Engineering Operator Run Comment
Run canceled. NSTAR Electric request triggered by high demand.

Session Leader Plans

Physics Operators Plans
Entered: Jul 18 2005 04:05:10:580PM
Author: Bill Rowan
Physop Plan 1050719

MP 390 D(He3) Minority Heating Evaluation at 50 MHz (day 2)

SL: Wukitch
PO: Rowan

Overnight ECDC in D2, 2.e-4 torr; Bake at 60 C.

Run begins at 09:00 and ends at 17:00.

Engineering setup as on 1050718029

A-coil configuration: normal [+Dtop -Dbot -Jtop +Jbot] and enabled.

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid disabled (PG1)
leave B-side upper 15 psi He3, disabled (PG2)
fill B-main with 40 psi D2 Hybrid enabled (PG3)

Enable the following: ECE and VUV gate valves, Z-bolo shutters

ICRF Setup: transmitters in run-on at 8:30

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments

Physics Operator Comments
Jul 19 2005 06:28:07:673AMBill Rowan
THE RUN IS CANCELLED AT THE REQUEST OF NSTAR.

Engineering Operator Comments
ShotTimeTypeStatusComment