Alcator C-Mod Run 1031120 Information

Back to runs

Miniproposals
Miniproposal:350
Date Filed: 6/25/2003
Title:ICRF Loading Studies
First Author:Alexandre Parisot
Session Leader:Alexandre Parisot (shots 1-31)

Operators
Session leader(s):Alexandre Parisot
Physics operator(s):Jim Irby
Engineering operator(s):Bill Parkin,Bill Cochran

Engineering Operator Run Comment
MP#350 ICRF Loading Studies/Irby/Parisot/Cochran/Parkin

Session Leader Plans

Physics Operators Plans

Session Leader Summaries
Entered: Jul 7 2004 03:49:34:880PM
Author: Alexandre Parisot
MP#350 - Icrf Loading studies
PO: Irby
SL: Parisot

Purpose:
-------
The primary purpose of this run is to simultanously obtain
ICRF coupling measurements and radial density profiles in the
core, edge and scrape-off layer using Thomson scattering and
the A-port Scanning Probe (ASP).

Run Plan:
---------

We want to use minimum ICRF and ohmic power in order to obtain meaningful ASP
probe density profiles, while varying the scrape-off layer conditions,
namely with a density and current scan, in L and H-mode. To minimize
sheath rectification effects, we will use only D and E antennas, which
are located at the other side of the vessel compared to the ASP probe.

The first part of the run will be a 5.4 T L-mode discharges
(similar to 1031118013), 500 kW from D and E antennas.
- shots 1-3: Ip = .6 MA, nel = 6, 9, 12 x 10E19 m^-2
- shots 4-6: Ip = .9 MA, nel = 6, 9, 12 x 10E19 m^-2
- shots 7-9: Ip = 1.2 MA, nel = 6, 9, 12 x 10E19 m^-2
The ASP insertion times are initially 0.75, 0.95, and 1.15 s.

In the second part, we will lower the field to 4.3T (1030604025). This
should trigger an H-mode. Then we repeat the scan above.

If time permits, we will investigate the impact of various waveforms and
phasings on the coupling, power splitting and heating efficiency of J-antenna.


Summary:
--------

A good run. We had some computer problems at the beginning, but after shot
7, things went very well and we completed most of the run plan. Radial
profiles were obtained simultanously with coupling measurements for D and E,
and we had good data from the probes even with 1 MW of ICRF power. Some
difficulty was encountered to trigger H-mode at low current and we could not
obtain an H-mode scan at lower current. With higher current and by placing
the RF power closer to the axis. , we obtained good H mode data.

Initial comparison between the measured loading for D and E and the
prediction from the 1D model is encouraging. More analysis will be needed :
it is critical to perform a careful mapping of the probe and Thomson data to
the midplane in order to connect the profiles. We also had some discrepancy
between the loading curves from D and E.

The measured profiles and coupling measurements will also be
suitable for more advanced simulations using the TOPICA code.

- L-mode part:
005-006: Bt=5.4T, Ip=0.6 MA, nel=0.6 10^20 m^-2
007: Bt=5.4T, Ip=0.6 MA, nel=0.9 10^20
011: Bt=5.4T, Ip=0.9 MA, nel=1.1 10^20 (E antenna only)
012: Bt=5.4T, Ip=0.9 MA, nel=0.9 10^20
013: Bt=5.4T, Ip=0.9 MA, nel=0.6 10^20
014: Bt=5.4T, Ip=1.2 MA, nel=0.6 10^20 (L L H)
015: Bt=5.4T, Ip=1.2 MA, nel=0.9 10^20
016: Bt=5.4T, Ip=1.2 MA, nel=1.1 10^20 (E antenna only)
- H-mode part
020: Bt=4.3T, Ip=0.6 MA, nel=0.8 10^20 (L L L)
021: Bt=4.2T, Ip=0.6 MA, nel=0.8 10^20 (L L L)
022: Bt=4.2T, Ip=1.2 MA, nel=0.8 10^20 (L L L)
023: Bt=4.2T, Ip=1.2 MA, nel=0.8 10^20 (L H H)
024: Bt=4.8T, Ip=1.2 MA, nel=0.8 10^20 (L H H)
026: Bt=4.8T, Ip=1.0 MA, nel=0.8 10^20 (L H H)
027: Bt=4.8T, Ip=1.0 MA, nel=0.6 10^20 (L H H)
028: Bt=4.8T, Ip=1.2 MA, nel=0.6 10^20 (L L H)
029: Bt=4.8T, Ip=1.2 MA, nel=1.0 10^20 (L L H)
030: Bt=5.2T, Ip=1.2 MA, nel=0.8 10^20 (L H H)

