| Miniproposals |
| Operators | |
| Session leader(s): | |
| Physics operator(s): | |
| Engineering operator(s): | |
| Engineering Operator Run Comment |
| Run canceled. NSTAR Electric request triggered by high demand. |
| Session Leader Plans |
| Physics Operators Plans |
| Entered: Jul 18 2005 04:05:10:580PM |
| Author: Bill Rowan |
| Physop Plan 1050719
MP 390 D(He3) Minority Heating Evaluation at 50 MHz (day 2) SL: Wukitch PO: Rowan Overnight ECDC in D2, 2.e-4 torr; Bake at 60 C. Run begins at 09:00 and ends at 17:00. Engineering setup as on 1050718029 A-coil configuration: normal [+Dtop -Dbot -Jtop +Jbot] and enabled. Gas Setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid disabled (PG1) leave B-side upper 15 psi He3, disabled (PG2) fill B-main with 40 psi D2 Hybrid enabled (PG3) Enable the following: ECE and VUV gate valves, Z-bolo shutters ICRF Setup: transmitters in run-on at 8:30 |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments |
| Physics Operator Comments | |||
| Jul 19 2005 06:28:07:673AM | Bill Rowan |
THE RUN IS CANCELLED AT THE REQUEST OF NSTAR. | |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |