| Session leader(s): | Steve Wukitch |
| Physics operator(s): | Earl Marmar |
| Engineering operator(s): | Andy Pfeiffer,Bill Byford,Gary Dekow |
| Engineering Operator Run Comment |
| MP390 Evaluation of D(3He) minority heating Session leader: Wukitch, Phy |
| Session Leader Plans |
| Entered: Jun 12 2006 03:13:07:910PM |
| Author: Steve Wukitch |
| Engineering setup for Tuesday 13-June-2006
MP390 Evaluation of D(3He) minority heating Session leader: Wukitch Physics operator: Marmar Overnight ECDC in D2, and bake at 60 C. Run begins at 08:00 and ends at 17:00 Power systems as on 1060505005 (1.0 MA fiducial, 5.4 T, LSN) A-coil configuration: normal [+Dtop -Dbot -Jtop +Jbot] and enabled. Gas Setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar + 2 psi Ne Hybrid DISABLED (PG1) fill B-side upper with 15 psi 3He Hybrid enabled fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) fill NINJA with 12 psi D2 Enabled Enable the following gate valves and shutters, assuming no vacuum problems: ECE, VUV, Z-bolo shutters Important Diagnostics: standard impurity spectroscopy, Mo source monitor, McPherson, He3 monitor ------------------------------------------------------------------------------- ICRF Setup: FMIT#1-4 in run-on by 7:30. ------------------------------------------------------------------------------- Run Plan Start at 8:00 with power system checks to verify bus connections. 1. (5-10 shots) Start a plasma with BT = 5.2 T, Ip = 1 MA, nl = 0.8 e20m^-2 to check the operationality of J antenna. The RF power of J starts at 1 MW. Need to check transmitters behavior, phase control, arc detection, and RF pickup by other diagnostics. 2. (10 shots) Run constant power and compare J ant with D+E antenna (B field at 5.2 T). Run constant RF power, J and D+E at 2-3 MW. 3. (5 shots) Upper single null plasma, H-mode power threshold comparison. (1060601012) 4. (5 shots) Overlay all antennas to obtain total 3 MW RF (vary the power ratio of J and D+E). 5. (3 shots) Vary the antenna phase shot by shot, [0, pi, pi, 0], [0, pi/2, pi, 3/2pi] and [0, -pi/2, pi, -3/2pi], J at 2.5 MW, D+E at 2.5 MW. (B = 5.2 T) 6. (5 shots) He3 puff scan. B field at 5.0 T, Ip = 1.0 MA, nl04=1.0e20 m^-2. Scan He3 puff shot by shot: 60, 80, 100, 120, 140 ms. Adjust field to keep absorption on axis. 7. (5 shots) density scan. Run nl 04 = 0.5, 0.7, .9, 1.1, 1.3 e20 m^-2. Adjusting the He3 puff time to keep nHe3/ne approximately constant. |
| Physics Operators Plans |
| Entered: Jun 13 2006 10:18:23:127AM |
| Author: Earl Marmar |
| loaded from 1060505005
recalculated all magnetics predictors (segments 1,2,3 and 4; only segments 1 and 2 are active for this shot) RCUR offset in segment 1 (middle time) was 1600; reset to 1600 after calling to recalculate (which zeros the offset) |
| Entered: Jun 13 2006 12:07:28:543PM |
| Author: Earl Marmar |
| Engineering setup for Tuesday 13-June-2006
MP390 Evaluation of D(3He) minority heating Session leader: Wukitch Physics operator: Marmar Overnight ECDC in D2, and bake at 60 C. Run begins at 08:00 and ends at 17:00 Power systems as on 1060505005 (NORMAL TF and Ip direction, 1.0 MA fiducial, 5.4 T, LSN) Predictors have to be recalculated because of the loss of the F11 flux loop after May 5. A-coil configuration: normal [+Dtop -Dbot -Jtop +Jbot] and enabled. Gas Setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar + 2 psi Ne Hybrid DISABLED (PG1) fill B-side upper with 15 psi 3He Hybrid enabled (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) fill NINJA with 12 psi D2 Enabled Enable the following gate valves and shutters, assuming no vacuum problems: ECE, VUV, Z-bolo shutters Important Diagnostics: standard impurity spectroscopy, Mo source monitor, McPherson, He3 monitor ------------------------------------------------------------------------------- ICRF Setup: FMIT#1-4 in run-on by 7:30. J-port is tuned to 50 MHz, D&E at ~80 MHz ------------------------------------------------------------------------------- Run Plan |
| Session Leader Summaries |
| Entered: Jun 13 2006 04:58:11:750PM |
| Author: Steve Wukitch |
| Run Summary
We struggled to get J operating. J4 was oscillating initially which was surprising since we measured a clean spectrum last Thursday into load and it operated fine into vacuum. Adjusting the match solution eventually eliminated the problem. We then struggled with E antenna having a power limit around 0.5 MW?!? J antenna operated to 1.5 MW and struggled at higher power. As far as the comparison goes, the radiated power fraction in L-mode for J is about twice D+E. A small He puff scan was performed because we were concerned little He3 was making it into the plasma and we will start with that tomorrow. |
| Physics Operator Summaries |
| Entered: Jun 13 2006 05:36:38:890PM |
| Author: Earl Marmar |
| The machine ran well today. The toroidal field and current were returned to the "normal" direction (clockwise from above), so the first part of the run was devoted to magnet tests, which went smoothly. The first plasma shot went off before 11:30 am. The only startup tweaks were small downward adjustments of BR_0 and a 1 msec reduction in prepuff midway through the run. All shots were 1MA lower single null. The lone fizzle came after a 1 MA disruption - probably should have reduced the prefill puff for the subsequent shot. Many shots had early hard x-rays.
scorecard: tests 14 plasmas 24 fizzles 1 total cycles 39 |
| Session Leader Comments | |||
| Jun 13 2006 11:27:15:730AM | 1060613016 | Steve Wukitch | 015 BT~5.4 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,0.9]sec, digital phase set to 315 or [0,pi,pi,0] result: plasma D: ran E: ran J: max faults phasing is close about 20 deg off next: check match, phasing set to 290 lower BT to 5.2 T |
| Jun 13 2006 11:40:56:737AM | 1060613016 | Steve Wukitch | 016 BT~5.4 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,1.1]sec, digital phase set to 315 or [0,pi,pi,0] result: plasma D: ran E: ran J: max faults - no phase information on that one next: check match, phasing set to 310 attempting to transmit |
| Jun 13 2006 11:54:52:460AM | 1060613017 | Steve Wukitch | 017 BT~5.2 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,1.1]sec, digital phase set to 310 or [0,pi,pi,0] result: plasma D: ran E: ran J: max faults got better information this time next: try new match points need to investigate J4DC0 and J4DC1 |
| Jun 13 2006 12:31:54:037PM | 1060613018 | Steve Wukitch | 018 BT~5.2 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,1.1]sec, digital phase set to 310 or [0,pi,pi,0] result: plasma - little H-mode with D+E D: ran E: ran faults with H-mode J: max faults next: try new match points |
| Jun 13 2006 12:32:13:333PM | 1060613019 | Steve Wukitch | 019 BT~5.2 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,1.1]sec, digital phase set to 310 or [0,pi,pi,0] result: plasma D: ran E: ran J: max faults next: try again |
| Jun 13 2006 12:32:32:053PM | 1060613020 | Steve Wukitch | 020 BT~5.2 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,1.1]sec, digital phase set to 300 or [0,pi,pi,0] result: plasma - little H-mode with D+E D: ran E: ran faults with H-mode J: max faults next: try new match points |
| Jun 13 2006 12:48:58:903PM | 1060613021 | Steve Wukitch | 021 BT~5.2 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,1.1]sec, digital phase set to 300 or [0,pi,pi,0] result: plasma - little H-mode with D+E D: ran E: ran J: max faults next: try new match points |
| Jun 13 2006 01:02:28:190PM | 1060613022 | Steve Wukitch | 022 BT~5.2 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,1.1]sec, digital phase set to 300 or [0,pi,pi,0] result: plasma - little H-mode with D+E D: ran E: ran J: max faults next: try new match points - getting a little frustrating |
| Jun 13 2006 01:12:27:083PM | 1060613023 | Steve Wukitch | 023 BT~5.2 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,1.1]sec, digital phase set to 300 or [0,pi,pi,0] result: plasma - little H-mode with D+E D: ran E: ran J: max faults - J3 ran better next: go back to old match point on J4 |
| Jun 13 2006 01:18:34:773PM | 1060613024 | Steve Wukitch | 024 BT~5.2 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,1.1]sec, digital phase set to 300 or [0,pi,pi,0] result: plasma - little H-mode with D+E D: ran E: ran 1 fault J: max faults - J3 ran, no oscillation on J4 next: nudge matches |
| Jun 13 2006 01:45:48:330PM | 1060613025 | Steve Wukitch | 025 BT~5.2 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,1.1]sec, digital phase set to 300 or [0,pi,pi,0] result: plasma - little H-mode with D+E D: ran E: ran 1 fault J: max faults - J3 ran, no oscillation on J4 next: nudge matches |
| Jun 13 2006 02:10:19:747PM | 1060613026 | Steve Wukitch | 026 BT~5.2 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,1.1]sec, digital phase set to 300 or [0,pi,pi,0] result: plasma - little H-mode with D+E D: ran E: ran J: max faults - J3 ran, no oscillation on J4 next: nudge matches |
| Jun 13 2006 02:10:33:687PM | 1060613027 | Steve Wukitch | 027 BT~5.2 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.5 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.0 MW [0.6,1.1]sec, digital phase set to 300 or [0,pi,pi,0] result: plasma - little H-mode with D+E D: ran E: ran J: ran only transitions are intentional - no oscillation on J4 next: nudge matches |
| Jun 13 2006 02:19:54:063PM | 1060613028 | Steve Wukitch | 028 BT~5.2 T, Ip~1 MA, nl04~0.8, 3He 100 msec puff at 0.2 sec
D: 0.75 MW [1.2,1.5]sec E: 0.75 MW [1.2,1.5]sec J: 1.5 MW [0.6,1.1]sec, digital phase set to 290 or [0,pi,pi,0] result: plasma - early disruption J: ran - next: nudge J4 match and raise target density to 1 |
| Jun 13 2006 02:45:52:480PM | 1060613030 | Steve Wukitch | 030 BT~5.2 T, Ip~1 MA, nl04~1, 3He 100 msec puff at 0.2 sec
D: 0.75 MW [1.2,1.5]sec E: 0.75 MW [1.2,1.5]sec J: 1.5 ramp to 2 MW [0.7,1]sec, digital phase set to 350 or ~[0,pi,pi,0] result: plasma D: ran E: ran multiple faults - not from match hmm J: ran 3 faults next: nudge J4 match |
| Jun 13 2006 03:00:55:860PM | 1060613031 | Steve Wukitch | 031 BT~5.2 T, Ip~1 MA, nl04~1, 3He 100 msec puff at 0.2 sec
D: 0.75 MW [1.2,1.5]sec E: 0.75 MW [1.2,1.5]sec J: 1.5 ramp to 2.5 MW [0.7,1]sec, digital phase set to 10 or ~[0,pi,pi,0] result: plasma D: ran E: ran multiple faults - not from match hmm J: ran 3 faults - screen overload on J3 good phase next: nudge J3 match |
| Jun 13 2006 03:35:08:110PM | 1060613032 | Steve Wukitch | 032 BT~5.2 T, Ip~1 MA, nl04~1, 3He 100 msec puff at 0.2 sec
D: 0.75 MW [1.2,1.5]sec E: 0.75 MW [1.2,1.5]sec J: 1.5 ramp to 2.5 MW [0.7,1]sec, digital phase set to 10 or ~[0,pi,pi,0] result: plasma D: ran E: ran multiple faults - not from match hmm J: ran 5 faults |
| Jun 13 2006 04:08:36:840PM | 1060613033 | Steve Wukitch | 033 BT~5.2 T, Ip~1 MA, nl04~1, 3He 100 msec puff at 0.2 sec
D: 1.1 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.5 ramp to 2.5 MW [0.7,1]sec, digital phase set to 10 or ~[0,pi,pi,0] result: plasma D: ran E: ran J: ran 5 faults note: J heating seems poor next: gas puff to 115 msec |
| Jun 13 2006 04:08:48:357PM | 1060613034 | Steve Wukitch | 034 BT~5.2 T, Ip~1 MA, nl04~1, 3He 115 msec puff at 0.2 sec
D: 1.1 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.5 ramp to 2.5 MW [0.7,1]sec, digital phase set to 10 or ~[0,pi,pi,0] result: plasma D: ran 1 fault E: ran J: ran 5 faults note: J heating still seems poor next: change BT to 5 T |
| Jun 13 2006 04:09:14:887PM | 1060613035 | Steve Wukitch | 035 BT~5.0 T, Ip~1 MA, nl04~1, 3He 115 msec puff at 0.2 sec
D: 1.1 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.5 ramp to 2.5 MW [0.7,1]sec, digital phase set to 10 or ~[0,pi,pi,0] result: plasma D: ran 1 fault E: ran 1 fault J: ran 5 faults note: J heating still seems poor next: change BT to 5.1 T and puff to 70 msec |
