Alcator C-Mod Run 1040309 Information

Back to runs

Miniproposals
Miniproposal:341
Date Filed: 6/4/2003
Title:Power Absorption in ITBs
First Author:Catherine Fiore
Session Leader:Catherine Fiore (shots 11-31)
Miniproposal:355
Date Filed:11/12/2003
Title:ICRF Testing & Conditioning
First Author:Steve Wukitch
Session Leader:Steve Wukitch (shots 1-10)

Operators
Session leader(s):Steve Wukitch,Catherine Fiore
Physics operator(s):Steve Wolfe
Engineering operator(s): Unknown

Engineering Operator Run Comment
MP#355 Post-Boronization conditioning and make RF work at 70MHz

Session Leader Plans

Physics Operators Plans

Session Leader Summaries
Entered: Jul 7 2004 03:49:03:460PM
Author: Catherine Fiore
Shot 11 begins MP 341
_______________

SL: Fiore
PO: Wolfe

The plan is as follows:

Begin by setting up a good off axis double barrier ITB plasma, such as
1031212021, 4.5 T, 80 Mhz), taking particular care that all of the relevant
diagnostics are collecting good data. Try to obtain EDA H-mode at 2 MW. When
an ITB is established began adding 70 Mhz power at the center, beginning at
0.6 MW and increasing shot by shot. Once the limits at this power are
established, the off-axis power should be changed, either lower or higher as
the performance of the rf allows, and the limits for central heating should be
explored again.

(1-4 shots) Establish EDA H-mode with off axis 80 Mhz
and verify the diagnostics

Increment the central rf power to find the central power absorption
(8-10 shots as needed)

Change the amount of off-axis ICRF power and repeat (8-10) shots.

If everything went swimmingly and there is more time, try a 3rd power off axis.

_________________________________________

This run went very well. ITBs formed easily and readily. There were good ITBs
on shots 13, 14,15, 16, 18, 20, 21, 22, 23, 24, 25, 26, 27, 29, 30, and 31.
Initially, we had problems getting steady power from the J-port system which
was supplying the on-axis power. However, once we got it to be reliable, we
were able to operate up to 1.5 MW central power into the ITB without adversely
affecting the ITB. This gives us a record 3.5 MW total power into an ITB
plasma! We likely reached record stored energy and central temperatures in
an ITB on these shots, 27 and 29. Unfortunately, we lost an output tube in
J4 fon shot 29, which kept us from finding what the limiting central power was
for this operation.

Shot summary

1040309011 Two short H-modes. The RF had problems staying on. The
toroidal field was slightly too high. The rf will attempt to get a better
tune.


1040309013 One long H-mode with nice ITB. Rf dropped out as it started to
go ITB, and the central power did not come on as scheduled. Try again.


1040309015 One long H-mode with ITB, but ended a early from excess radiation.
No central RF again. We will drop the 80 Mhz power slightly, and raise the
plasma current slightly to try and get a cleaner rf trace.


1040309016 One long H-mode with ITB, but ended in a disruption.
The peaking was not as pronounced as on the previous shots. No central RF
again

1040309017 Ratty H-mode with no ITB. E-port rf dropped out, and J-Port
didn't stay on.

1040309018 Long H-mode with a small back-trasition at 1.07 s. Still no steady
power from J-Port.

1040309019 Long H-mode with a small back-trasition at 1.0 s. J-Port
stays on! at 0.5 MW. Density rise on the ITB did not clamp, however, as it
typically has at this power in past runs.

1040309020 Long H-mode with a small back-trasition at 0.95 s. Nice ITB
but ends in a disruption. No J-Port power however.

1040309021 Long H-mode, but dubious ITB. J-port stayed on with the exception
of a back transition at 1.3 s.


1040309022 Long H-mode, late ITB. J-port stayed on but did not clamp the
density rise. We are raising the D and E power to see if we can get the
ITB to start earlier.


1040309023 Long H-mode, with ITB. J-port wave form was odd, coming on at
1 s and ramping up to 2MS. Raising the off axis power
did let it go to an ITB earlier, but the high J-port power blew it away.

1040309024 Long H-mode, with nice ITB. J-port had approximately 0.7 MW,
pending calibration by the rf group. We are going to raise the J-port power
another 0.2 MW.