Physics Operator Summaries
Entered: Jul 7 2004 04:37:19:770PM
Author: Jim Irby
Engineering setup for Thursday, 20 Nov 2003

MP#350 --- ICRF Loading Studies

SL: Parisot
PO: Irby
BO: Granetz, Beals

ECDC overnight in D2 at 2e-4 Torr, stopping by 07:00.
Bake at 60 C overnight as well.

Run begins at 09:00 and ends at 17:00.

Power systems the same as on 1031118018.

A-coils should be hooked up as on 1031114027 (+Dtop -Dbot -Jtop +Jbot), and
the power supply should be enabled.

Gas setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid enabled (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill C-side with 30 psi D2 Hybrid enabled (PG3)

Enable gatevalves (there will be no vacuum problems): ECE, VUV, DNB

-------------------------------------------------------------------------------
RF Setup: All 4 transmitters in Run On by 08:00
-------------------------------------------------------------------------------

Summary
-------

The machine ran extremely well today. The gas and field settings were
very reproducible and required almost no intervention by the physop.
We explored a wide range of densities, fields, and plasma currents
today. On shot 23 we dropped the field and raised the current enough
to disrupt at 900 kA. All other discharges made it well into
rampdown.

We began by loading shot 1031118018 and enabling seg 2 for SNL. This
shot provided a very good target plasma for the probes.

Note that the sparker current from the new sparker at K-Hor has been
consistently higher than the old sparker at a lower voltage (320 to
1000 uA vs 280 uA). We had no duds.


Problems
--------

We took two cycle tests that indicated the data system was generally
okay, but with a few signals missing (gas puff data for example).
Then on the first plasma attempt (would have been shot 3), the data
system died. Josh stole memory chips from one of the linux boxes and
upgraded the server. This change seems to have solved the problem.

Some of the gas system CAMAC was missing most of the run, but it began
working for no clear reason late in the run.

Score
-----

duds

fizzles 09,16,19,25,31

plasmas 05,06,07,08,10,11,12,13,14,15,
17,18,20,21,22,23,24,26,27,28,
29,30

cycle tests 01,02
missing shots 03,04

Session Leader Comments
Nov 20 2003 09:14:57:810AM1031120000Alexandre ParisotRun Plan for MP#350 - Icrf Loading studies

Purpose:
The primary purpose of this run is to simultanously obtain
ICRF coupling measurements and radial density profiles in the
core, edge and scrape-off layer using Thomson scattering and
the A-port Scanning Probe (ASP).

Run Plan:
We want to use minimum ICRF and ohmic power in order to obtain meaningful ASP
probe density profiles, while varying the scrape-off layer conditions,
namely with a density and current scan, in L and H-mode. To minimize
sheath rectification effects, we will use only D and E antennas, which
are located at the other side of the vessel compared to the ASP probe.

The first part of the run will be a 5.4 T L-mode discharges (similar to 1031118013),
500 kW from D and E antennas.
- shots 1-3: Ip = .6 MA, nel = 6, 9, 12 x 10E19 m^-2
- shots 4-6: Ip = .9 MA, nel = 6, 9, 12 x 10E19 m^-2
- shots 7-9: Ip = 1.2 MA, nel = 6, 9, 12 x 10E19 m^-2
The ASP insertion times are initially 0.75, 0.95, and 1.15 s.