| Jun 13 2006 04:25:32:470PM | 1060613036 | Steve Wukitch | 036 BT~5.1 T, Ip~1 MA, nl04~1, 3He 115 msec puff at 0.2 sec
D: 1.1 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.5 ramp to 2.5 MW [0.7,1]sec, digital phase set to 10 or ~[0,pi,pi,0] result: plasma D: ran 1 fault E: ran 9 fault J: ran 3 faults note: big injection at 0.8 sec next: set dig phase to 290deg |
| Jun 13 2006 04:38:57:897PM | 1060613037 | Steve Wukitch | 037 BT~5.1 T, Ip~1 MA, nl04~1, 3He 70 msec puff at 0.2 sec
D: 1.1 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.5 ramp to 2.5 MW [0.7,1]sec, digital phase set to 290 or -90 result: plasma D: ran 1 fault E: ran 9 fault J: ran 5 faults note: heating has not recovered next: set set digital phase to 280deg |
| Jun 13 2006 05:00:41:860PM | 1060613038 | Steve Wukitch | 038 BT~5.1 T, Ip~1 MA, nl04~1, 3He 70 msec puff at 0.2 sec
D: 1.1 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.5 ramp to 2.5 MW [0.7,1]sec, digital phase set to 280 or -90 result: plasma D: ran 1 fault E: ran 9 fault J: ran 5 faults next: set set digital phase to 100 deg |
| Jun 13 2006 05:01:20:250PM | 1060613039 | Steve Wukitch | 039 BT~5.1 T, Ip~1 MA, nl04~1, 3He 70 msec puff at 0.2 sec
D: 1.1 MW [1.2,1.5]sec E: 0.5 MW [1.2,1.5]sec J: 1.5 ramp to 2.5 MW [0.7,1]sec, digital phase set to 100 or 90 result: plasma D: ran 1 fault E: ran 9 fault J: ran CLEAN |
| Physics Operator Comments | |||
| Jun 13 2006 11:25:28:027AM | 1060613015 | Earl Marmar | PG2 (B side upper) helium 3 enabled: programmed to 100 volts from 0.2 to 0.3 seconds
plasma startup looks ok |
| Jun 13 2006 11:50:36:553AM | 1060613016 | Earl Marmar | Toroidal field to 5.2 tesla (from 5.44)
plasma some early hards |
| Jun 13 2006 11:50:59:257AM | 1060613017 | Earl Marmar | remove the helium-3 puff from segment 1 (inherited from the loaded shot)
plasma hards are lower, not gone |
| Jun 13 2006 12:06:15:620PM | 1060613018 | Earl Marmar | enable argon + neon, 40 msec pulse starting at 0.3 seconds
plasma startup beginning to look a bit hesitant early hards again H-mode during second RF pulse (D+E = 1 MW) |
| Jun 13 2006 12:20:56:237PM | 1060613019 | Earl Marmar | BR_0 offset to -0.0005 T from 0.0
plasma hards gone Brian is now probing (1 poke at 0.5 seconds) |
| Jun 13 2006 12:32:07:227PM | 1060613020 | Earl Marmar | B side lower PG1 purged and refilled with 1 psi argon (no neon)
PG1 pulse lengthened to 50 msec (from 40) plasma startup bounced 2 late h-modes |
| Jun 13 2006 12:44:41:810PM | 1060613021 | Earl Marmar | no pcs changes
plasma startup ok, no hards late h-mode |
| Jun 13 2006 12:58:48:813PM | 1060613022 | Earl Marmar | no pcs changes
plasma hards are back late h-modes |
| Jun 13 2006 01:13:03:287PM | 1060613023 | Earl Marmar | no pcs changes
plasma hards late h-modes |
| Jun 13 2006 01:29:22:340PM | 1060613024 | Earl Marmar | no pcs changes
plasma significant hesitation in startup |
| Jun 13 2006 02:04:43:103PM | 1060613025 | Earl Marmar | no pcs changes
plasma |
| Jun 13 2006 02:04:58:057PM | 1060613026 | Earl Marmar | no pcs changes
plasma |
| Jun 13 2006 02:05:20:700PM | 1060613027 | Earl Marmar | no pcs changes
plasma got j3 and j4 this time |
| Jun 13 2006 02:23:12:470PM | 1060613028 | Earl Marmar | BR_0 offset to -0.0007 from -.0005