1040309025 Long H-mode, with nice ITB. Apparently this was a repeat of shot 24.
J-port had approximately 0.7 MW, pending calibration by the rf group.
We are really going to raise the J-port power another 0.2 MW for the next
shot.

1040309026 Long H-mode, with nice ITB. J-port had approximately 0.8 MW.
We will try to raise the J-port power another 0.2 MW for the next shot.

1040309027 Long H-mode, with nice ITB, although it cut out after
J-port came on. J-port had approximately 1.3 MW. We will try to repeat
the shot.

1040309028 No TF.

1040309029 Very nice ITB, with central rf clamping and holding the peak VB
signal at just under 8x10^20. This
shot could be a new classic with 1.5 MW out of J-port into an ITB.

1040309030 Very nice ITB. No central power.


1040309031 Very nice ITB. Higher D and E power, but some faults.
No central power

Physics Operator Summaries
Entered: Jul 7 2004 04:36:49:303PM
Author: Steve Wolfe
Physics Operator Summary for Tuesday, Mar 9, 2004

MP#355: Post-boronization conditioning and
Make the RF work at 70MHz
SL: Wukitch
FOLLOWED if possible by
MP#341 Power Absorption in ITB
SL: Fiore

PO: wolfe

Engineering setup:
------------------

Boronize overnight

Run begins at 09:00, ends at 17:00

Power supplies as on 1040218003

Gas System Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid enabled (PG1)
leave B-side upper with 15 psi He3 Hybrid DISABLED (PG2)
fill C-side with 30 psi D2 Hybrid enabled (PG3)
fill NINJA (lower cap) with 8 psi D2

Gate valve permissives for the usual suspects (ECE, VUV, DNB) assuming no
vacuum problems

RF: Transmitters #1,2,3 and 4 in RUN-ON by 08:00

Run Plan:
---------

Start from fiducial-like shot 1040218003, 1MA, nl04=0.85, 5.4T. Get all
transmitters working at nominal power and verify post-boronization EDA
behavior.

If conditioning goes smoothly, proceed to MP#341, getting as far through the
following plan as possible. MP#341 will continue on Wednesday:

Start from 1031212021 with TF lowered from 4.56T to 4.53T. Begin by setting up
a good off axis double barrier ITB plasma, such as 1031212021, 4.5 T, 80 Mhz),
taking particular care that all of the relevant diagnostics are collecting
good data. Try to obtain EDA H-mode at 2 MW. When an ITB is established
began adding 70 Mhz power at the center, beginning at 0.6 MW and increasing
shot by shot. Once the limits at this power are established, the off-axis
power should be changed, either lower or higher as the performance of the rf
allows, and the limits for central heating should be explored again.

(1-4 shots) Establish EDA H-mode with off axis 80 Mhz
and verify the diagnostics

Increment the central rf power to find the central power absorption
(8-10 shots as needed)

Change the amount of off-axis ICRF power and repeat (8-10) shots.

If everything went swimmingly and there is more time, try a 3rd power off axis.

-------------------------------------------------------------------------

Results:
--------

RF commissioning/conditioning went quite well, and Wukitch turned the run over
to Catherine at shot#11. I tweaked the "fiducial" a bit to get rid of some
discontinuities at segment switch, including Ip and Zcur. This, together with
adding pg3 puffing in seg1 seemed useful in minimizing or eliminating an
injection at .1 sec which led to one early disruption (#3). I recommend using
a shot like 1040309010 for future fiducials.

Once we moved on to MP#341 (shot 11) ITB discharges were readily established,
and after a bit of thrashing Steve got J-port working on these cases as
well. This part of the run went extremely well, in that we succeeded in
getting up to 1.5MW into the core without destroying the ITB. Neutron rates in
the ITB phase were up to 2e13, and TS showed good electron heating as
well. The stored energy on a couple of these exceeded 100kJ, which is a record
for C-Mod ITB shots. These results are a dramatic improvement over our previous ITB cases,
which arrested with ~0.6MW of on-axis heating and terminated the ITB with any
more than that.

