM | 1030711036 | Bill Rowan | 036. Plasma Next shot. Reduced He3 pulse |
| Jul 11 2003 04:51:40:953PM | 1030711037 | Bill Rowan | 037. Plasma Next shot. No pcs changes |
| Jul 11 2003 04:57:36:400PM | 1030711038 | Bill Rowan | 038. Fizzle Next shot. Reduce the prefill by 2 ms to 29 ms |
| Jul 11 2003 05:03:44:023PM | 1030711038 | Bill Rowan | 038. Fizzle Next shot. Reduce the prefill by 2 ms to 29 ms |
| Jul 11 2003 05:20:36:587PM | 1030711039 | Bill Rowan | 039. Plasma Next shot. Bfield ramp. 5.2 at 0.5 s to 5.8 at 1.5s |
| Jul 11 2003 05:33:19:660PM | 1030711040 | Bill Rowan | 040. Plasma Next shot. Added another 40 ms argon puff at 1s |
| Jul 11 2003 05:46:00:667PM | 1030711041 | Bill Rowan | 041. Plasma Next shot. Bt = 5.5T |
| Jul 11 2003 05:58:20:067PM | 1030711042 | Bill Rowan | 042. Plasma. Next shot. Bt = 5.4 T |
| Jul 11 2003 06:11:20:590PM | 1030711043 | Bill Rowan | |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 08:00:54:970AM | Plasma | Ok | |
| 2 | 08:15:54:530AM | Plasma | Bad | OH1 Self powered circuit fired |
| 3 | 08:42:26:160AM | Plasma | Ok | |
| 4 | 09:09:51:133AM | Plasma | Ok | |
| 5 | 09:26:04:283AM | Plasma | Ok | |
| 6 | 09:39:29:083AM | Plasma | Ok | |
| 7 | 09:53:10:143AM | Plasma | Ok | |
| 8 | 10:05:56:707AM | Plasma | Ok | |
| 9 | 10:19:35:707AM | Plasma | Ok | |
| 10 | 10:32:44:080AM | Plasma | Ok | |
| 11 | 10:46:04:923AM | Plasma | Ok | |
| 12 | 10:59:39:123AM | Plasma | Ok | |
| 13 | 11:13:39:670AM | Plasma | Ok | |
| 14 | 11:27:00:950AM | Plasma | Ok | |
| 15 | 11:40:46:077AM | Plasma | Ok | |
| 16 | 11:53:57:403AM | Plasma | Ok | |
| 17 | 12:06:49:030PM | Plasma | Ok | |
| 18 | 12:23:59:153PM | Plasma | Ok | |
| 19 | 12:37:07:827PM | Plasma | Ok | |
| 20 | 12:50:00:700PM | Plasma | Ok | |
| 21 | 01:03:10:043PM | Plasma | Ok | |
| 22 | 01:16:27:607PM | Plasma | Ok | |
| 23 | 01:29:38:280PM | Plasma | Ok | |
| 24 | 01:42:27:280PM | Plasma | Ok | |
| 25 | 01:55:18:170PM | Plasma | Ok | |
| 26 | 02:08:28:170PM | Plasma | Ok | |
| 27 | 02:22:17:097PM | Plasma | Ok | |
| 28 | 02:35:24:183PM | Plasma | Ok | |
| 29 | 02:48:26:320PM | Plasma | Ok | |
| 30 | 03:03:34:330PM | Plasma | Ok | |
| 31 | 03:16:54:437PM | Plasma | Ok | |
| 32 | 03:29:58:867PM | Plasma | Ok | |
| 33 | 03:43:22:893PM | Plasma | Ok | |
| 34 | 03:57:15:717PM | Plasma | Ok | |
| 35 | 04:12:40:293PM | Plasma | Ok | |
| 36 | 04:25:38:287PM | Plasma | Ok | |
| 37 | 04:39:16:353PM | Plasma | Ok | |
| 38 | 04:53:15:783PM | Plasma | Ok | |
| 39 | 05:08:19:250PM | Plasma | Ok | |
| 40 | 05:24:49:783PM | Plasma | Ok | |
| 41 | 05:37:52:933PM | Plasma | Ok | |
| 42 | 05:51:21:350PM | Plasma | Ok | |
| 43 | 06:06:35:427PM | Plasma | Ok | |