In the second part, we will lower the field to 4.3T (1030604025). This should trigger an H-mode.
The we repeat the scan above.

If time permits, we will investigate the impact of various waveforms and phasings
on the coupling, power splitting
and heating efficiency of J-antenna.





Nov 20 2003 10:29:02:880AM1031120005Alexandre ParisotBt=5.4T, Ip=.6 MA, nel=6 10^19
D : [0.7-1.3] 300 KW
E : [0.7-1.3] 300 kW
ASP: No insertion

Result:

Plasma. NL_04 drops after .7 sec

Next:

Repeat.





Nov 20 2003 10:43:17:260AM1031120006Alexandre ParisotBt=5.4T, Ip=.6 MA, nel=6 10^19
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec
We will do antenna conditionning after 1.2sec

Result:
Plasma. Good probe data.

Next:
Raise density.

Nov 20 2003 10:56:20:937AM1031120007Alexandre ParisotBt=5.4T, Ip=.6 MA, nel=9 10^19
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma.

Next:
Raise density.

Nov 20 2003 11:12:59:360AM1031120008Alexandre ParisotBt=5.4T, Ip=.6 MA, nel=1.2 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:

Plasma.
NL_04 raised to 2 10^20 after .55sec - detachement.
RF did not launch.

Next:
Try nel=1.1 10^20

Nov 20 2003 11:22:05:980AM1031120009Alexandre ParisotBt=5.4T, Ip=.6 MA, nel=1.1 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Fizzle.

Next:
Repeat.

Nov 20 2003 11:40:11:590AM1031120010Alexandre ParisotBt=5.4T, Ip=.6 MA, nel=1.1 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. Similar to 008.

Next:
Keep the same target density and raise current to .9 MA

Nov 20 2003 11:58:00:170AM1031120011Alexandre ParisotBt=5.4T, Ip=.9 MA, nel=1.1 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:

Plasma. D did not run (mismatched).

Next:

Lower density to .9 10^20
Nov 20 2003 12:23:42:167PM1031120012Alexandre ParisotBt=5.4T, Ip=.9 MA, nel=0.9 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma.

Next:
Lower the target density.
Nov 20 2003 12:36:32:327PM1031120013Alexandre ParisotBt=5.4T, Ip=.9 MA, nel=0.6 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. Probe data does not look good for 0.95

Next:
Ip to 1.2 MA. Same target density.
Nov 20 2003 12:51:41:783PM1031120014Alexandre ParisotBt=5.4T, Ip=1.2 MA, nel=0.6 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. Went into H-mode at 0.93 sec

Next:
Raise the density

Nov 20 2003 01:03:20:807PM1031120015Alexandre ParisotBt=5.4T, Ip=1.2 MA, nel=0.9 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma.

Next:
Raise the density to 1.1 10^20


Nov 20 2003 01:18:56:233PM1031120016Alexandre ParisotBt=5.4T, Ip=1.2 MA, nel=1.1 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Fizzle.

Next:
Repeat.


Nov 20 2003 01:36:52:333PM1031120017Alexandre ParisotBt=5.4T, Ip=1.2 MA, nel=1.1 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. D did not run (mismatched)

Next:
Move on to H-mode part.
Lower field 4.3T Ip = 0.6 MA nel=0.8 10^20


Nov 20 2003 01:49:20:753PM1031120018Alexandre ParisotBt=4.3T, Ip=0.6 MA, nel=0.8 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. No RF (D and E mismatched) -> no H-mode.

Next:
Repeat. Retune D and E.


Nov 20 2003 02:03:35:957PM1031120019Alexandre ParisotBt=4.3T, Ip=0.6 MA, nel=0.8 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Fizzle.

Next:
Repeat.



Nov 20 2003 02:23:59:050PM1031120020Alexandre ParisotBt=4.3T, Ip=0.6 MA, nel=0.8 10^20
D : [0.7-1.2] 300 KW
E : [0.7-1.2] 300 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. RF ran. No H-mode.

Next:
Try to get H-mode : Lower Bt 4.2T, RF power to .8 MW total.




Nov 20 2003 02:34:37:177PM1031120021Alexandre ParisotBt=4.2T, Ip=0.6 MA, nel=0.8 10^20
D : [0.7-1.2] 500 KW
E : [0.7-1.2] 500 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. Still no H-mode.

Next:
Raise the current Ip=0.9 MA
Nov 20 2003 02:54:26:300PM1031120022Alexandre ParisotBt=4.2T, Ip=0.9 MA, nel=0.8 10^20
D : [0.7-1.2] 500 KW
E : [0.7-1.2] 500 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. H-mode late (1.2sec). No profile data from probes.

Next:
Raise the current again (1.2 MA)
Nov 20 2003 03:07:27:723PM1031120023Alexandre ParisotBt=4.2T, Ip=1.2 MA, nel=0.8 10^20
D : [0.7-1.2] 500 KW
E : [0.7-1.2] 500 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. Couple of H-modes after 0.85

Next:
Raise the field to 4.8T
Nov 20 2003 03:24:33:380PM1031120024Alexandre ParisotBt=4.8T, Ip=1.2 MA, nel=0.8 10^20
D : [0.7-1.2] 500 KW
E : [0.7-1.2] 500 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. H-modes after 0.77sec

Next:
Lower Ip to 1.0 MA
Nov 20 2003 03:35:00:647PM1031120025Alexandre ParisotBt=4.8T, Ip=1.0 MA, nel=0.8 10^20
D : [0.7-1.2] 500 KW
E : [0.7-1.2] 500 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Fizzle.

Next:
Repeat.


Nov 20 2003 03:52:40:613PM1031120026Alexandre ParisotBt=4.8T, Ip=1.0 MA, nel=0.8 10^20
D : [0.7-1.2] 500 KW
E : [0.7-1.2] 500 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. H-modes after 0.92.

Next:
Lower density 0.6 10^20


Nov 20 2003 04:11:48:473PM1031120027Alexandre ParisotBt=4.8T, Ip=1.0 MA, nel=0.6 10^20
D : [0.7-1.2] 500 KW
E : [0.7-1.2] 500 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. H-modes after .89sec

Next:
Raise current Ip = 1.2 MA



Nov 20 2003 04:23:05:880PM1031120028Alexandre ParisotBt=4.8T, Ip=1.2 MA, nel=0.6 10^20
D : [0.7-1.2] 500 KW
E : [0.7-1.2] 500 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. H-modes after .9sec

Next:
raise density nel=1.0 10^20





Nov 20 2003 04:42:14:083PM1031120029Alexandre ParisotBt=4.8T, Ip=1.2 MA, nel=1.0 10^20
D : [0.7-1.2] 500 KW
E : [0.7-1.2] 500 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. H-mode late 1.11sec

Next:
Bt=5.2T, nel=0.8 10^20




Nov 20 2003 04:54:12:130PM1031120030Alexandre ParisotBt=5.2T, Ip=1.2 MA, nel=0.8 10^20
D : [0.7-1.2] 500 KW
E : [0.7-1.2] 500 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Plasma. H-modes starting 0.74sec

Next:
Repeat. Try to get the probes deeper.




Nov 20 2003 05:04:45:520PM1031120031Alexandre ParisotBt=5.2T, Ip=1.2 MA, nel=0.8 10^20
D : [0.7-1.2] 500 KW
E : [0.7-1.2] 500 kW
ASP: 0.75, 0.95, 1.15 sec

Result:
Fizzle. Last shot.




Physics Operator Comments
Nov 20 2003 07:53:47:263AMJim IrbyEngineering setup for Thursday, 20 Nov 2003

MP#350 --- ICRF Loading Studies

Session leader : Parisot
Physics operator: Irby

ECDC overnight in D2 at 2e-4 Torr, stopping by 07:00.
Bake at 60 C overnight as well.

Run begins at 09:00 and ends at 17:00.

Power systems the same as on 1031118018.

