| Entered: Jun 6 2007 11:39:13:030AM |
| Author: Bill Rowan |
| Engineering Setup for Thursday, 7 June 2007; Run 1070607
MP#: 490 "Assessing LHCD in ICRF -Heated L and H-modes" SL: Amanda Hubbard PO: Bill Rowan Engineering Setup ------------------ ECDC overnight in D2, pressure=2e-4 Torr. Rmin/Rdwell/Rmax = 44/45/103 cm. Bake at 60 C. Run begins at 09:00 and ends at 17:00 Power systems as on 1070427008 Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled Gas setup: --------- Fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) pump out NINJA then disable. Enable the following gate valves and shutters, assuming no vacuum problems: ECE, VUV, Z-bolo shutters DNB permissive enabled RF Systems: ---------- LH: Full power ICRF: J-port at 2 MW essential; D and/or E desirable. FMIT#1,2,3,4 in RUN-ON by 08:30 Diagnostics ---------- DNB: 50 kV, 6A by 09:00 Torvac setup ---------- Gate valves open |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments |
| Physics Operator Comments |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |