| Tests to determine the pumping speed of the torus pumps.
We will puff different amounts of D2 into the machine. At 100 seconds we will opwn the gate valve and monitor the pressure. From the pressure vs time we will get the pumping speed. |
| Physics Operators Plans |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments |
| Physics Operator Comments | |||
| Jun 1 2005 09:38:09:397AM | 1050531001 | Jim Irby | Loaded 1050526026 into PCS
Enabled seg 02 --- 1 MA, 0.8e20, SNL, fiducial dud --- ratiomatic turned off, gas?, br0 very negative all oh currents off by a few hundred amps compared to 0526026 |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 01:13:33:060PM | Test | Ok | Gas System Test |
| 2 | 01:43:12:807PM | Test | Ok | |
| 3 | 01:56:45:230PM | Test | Ok | |
| 4 | 02:06:54:277PM | Test | Ok | |
| 5 | 02:15:43:167PM | Test | Ok | |
| 6 | 02:24:21:293PM | Test | Ok | |
| 7 | 02:34:22:277PM | Test | Ok | |
| 8 | 02:42:40:777PM | Test | Ok | |
| 9 | 02:52:57:870PM | Test | Ok | |
| 10 | 03:01:17:590PM | Test | Ok | |
| 11 | 03:10:17:230PM | Test | Ok | |