Alcator C-Mod Run 1040206 Information

Back to runs

Miniproposals
Miniproposal:
Date Filed:
Title:
First Author:
Session Leader: Unknown (shots 1-3)

Operators
Session leader(s): Unknown
Physics operator(s):Steve Wolfe
Engineering operator(s): Unknown

Engineering Operator Run Comment
Cycle Test

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments

Physics Operator Comments
Feb 6 2004 10:27:03:780AM1040206001Steve WolfeSetup to test B-side upper valve
It is presently filled with 20psi Ar.
Draw a 10msec 100V puff at -.09sec to -.08sec

Feb 6 2004 11:50:38:127AM1040206002Steve WolfeDid not get gas on shot 1. Tommy hit the valve with a power supply and
it opened. For shot 2 increase width of puff to 15msec

Engineering Operator Comments
ShotTimeTypeStatusComment
111:22:17:397AMTestOk
211:52:39:750AMTestOk
312:00:30:990PMTestOk