Alcator C-Mod Run 1040402 Information

Back to runs

Miniproposals
Miniproposal:
Date Filed:
Title:
First Author:
Session Leader:Steve Scott (shots 1-16)

Operators
Session leader(s):Steve Scott
Physics operator(s):Steve Wolfe
Engineering operator(s):Gary Dekow

Engineering Operator Run Comment
MSE calibration SL: Steve Scott

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments

Physics Operator Comments
Apr 2 2004 02:40:32:373PMSteve WolfeSetting up PCS for MSE calibration beam-into-gas shots.
load from 1040312018. Brought up engineering control and loaded
it also from that shot.

Tried to do a coldstart and it failed with a bunch of
server lost errors.

Called Josh. He's working on it.

Note- shots#1-6 today were data system tests by T&J
MSE work will start on shot 7, I think.

Engineering Operator Comments
ShotTimeTypeStatusComment
111:04:03:190AMTestBad
211:15:16:773AMTestOk
311:29:49:730AMTestOk
412:19:58:090PMTestOk
512:33:19:887PMTestOk
612:40:29:897PMTestOk
703:16:02:793PMTestOkMSE test
803:24:09:057PMTestOkMSE calibration
903:35:33:457PMTestOkMSE calibration
1003:48:42:423PMTestOksame
1103:57:12:793PMTestOksame
1204:08:48:957PMTestOksame
1304:22:37:360PMTestOksame
1404:35:38:737PMTestOksame
1504:49:29:330PMTestOksame
1604:57:31:017PMTestOklast test shot