Alcator C-Mod Run 1040329 Information

Back to runs

Miniproposals
Miniproposal:
Date Filed:
Title:
First Author:
Session Leader:Steve Scott (shots 1-15)

Operators
Session leader(s):Steve Scott
Physics operator(s):Bill Rowan
Engineering operator(s):Gary Dekow

Engineering Operator Run Comment
MSE Calibration Shots; SL: Steve Scott EO: dekow

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments

Physics Operator Comments
Mar 29 2004 01:27:43:820PMBill RowanThe only thing being varied from shot-to-shot are the MSE filter
temperatures.ce day. The gas is D2, coming from
the B-top valve. It's plenum is at 6 psi. The pulse_gas4 is set to
turn on at t=-0.30 s and turn off at t=+0.38 s. Fizzle detector times
have been moved to after 1 s.
Mar 29 2004 01:43:24:160PMEd RollinsThe only thing being varied from shot-to-shot are the MSE fibers:
one fiber is connected to Bill Rowan's spectrometer.
he gas is D2, coming from
the B-top valve. It's plenum is at 6 psi. The pulse_gas4 is set to
turn on at t=-0.30 s and turn off at t=+0.38 s. Fizzle detector times
have been moved to after 1 s.
Mar 29 2004 01:32:28:360PM1040329001Bill Rowan
Reloaded shot 1040312018
Mar 29 2004 02:05:57:320PM1040329004Bill Rowan
Shots are being taken with gas only. We are taking spectra from succesive MSE channels
Mar 29 2004 03:39:37:870PM1040329015Bill Rowan
last shot. We acquired spectra from 6 mse channels with no TF.

Engineering Operator Comments
ShotTimeTypeStatusComment
101:30:47:450PMTestOk
201:39:48:687PMTestOk
301:47:20:057PMTestOk
401:59:44:997PMTestOk
502:08:04:900PMTestOk
602:16:04:600PMTestOk
702:24:55:237PMTestOk
802:34:17:720PMTestOk
902:43:19:190PMTestOk
1002:52:42:330PMTestOk
1103:00:18:323PMTestOk
1203:10:12:137PMTestOk
1303:20:20:603PMTestOk
1403:27:59:227PMTestOk
1503:35:54:800PMTestOk