Alcator C-Mod Run 1070226 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):
Engineering operator(s):

Engineering Operator Run Comment
testing data system

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments

Physics Operator Comments

Engineering Operator Comments
ShotTimeTypeStatusComment
102:21:11:990PMTestOk
202:34:38:693PMTestOk

System Availability
Feb 26 2007 02:20:33:913PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDno Feb 05 2007 04:33PM (twf)Joe SnipesActive MHD Antennasears,snipes
ASPnoChanging probe headJan 14 2007 02:28PM (g)Brian LaBombardA-Port Scanning Probelabombard
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno Jan 23 2007 02:23PM (g)Ian HutchinsonBolometershutch,reinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
CXRSno Jan 23 2007 02:23PM (g)Bill RowanCharge Exchange Spectroscopyblip,rachmcd,rowan
Dalsanoawaiting bolometer re-installationJan 16 2007 11:40AM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available until after power testFeb 21 2007 12:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
FSPno Jan 23 2007 02:23PM (g)Brian LaBombardF-Port Scanning Probelabombard
GPCno Jan 23 2007 02:23PM (g)Amanda HubbardECE Polychromaterhubbard
GPC2no Jan 14 2007 01:45PM Amanda HubbardECE Polychromaterhubbard
GPInoNot available 3/1-3/6Jan 23 2007 02:24PM (g)Jim TerryGas Puff Imagingterry,zweben
H/Dno Jan 23 2007 02:25PM (g)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jrno Jan 23 2007 02:24PM (g)John RiceHigh Resolution X-Rayince,rice
HXRno Jan 23 2007 02:24PM (g)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennano80 MHzJan 23 2007 02:24PM (g)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHzJan 23 2007 02:24PM (g)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennano Jan 23 2007 02:25PM (g)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoAvailable after 3/20Jan 23 2007 02:24PM (g)Ron ParkerLower Hybriddterry,parker
LPIno Jan 14 2007 02:03PM Earl MarmarLithium Pellet Injectorbose,marmar
McPhersonno Jan 23 2007 02:24PM (g)Jim TerryVUV Spectrometerreinke,terry
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
Neutronsno Jan 23 2007 02:25PM (g)Catherine FioreNeutron Detectorsfiore
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,porkolab
ReflectometernoAll frequncies (including the 125-140GHz swept upgrade) are scheduled for the start of operationsFeb 07 2007 11:52AM (dominguez)Earl MarmarReflectometerdominguez,marmar
TCInoRmin,Rnl04,Rmax=[60,72,80]Jan 26 2007 05:10PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoSystem dismantled awaiting pumpdownFeb 05 2007 04:43PM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoSystem dismantled awaiting pumpdownFeb 05 2007 04:43PM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
WASPno Jan 23 2007 02:25PM (g)Brian LaBombardInner Wall Probelabombard,nsmick