Unfortunately, on shot #29 the FPA on FMIT#4 died. This ended the on-axis
heating for the day (and the week), but we took two additional shots with
off-axis only ICRF only, at two different powers.

Generally, the machine ran well today. One no power shot was taken because of
a tci laser problem in check. There was one delay to clean contacts on Ross
relays which were causing an I2t fault which wouldn't clear. We had one
recurrence of the NO TF phenomenon, which hasn't happened for awhile and
remains mysterious. On the same shot #29 as we lost the FPA tube we had an IOC
indication on the chopper, but there was no damage and the supply worked fine
on the next shot. Aside from the tube disaster, it was a good run (Other than
that, Mrs Lincoln...)

Scorecard:

Tests/No power 2
Duds 1 (NO TF)
Fizzles 0
Plasmas 28 (1 early disruption)
============== ===
total 31



Session Leader Comments
Mar 9 2004 10:12:17:963AM1040309005Steve Wukitch005 BT~5.4 T, Ip~1 MA, nl_04~0.8
D: 0.75 MW [1,1.4]sec
E: 0.75 MW [1,1.4]sec
J: 0.8 MW [1.25,1.5]sec
result: plasma - late H-mode
D: ran
E: ran 1 fault
J: max faults
Mar 9 2004 10:12:33:637AM1040309006Steve Wukitch006 BT~5.4 T, Ip~1 MA, nl_04~0.8
D: 1 MW [1,1.4]sec
E: 1 MW [1,1.4]sec
J: 0.8 MW [1.25,1.5]sec
result: plasma - late H-mode
D: ran
E: ran 1 fault
J: max faults - J3 is matched but J4 is not
Mar 9 2004 10:24:51:827AM1040309007Steve Wukitch007 BT~5.4 T, Ip~1 MA, nl_04~0.8
D: 1 MW [1,1.4]sec
E: 1 MW [1,1.4]sec
J: 0.8 MW [1.25,1.5]sec
result: plasma - late H-mode
D: ran 8 faults
E: ran
J: ran 3 faults - J4 match needs to be better
Mar 9 2004 10:36:07:780AM1040309008Steve Wukitch008 BT~5.4 T, Ip~1 MA, nl_04~0.8
D: 1 MW [1,1.4]sec
E: 1 MW [1,1.4]sec
J: 1.2 MW [1.25,1.5]sec
result: plasma - late H-mode
D: ran
E: ran 1 fault
J: ran 1 fault
Mar 9 2004 11:23:05:243AM1040309010Steve Wukitch010 BT~5.4 T, Ip~1 MA, nl_04~0.8
D: 1 MW [1,1.4]sec
E: 1 MW [1,1.4]sec
J: 2.2 MW [0.6,1.5]sec
result: plasma
D: ran 1 fault
E: ran 1 fault
J: ran 5 faults
J DC1 calibration needs to be investigated
turn run over to Catherine
Mar 9 2004 11:06:35:860AM1040309011Catherine FioreShot 11 begins MP 341

The plan is as follows:

Begin by setting up a good off axis double barrier ITB plasma, such as
1031212021, 4.5 T, 80 Mhz), taking particular care that all of the relevant
diagnostics are collecting good data. Try to obtain EDA H-mode at 2 MW. When
an ITB is established began adding 70 Mhz power at the center, beginning at
0.6 MW and increasing shot by shot. Once the limits at this power are
established, the off-axis power should be changed, either lower or higher as
the performance of the rf allows, and the limits for central heating should be
explored again.

(1-4 shots) Establish EDA H-mode with off axis 80 Mhz
and verify the diagnostics

Increment the central rf power to find the central power absorption
(8-10 shots as needed)

Change the amount of off-axis ICRF power and repeat (8-10) shots.

If everything went swimmingly and there is more time, try a 3rd power off axis.



Mar 9 2004 11:27:52:017AM1040309011Catherine FioreTwo short H-modes. The RF had problems staying on. The toroidal field was slightly too high.

The rf will attempt to get a better tune.
Mar 9 2004 12:08:50:103PM1040309013Catherine FioreOne long H-mode with nice ITB. Rf dropped out as it started to go ITB,
and the central power did not come on as scheduled.

Try again.

