| Miniproposals |
| Operators | |
| Session leader(s): | |
| Physics operator(s): | Joseph Snipes |
| Engineering operator(s): | Gary Dekow |
| Engineering Operator Run Comment |
| Power System Tests EO: Dekow/Cochran |
| Session Leader Plans |
| Physics Operators Plans |
| Entered: Feb 3 2005 03:07:46:550PM |
| Author: Joseph Snipes |
| Setting up for EF4 power supply tests with double swing under DPCS control. |
| Session Leader Summaries |
| Physics Operator Summaries |
| Entered: Feb 3 2005 04:42:24:350PM |
| Author: Joseph Snipes |
| A very exciting run with a water main failure that automatically turned off the alternator since it lost the main cooling water. Everyone has to hold on until they get home at this point. |
| Session Leader Comments |
| Physics Operator Comments | |||
| Feb 3 2005 04:01:07:083PM | 1050203018 | Joseph Snipes | Setting up for EF4 power supply tests with double swing under DPCS control. Attempted to copy shot 1020531014 for EF4 double swing down to -1260 A and back up to +1000 A. However, the old shot could not be loaded into model due to errors finding some node. Then, it turns out that the present shot has the same EF4 waveform. so I'll just use the shot that is in the model since yesterday. |
| Feb 3 2005 04:07:52:850PM | 1050203018 | Joseph Snipes | Main water failure to MIT campus caused the alternator to spin down automatically. We are stopping the run. |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 4 | 12:26:40:283PM | Test | Ok | EF2U Power System Test |
| 5 | 12:34:30:313PM | Test | Ok | EF2L Power System Test |
| 6 | 12:42:42:080PM | Test | Ok | EFC Power Supply 1 KA Test |
| 7 | 12:53:17:377PM | Test | Ok | EFC Power System 600 V, 1 ka |
| 8 | 01:00:46:390PM | Test | Ok | EFC 800 volt, 1 ka power system test |
| 9 | 02:07:58:690PM | Test | Ok | EF1U Forward Bridge Test |
| 10 | 02:26:43:847PM | Test | Ok | EF1U reverse bridge test |
| 11 | 02:34:39:813PM | Test | Ok | EF1L Forward Bridge Test |
| 12 | 02:46:19:487PM | Test | Ok | EF1L Reverse Bridge Test |
| 13 | 02:57:11:080PM | Test | Ok | EF1U&L commutation Test |
| 14 | 03:06:59:390PM | Test | Ok | OH1 Forward Bridge Test |
| 15 | 03:15:59:860PM | Test | Ok | OH1 reverse bridge test |
| 16 | 03:26:00:157PM | Test | Ok | OH2U Forward Bridge Test |
| 17 | 03:35:48:040PM | Test | Ok | OH2U Reverse Bridge Test |
| 18 | 03:43:46:010PM | Test | Ok | OH2L Forward Bridge Test |