A-coils should be hooked up as on 1031114027 (+Dtop -Dbot -Jtop +Jbot), and
the power supply should be enabled.

Gas setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid enabled (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill C-side with 30 psi D2 Hybrid enabled (PG3)

Enable gatevalves (there will be no vacuum problems): ECE, VUV, DNB

-------------------------------------------------------------------------------
RF Setup: All 4 transmitters in Run On by 08:00
-------------------------------------------------------------------------------
Nov 20 2003 08:07:47:050AM1031120001Jim IrbyCycle test --- All seems okay
Nov 20 2003 08:39:59:760AM1031120002Jim IrbyCycle test --- check if we have gas

gas puff okay, but camac signals from piezo were missing


Nov 20 2003 09:15:17:747AM1031120003Jim IrbyWill start with Part A of MP350 --- density and current scan

Added 2 ms to prepuff --- from 20 to 22 ms

EF4 at -1330 (no change)

Ip ramped down to 600 kA from 800 kA by 400 ms

nl04 to 6e19/m^2

pumpstack gatevalves will be closed for 8 minutes for the first shot

alternator ready at 09:05

CAMAC problems!!!!!!!!! --- no power shot

possible runaway processes: edge probes, hybrid bit bus

Nov 20 2003 10:38:31:950AM1031120005Jim IrbyVery little CAMAC went. No power supplies ran

Josh and guys adding memory to new alcsrv2


Plasma into rampdown --- density was too low past 0.6 s, negative maintenance level fixed for next shot

h/(h+d) about 3%


Nov 20 2003 10:51:47:300AM1031120006Jim Irbyincreased density maintenance level past 0.6 s or so to a positive value

plasma into rampdown --- got nl04 request

Nov 20 2003 10:57:40:887AM1031120007Jim Irbydensity request to 9e19/m^2

reduced argon level from 40 to 25 ms

plasma into rampdown --- got nl04 request

probe data looks good
Nov 20 2003 11:12:32:877AM1031120008Jim Irbydensity request to 1.2e20/m^2

plasma into rampdown

possible shark fin at 0.55 s --- density rises above 2e20/m^2

rf was not able to match to high density

Nov 20 2003 11:22:21:493AM1031120009Jim Irbydropped density request to 1.1e20/m^2 --- hope to cure density rise problem, fins, marfes, etc


fizzle --- fields and gas look good

stopped gatevalve toggle for the next few shots
Nov 20 2003 11:36:13:983AM1031120010Jim IrbyPCS repeat

waited until IGT was at 2e-6 Torr to enter INIT

plasma into rampdown --- same density rise
Nov 20 2003 11:56:45:763AM1031120011Jim IrbyIp to 900 kA --- keeping nl04 at 1.1e20/m^2

IGT at 3.0e-6 Torr

plasma into rampdown


Nov 20 2003 12:20:36:560PM1031120012Jim Irbydensity request to 0.9e20/m^2

going at 3e-6 Torr --- took 16:30 minutes...

then waited to clear out cell --- INIT at 20:15 --- IGT 2.5e-6 Torr

plasma into rampdown
Nov 20 2003 12:40:23:230PM1031120013Jim Irbydensity request to 6e19/m^2

will go at 4e-6 Torr

plasma into rampdown

Nov 20 2003 12:53:54:970PM1031120014Jim IrbyIp to 1200 kA

IGT at 3.2e-6 Torr at INIT

plasma into rampdown

h/(h+d) has been slowly rising --- now about 5%
Nov 20 2003 01:15:25:063PM1031120015Jim Irbydensity request to 9e19/m^2

plasma into rampdown --- 132 kJ with 3 MW of rf --- dW/dP about 39 kJ/MW

pump stack gatevalves toggled for this shot
Nov 20 2003 01:29:23:240PM1031120016Jim Irbydensity request to 11e19/m^2

fizzle --- stopped gatevalve toggle

Nov 20 2003 01:38:07:270PM1031120017Jim IrbyTry again at 1.1e20/m^2

plasma into rampdown
Nov 20 2003 01:54:22:193PM1031120018Jim Irbydensity request to 8e19/m^2
Ip request to 600 kA
Bt ramped down from 5.4 to 4.5 T