Mar 9 2004 12:16:04:193PM1040309014Catherine FioreOne long H-mode with nice ITB. No central RF


Try again.

Mar 9 2004 12:33:36:063PM1040309015Catherine FioreOne long H-mode with ITB, but ended a early from excess radiation. No central RF again

We will drop the 80 Mhz power slightly, and raise the plasma current slightly to try and get a cleaner rf trace.




Mar 9 2004 12:49:24:587PM1040309016Catherine FioreOne long H-mode with ITB, but ended in a disruption. The peaking was not as pronounced as on the previous shots.
No central RF again






Mar 9 2004 01:03:35:000PM1040309017Catherine FioreRatty H-mode with no ITB. D-port rf dropped out, and J-Port didn't stay on.






Mar 9 2004 01:22:57:593PM1040309018Catherine FioreLong H-mode with a small back-trasition at 1.07 s. Still no steady power from J-Port.






Mar 9 2004 01:41:31:763PM1040309019Catherine FioreLong H-mode with a small back-trasition at 1.0 s. J-Port stays on! at 0.5 MW.
Density rise on the ITB did not clamp, however, as it typically has at this power
in past runs.






Mar 9 2004 01:52:17:327PM1040309020Catherine FioreLong H-mode with a small back-trasition at 0.95 s. Nice ITB but ends in a disruption. No J-Port power however.






Mar 9 2004 02:11:19:370PM1040309021Catherine FioreLong H-mode, but dubious ITB. J-port stayed on with the exception of a back transition at 1.3 s.






Mar 9 2004 02:45:59:703PM1040309022Catherine FioreLong H-mode, late ITB. J-port stayed on but did not clamp the density rise.
We are raising the D and E power to see if we can get the ITB to start earlier.





Mar 9 2004 03:03:23:107PM1040309023Catherine FioreLong H-mode, with ITB. J-port wave form was odd, coming on at 1 s and ramping up to 2MS. Raising the off axis power
did let it go to an ITB earlier, but the high J-port power blew it away.





Mar 9 2004 03:12:24:840PM1040309024Catherine FioreLong H-mode, with nice ITB. J-port had approximately 0.7 MW, pending calibration by the rf group. We
are going to raise the J-port power another 0.2 MW.





Mar 9 2004 03:21:08:837PM1040309025Catherine FioreLong H-mode, with nice ITB. Apparently this was a repeat of shot 24. J-port had approximately 0.7 MW,
pending calibration by the rf group. We are really going to raise the J-port power another 0.2 MW for
the next shot.





Mar 9 2004 03:38:41:597PM1040309026Catherine FioreLong H-mode, with nice ITB. J-port had approximately 0.8 MW. We will try to raise
the J-port power another 0.2 MW for the next shot.





Mar 9 2004 03:58:23:080PM1040309027Catherine FioreLong H-mode, with nice ITB, although it cut out after J-port came on.
J-port had approximately 1.3 MW. We will try to repeat the shot.





Mar 9 2004 04:00:52:443PM1040309028Catherine FioreNo TF




Mar 9 2004 04:48:09:050PM1040309029Catherine FioreVery nice ITB, with central rf clamping and holding the peak VB signal at just under 8x10^20. This
shot could be a new classic with 1.5 MW out of J-port into an ITB.




Mar 9 2004 05:03:18:743PM1040309030Catherine FioreVery nice ITB. No central power




Mar 9 2004 05:04:49:480PM1040309031Catherine FioreVery nice ITB. Higher D and E power, but some faults. No central power




Physics Operator Comments
Mar 9 2004 07:57:29:317AMSteve WolfeSetup for run 1040309:
Run Plan and Engineering Setup for Tues. 9-Mar-2004

MP#355: Post-boronization conditioning and
Make the RF work at 70MHz
SL: Wukitch
FOLLOWED if possible by
MP#341 Power Absorption in ITB
SL: Fiore

PO: wolfe

Engineering setup:
------------------

Boronize overnight

Run begins at 09:00, ends at 17:00

Power supplies as on 1040218003

Gas System Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid enabled (PG1)
leave B-side upper with 15 psi He3 Hybrid DISABLED (PG2)
fill C-side with 30 psi D2 Hybrid enabled (PG3)
fill NINJA (lower cap) with 8 psi D2

Gate valve permissives for the usual suspects (ECE, VUV, DNB) assuming no
vacuum problems

RF: Transmitters #1,2,3 and 4 in RUN-ON by 08:00

Run Plan:
---------

Start from fiducial-like shot 1040218003, 1MA, nl04=0.85, 5.4T. Get all
transmitters working at nominal power and verify post-boronization EDA
behavior.