plasma disrupt at 0.9 seconds (big impurity influx) |
| Jun 13 2006 02:24:10:360PM | 1060613029 | Earl Marmar | raise nl_04 target to 1e20 (from 9e19)
fizzle |
| Jun 13 2006 02:43:10:837PM | 1060613030 | Earl Marmar | reduce prefill puff by 1 msec (now 19 msec)
plasma no hards h-modes from J and D+E |
| Jun 13 2006 02:56:23:827PM | 1060613031 | Earl Marmar | no pcs changes
plasma early hards are back |
| Jun 13 2006 03:27:05:060PM | 1060613032 | Earl Marmar | slight delay for cell entry before this shot
no pcs changes plasma no hards |
| Jun 13 2006 03:36:28:280PM | 1060613033 | Earl Marmar | no pcs changes
plasma |
| Jun 13 2006 03:58:31:070PM | 1060613034 | Earl Marmar | increase helium-3 puff to 115 msec (starting at 0.2 seconds)
plasma h-modes with J and D+E |
| Jun 13 2006 04:10:19:527PM | 1060613035 | Earl Marmar | Toroidal field to 5.0 tesla
plasma |
| Jun 13 2006 04:19:37:657PM | 1060613036 | Earl Marmar | Helium-3 puff width to 70 msec, still starting at 0.2 seconds
toroidal field to 5.1 tesla plasma |
| Jun 13 2006 04:30:25:503PM | 1060613037 | Earl Marmar | no pcs changes
plasma |
| Jun 13 2006 05:03:13:187PM | 1060613038 | Earl Marmar | no pcs changes
plasma |
| Jun 13 2006 05:28:08:887PM | 1060613038 | Earl Marmar | no pcs changes
plasma |
| Jun 13 2006 05:04:02:690PM | 1060613039 | Earl Marmar | helium-3 puff to 200 msec (still starting at 0.2 seconds)
plasma |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 08:03:45:957AM | Test | Ok | EFC 400v 1KA |
| 2 | 08:16:38:150AM | Test | Ok | EF2 Upper 500V 3KA forward |
| 3 | 08:29:09:560AM | Test | Ok | EF2 Lower 500V 3KA Forward |
| 4 | 08:44:02:600AM | Test | Bad | C Coil no current |
| 5 | 09:06:17:513AM | Test | Bad | C Ciol failed to run |
| 6 | 09:17:06:000AM | Test | Ok | EF3 3KV 3KA |
| 7 | 09:36:34:540AM | Test | Ok | EF4 Forward B 1KV 2KA |
| 8 | 09:47:14:467AM | Test | Ok | EF1 upper 500V 2KA |
| 9 | 09:57:53:503AM | Test | Ok | EF1 lower 500V 2KA |
| 10 | 10:10:01:940AM | Test | Ok | OH1 forward 1KV 2KA |
| 11 | 10:20:58:377AM | Test | Ok | OH 2 upper forward 300V 2KA |
| 12 | 10:31:44:663AM | Test | Ok | OH2 lower 300V 2KA |
| 13 | 10:43:53:823AM | Test | Ok | TF 50KA |
| 14 | 10:55:37:343AM | Test | Ok | TF 100KA and gas |
| 15 | 11:08:26:100AM | Plasma | Ok | |
| 16 | 11:26:46:073AM | Plasma | Ok | |
| 17 | 11:41:22:690AM | Plasma | Ok | |
| 18 | 11:53:57:210AM | Plasma | Ok | |
| 19 | 12:06:25:573PM | Plasma | Ok | |
| 20 | 12:19:52:500PM | Plasma | Ok | |
| 21 | 12:33:20:523PM | Plasma | Ok | |
| 22 | 12:47:01:027PM | Plasma | Ok | |
| 23 | 01:00:29:563PM | Plasma | Ok | |
| 24 | 01:13:54:163PM | Plasma | Ok | |
| 25 | 01:28:49:387PM | Plasma | Ok | |
| 26 | 01:42:14:517PM | Plasma | Ok | |
| 27 | 01:55:35:507PM | Plasma | Ok | |
| 28 | 02:09:06:653PM | Plasma | Ok | |
| 29 | 02:22:48:267PM | Plasma | Ok | |
| 30 | 02:36:11:617PM | Plasma | Ok | |
| 31 | 02:48:52:717PM | Plasma | Ok | |
| 32 | 03:22:08:853PM | Plasma | Ok | |
| 33 | 03:34:59:390PM | Plasma | Ok | |
| 34 | 03:48:17:097PM | Plasma | Ok | |
| 35 | 04:01:11:790PM | Plasma | Ok | |
| 36 | 04:13:49:357PM | Plasma | Ok | |
| 37 | 04:26:31:767PM | Plasma | Ok | |
| 38 | 04:39:47:773PM | Plasma | Ok | |
| 39 | 04:53:22:183PM | Plasma | Ok | |