| Miniproposals |
| Operators | |
| Session leader(s): | |
| Physics operator(s): | Jim Irby |
| Engineering operator(s): | |
| Engineering Operator Run Comment |
| Gas System Cycle Test |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments |
| Physics Operator Comments | |||
| Jun 17 2005 11:13:23:010AM | 1050617001 | Jim Irby | PG4 from -0.540 to -0.50 s at 100 volts (15 psi D2 b-top) (Seg 1)
PG3 from 2.000 to 2.10 s at 60 volts (31 psi D2 b-main) (Seg 2) pressure too low, didn't get second pulse |
| Jun 17 2005 01:06:47:323PM | 1050617002 | Jim Irby | PG4 from -0.580 to -0.50 s at 100 volts (15 psi D2 b-top) (Seg 1)
PG3 from 2.000 to 2.10 s at 80 volts (31 psi D2 b-main) (Seg 2) fizzle detector extended to allow the gas puff at 2 s |
| Jun 17 2005 01:43:13:870PM | 1050617006 | Jim Irby | NINJA only with helium
No pumping of helium |
| Jun 17 2005 01:43:41:510PM | 1050617007 | Jim Irby | b-main and b-top only with d2
now it pumps again |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 11:07:41:090AM | Test | Ok | |
| 2 | 11:19:31:620AM | Test | Ok | |
| 3 | 11:32:34:167AM | Test | Ok | |
| 4 | 11:46:25:010AM | Test | Ok | |
| 5 | 11:57:54:510AM | Test | Ok | |
| 6 | 01:30:26:150PM | Test | Ok | |
| 7 | 01:40:50:103PM | Test | Ok | |
| 8 | 01:55:48:637PM | Test | Ok | |
| 9 | 02:05:26:103PM | Test | Ok | |
| 10 | 02:15:51:650PM | Test | Ok | |
| 11 | 02:27:17:150PM | Test | Ok | |
| 12 | 02:39:06:447PM | Test | Ok | |
| 13 | 02:50:03:197PM | Test | Ok | gas test |