If conditioning goes smoothly, proceed to MP#341, getting as far through the
following plan as possible. MP#341 will continue on Wednesday:

Start from 1031212021 with TF lowered from 4.56T to 4.53T. Begin by setting up
a good off axis double barrier ITB plasma, such as 1031212021, 4.5 T, 80 Mhz),
taking particular care that all of the relevant diagnostics are collecting
good data. Try to obtain EDA H-mode at 2 MW. When an ITB is established
began adding 70 Mhz power at the center, beginning at 0.6 MW and increasing
shot by shot. Once the limits at this power are established, the off-axis
power should be changed, either lower or higher as the performance of the rf
allows, and the limits for central heating should be explored again.

(1-4 shots) Establish EDA H-mode with off axis 80 Mhz
and verify the diagnostics

Increment the central rf power to find the central power absorption
(8-10 shots as needed)

Change the amount of off-axis ICRF power and repeat (8-10) shots.

If everything went swimmingly and there is more time, try a 3rd power off axis.

Mar 9 2004 08:16:06:510AMSteve WolfeSetup for run 1040309:
PCS setup:
Import seg2 from 1040218003

Load/clean
Load at 9-Mar-2004 08:13:54.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done

Note seg1 is from Friday, pg4=15msec, br0 offset=0, icef4=-1335
Mar 9 2004 09:04:39:357AM1040309002Steve WolfeShot#2: plasma full length.
slow startup.
D&E ok at 0.5MW each, J max retrys

Ratiomatic looks dead. May have been on during boronization.

next shot: decrease pg4 by 2msec
Mar 9 2004 09:20:58:260AM1040309003Steve WolfeShot#3: decrease pg4 by 2msec to 13msec
Also, increase second point on current rise in seg2 to
try to avoid turnaround in current.

Early disruption. .19sec, big injections at 0.1 and .15sec.
Current is above 600kA at .1sec, then turns around

next shot: delay zcur jump past .1sec (this is a fiducial???)
Mar 9 2004 09:32:30:387AM1040309004Steve WolfeShot#4: delay zcur jump past .1sec (seg2/seg1 mismatch by 8mm)
plasma full length. Still has an early injection, not as bad this time.
Seems to correspond to a runaway dump.

next shot: increase pg4 to 15msec, increase seg1 pg3
Mar 9 2004 09:51:57:760AM1040309005Steve WolfeShot#5: increase pg4 to 15msec, increase seg1 pg3
plasma full length. H-mode at 1.16
J still not happy.
Still getting a small injection at 0.1sec.

next shot: a bit more pg3 in seg1
Mar 9 2004 10:06:53:970AM1040309006Steve WolfeShot#6: a bit more pg3 in seg1
No early injection this time, maybe a small runaway.

next shot: no pcs changes
Mar 9 2004 10:15:27:907AM1040309007Steve WolfeShot#7: no pcs changes
Plasma full length.
J ran at .3MW each
H-mode with D&E at 2.5MW after 1sec

next shot: No changes
Mar 9 2004 10:28:56:990AM1040309008Steve WolfeShot#8: No changes
plasma full length
J gets to .4 on 3, .5MW on 4.
No hmode from J, pretty solid eda from D+E

next shot: no changes.
Mar 9 2004 10:45:12:797AM1040309009Steve WolfeShot#9: No changes
plasma, full length

J up to .6 and .8MW

next shot: repeat
Mar 9 2004 11:04:18:373AM1040309010Steve WolfeShot#10: No changes
plasma full length
H-mode at .86sec with Jport at nominal power 1.4MW (.6,.8)
total power gets to 4MW.
Steve says he needs to fix some software; power being reported is apparently
wrong.