plasma into rampdown

Nov 20 2003 02:12:44:677PM1031120019Jim IrbyBt to 4.38 T --- saw no H-modes last shot

fizzle ---- no reason determined

Nov 20 2003 02:23:23:770PM1031120020Jim Irbyrepeat with no PCS changes

plasma into rampdown --- still no h-mode
Nov 20 2003 02:32:50:910PM1031120021Jim IrbyBt rampdown to 4.2 T (114 kA)

plasma to rampdown --- no h-modes


Nov 20 2003 02:53:54:147PM1031120022Jim IrbyIp request to 900 kA

Added 1 ms to gas puff

plasma into rampdown --- h-mode starting 1.2 s, but kills rf

Nov 20 2003 03:05:19:880PM1031120023Jim IrbyIp to 1200 kA --- still pushing for ohmic h-mode

plasma for 1.59 s --- q 2.7 --- h-mode starts at 0.85 s

900 kA disruption
Nov 20 2003 03:21:27:660PM1031120024Jim IrbyBt to 4.8 T --- more rf power, no disruption?

plasma into rampdown --- h-modes

Wp 126 kJ

Nov 20 2003 03:54:22:130PM1031120025Jim IrbyIp to 1000 kA

fizzle --- field and gas look great --- CII light a factor of two high?
Nov 20 2003 04:00:23:457PM1031120026Jim Irbytry again

plasma into rampdown --- CII back down to proper level

h/(h+d) up to 6% before rf, but 7% during h-mode

104 kJ with 3 MW rf

Nov 20 2003 04:16:38:550PM1031120027Jim Irbydensity request to 6e19/m^2 from 8e19/m^2

plasma into rampdown --- many h-modes

100 kJ


Nov 20 2003 04:26:20:003PM1031120028Jim IrbyArgon reduced from 40 to 25 ms

Ip to 1200 kA

plasma into rampdown

108 kJ

h/(h+d) nearly 8%


Nov 20 2003 04:46:43:693PM1031120029Jim Irbydensity request to 1e20/m^2

sparker gate reduced (turn off at 1.05 s)

plasma into rampdown
Nov 20 2003 05:17:26:020PM1031120030Jim IrbyBT to 5.2 T
density request to 8e19/m^2

plasma into rampdown

130 kJ
Nov 20 2003 05:17:29:397PM1031120031Jim Irbyrepeat and get a little better probe data

fizzle

Engineering Operator Comments
ShotTimeTypeStatusComment
108:01:26:493AMTestOk
208:13:08:360AMTestOk
309:06:32:770AMTestBad
409:39:55:417AMPlasmaBadcamac error Init
510:22:38:807AMPlasmaOk
610:36:31:140AMPlasmaOk
710:49:47:253AMPlasmaOk
811:03:34:290AMPlasmaOk
911:16:49:780AMPlasmaOk
1011:33:10:050AMPlasmaOk
1111:50:12:130AMPlasmaOk
1212:13:05:847PMPlasmaOk
1312:27:12:413PMPlasmaOk
1412:42:45:150PMPlasmaOk
1512:57:36:217PMPlasmaOk
1601:15:26:860PMPlasmaOk
1701:29:11:020PMPlasmaOk
1801:44:44:863PMPlasmaOk
1901:58:42:443PMPlasmaOk
2002:11:01:647PMPlasmaOk
2102:29:19:677PMPlasmaOk
2202:42:26:020PMPlasmaOk
2302:55:58:253PMPlasmaOk
2403:11:54:333PMPlasmaOk
2503:27:27:067PMPlasmaOk
2603:47:44:147PMPlasmaOk
2704:02:52:457PMPlasmaOk
2804:18:03:177PMPlasmaOk
2904:32:28:787PMPlasmaOk
3004:48:22:850PMPlasmaOk
3105:02:31:600PMPlasmaOk