next shot: Change over to MP#341
Mar 9 2004 11:19:12:050AM1040309011Steve WolfeShot#11: Change over to MP#341
Import seg2 from 1031212021
Decrease TF current from -124000 to -123184
Change ip[0.1sec] from -450 to -600kA
change zcur jump as before

plasma full length,
Looks like two short H-modes. RF unhappy.
Bt is -4.57; need to drop it more

next shot: drop tfcur to -122000
Mar 9 2004 11:34:58:420AM1040309012Steve WolfeShot#12: drop tfcur to -122000

need to do a no power shot; TCI failed in check.
DPCS will fail as well.

next shot: try again
Mar 9 2004 12:05:17:363PM1040309013Steve WolfeShot#13: drop tfcur to -122000
After a long delay for a cryo/I2t issue,
a full length plasma. Long H-mode.
From the yag/nl4 ratio, we seem to have an ITB, starting
around 1.13sec. No Jport.
D&E RF pretty ratty; I'm sure he can do better.
small injection at .1 sec is back, need to watch it.

next shot: no changes
Mar 9 2004 12:16:44:460PM1040309014Steve WolfeShot#14: no changes
plasma to 1.9sec, tci got lost in rampdown.
Another decent ITB, J tried a little harder this time,
but still faulted out (got J3 but no J4???)
It's into dummy load he says??
No early injection this time.

next shot: repeat for better RF
Mar 9 2004 12:32:18:407PM1040309015Steve WolfeShot#15: repeat for better RF. Ar puff increased from 30 to 40msec
plasma full length, Still no J-port.
ITB is still there.

next shot: drop D&E power, raise Ip by 50kA
Mar 9 2004 12:45:11:753PM1040309016Steve WolfeShot#16: drop D&E power, raise Ip by 50kA (program 850kA)
plasma disrupted at 1.32sec
Injection, seems to be on the inner wall in the video but the gap
is big, that may not be the primary source. The strike is close to
the ef1 pocket and inner side is approaching the nose.

next shot: Move rxl out for a little more clearance.
Mar 9 2004 01:14:51:753PM1040309017Steve WolfeShot#17: Move rxl out for a little more clearance from -.02 to -.01
plasma full length, multiple H-modes; no ITB this time.
D dropped out, Still not getting J.
Got the 1cm on rxl, it's still sliding in during the shot.
I could put a slope on it, but leave well enough alone for now.

next shot: repeat.
Mar 9 2004 01:21:56:200PM1040309018Steve WolfeShot#18: repeat.
plasma disrupted at 1.43sec; I probably need to move rxl some more.
Got our ITB back this time, but got a back transition at 1.09
that kills it off.
Still not getting J-port.

next shot: ramp rxl out by another cm.
Mar 9 2004 01:40:24:040PM1040309019Steve WolfeShot#19:Somehow, I had loaded a ramp in on rxl, change it to be flat at -0.01
plasma to 1.35 sec. The rxl is not helping this disruption. The strikes are
well clear of the pocket this time, so this was a red herring.

Got an ITB and J-port stayed on with ~.4MW, no arresting that I can see.
Also, the early injection is back.

next shot: try a repeat, I don't know what's causing the disruption
Mar 9 2004 01:48:25:773PM1040309020Steve WolfeShot#20: try a repeat, I don't know what's causing the disruption
Another disruption, 1.23sec. It isn't going away.

next shot: drop the current back to 800kA
Mar 9 2004 02:07:26:630PM1040309021Steve WolfeShot#21: drop the current back to 800kA, rxl to -.02; also increase pg4 to 17msec
plasma, full length. EDA until backtrans at 1.3, Got some J~0.4MW, fair ITB, not as
clear on TS as earlier.

next shot: move second seg2 Ip point from .2 to .15sec, 800kA
Mar 9 2004 02:17:36:333PM1040309022Steve WolfeShot#22: move second seg2 Ip point from .2 to .15sec, 800kA
plasma full length, back transition at 0.81sec, following a small
injection at 0.76sec.

next shot: raise D&E power
Mar 9 2004 02:29:56:697PM1040309022Steve WolfeWe have a (hopefully) short delay while some relay contacts
get cleaned to prevent a bad oh resistance reading.
Mar 9 2004 02:55:02:093PM1040309023Steve WolfeShot#23: raise D&E power
blip will be puffing D2 from ninja around 1.4sec

plasma full length, Got wrong waveform on J, starting at 1.sec to 2MW at 1.3
Got 2.3MW on D&E, not a strong peaking before 1sec,
Small injection around .85sec

next shot: try again with correct waveform.
Mar 9 2004 03:09:31:210PM1040309024Steve WolfeShot#24: delay J and go to 0.8MW
plasma full length, eda to 1.28
pretty clear ITB, really taking off at 1,22sec when the sawtooth stops
J comes on at 1.2sec, 0.6MW (Steve says it's really more like 0.8MWatt,
he'll back calibrate later)

next shot: go up another .2MW on J

Mar 9 2004 03:23:57:890PM1040309025Steve WolfeShot#25: go up another .2MW on J
plasma full length, eda to 1.32sec

Looks almost identical to 24, same J-port power
D+E is at 2MW.

next shot: repeat for higher power on all four xmitters
Mar 9 2004 03:35:26:920PM1040309026Steve WolfeShot#26: repeat for higher power on all four xmitters
plasma, full length, eda to 1.38sec
Good ITB, may be clamping, but not obvious to me.
J now is reading ~0.8MW, D+E=2.3MW
Mar 9 2004 03:51:39:353PM1040309027Steve WolfeShot#27: repeat for higher power on J
plasma full length, eda to some kind of event at 1.28, continues
to rampdown. Wmhd >100kJ, neuts_hards to 1.5e13.

next shot: repeat, see if we avoid the event
Mar 9 2004 04:01:11:290PM1040309028Steve WolfeShot#28: repeat, see if we avoid the event
No tf. No apparent faults.

next shot: Once more, with field
Mar 9 2004 04:19:42:973PM1040309029Steve WolfeShot#29: repeat, see if we avoid the event
plasma full length, nice long eda, looks like an ITB,
No sharp event, but still rolls over after 1.35sec;
rf stays on until 1.4 or so, PLC alarms on RF, also IOC on chopper.
probably going to have a little delay while they check it out.
Wookie reports they can't get bias to come up on
J4; he's gone to look for some fuses.


Mar 9 2004 04:51:46:617PM1040309030Steve WolfeShot#30: The fpa on J4 is dead; run J at zero power,
just D+E off-axis power for this shot. We're also checking to
be sure that the chopper is ok.

plasma full length. eda to 1.25sec

next shot: raise power on D+E
Mar 9 2004 05:07:32:233PM1040309031Steve WolfeShot#31: raise power on D+E
plasma full length, eda only to 1.26 again.
Got ITB until the H->L .

End of run.

Engineering Operator Comments
ShotTimeTypeStatusComment
108:41:01:480AMTestOk
208:56:18:320AMPlasmaOk
309:12:39:893AMPlasmaOk
409:26:02:423AMPlasmaOk
509:40:39:150AMPlasmaOk
609:55:40:970AMPlasmaOk
710:10:11:273AMPlasmaOk
810:24:49:530AMPlasmaOk
910:39:39:147AMPlasmaOk
1010:57:25:597AMPlasmaOk
1111:12:26:743AMPlasmaOk
1211:27:48:143AMPlasmaBadTCI failed during check
1311:56:03:320AMPlasmaOk
1412:10:25:903PMPlasmaOk
1512:23:06:080PMPlasmaOk
1612:37:33:117PMPlasmaOk
1712:56:07:257PMPlasmaOk
1801:15:36:707PMPlasmaOk
1901:30:20:120PMPlasmaOk
2001:43:24:623PMPlasmaOk
2101:56:22:600PMPlasmaOk
2202:10:14:870PMPlasmaOk
2302:48:04:020PMPlasmaOk
2403:01:07:353PMPlasmaOk
2503:16:12:830PMPlasmaOk
2603:30:11:413PMPlasmaOk
2703:44:21:730PMPlasmaOk
2803:57:45:533PMPlasmaBadNo TFTF did not fire.
2904:10:18:897PMPlasmaOkThere was an IOC in the Chopper
3004:46:25:343PMPlasmaOk
3105:00:04:257PMPlasmaOk