Alcator C-Mod Run 1070304 Information

Back to runs

Miniproposals

Operators
Session leader(s):
Physics operator(s):
Engineering operator(s):

Engineering Operator Run Comment
Test shot to check the scanner and gas signal modules

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments

Physics Operator Comments

Engineering Operator Comments
ShotTimeTypeStatusComment
109:34:57:707AMTestOkTF scanner and gas signal tests
209:55:38:393AMTestBadTF scanner test

System Availability
Mar 4 2007 09:34:23:923AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDno Feb 05 2007 04:33PM (twf)Joe SnipesActive MHD Antennasears,snipes
ASPnoChanging probe headJan 14 2007 02:28PM (g)Brian LaBombardA-Port Scanning Probelabombard
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno Jan 23 2007 02:23PM (g)Ian HutchinsonBolometershutch,reinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
CXRSno Jan 23 2007 02:23PM (g)Bill RowanCharge Exchange Spectroscopyblip,rachmcd,rowan
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available until after power testFeb 21 2007 12:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
FSPno Jan 23 2007 02:23PM (g)Brian LaBombardF-Port Scanning Probelabombard
GPCno Jan 23 2007 02:23PM (g)Amanda HubbardECE Polychromaterhubbard
GPC2no Jan 14 2007 01:45PM Amanda HubbardECE Polychromaterhubbard
GPInoNot available 3/1-3/6Jan 23 2007 02:24PM (g)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jrno Jan 23 2007 02:24PM (g)John RiceHigh Resolution X-Rayince,rice
HXRno Jan 23 2007 02:24PM (g)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennano80.5 MHz. control/data system upgrade ongoing.Feb 27 2007 03:52PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. control/data system upgrade. FFT installation, etc.Feb 27 2007 03:53PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennanocontrol/data system, crowbar cabinet, frequency tuning from 70 to 78 MHzFeb 27 2007 03:53PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoAvailable after 3/20Jan 23 2007 02:24PM (g)Ron ParkerLower Hybriddterry,parker
LPIno Jan 14 2007 02:03PM Earl MarmarLithium Pellet Injectorbose,marmar
McPhersonno Jan 23 2007 02:24PM (g)Jim TerryVUV Spectrometerreinke,terry
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
Neutronsno Jan 23 2007 02:25PM (g)Catherine FioreNeutron Detectorsfiore
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,porkolab
ReflectometernoAll frequncies (including the 125-140GHz swept upgrade) are scheduled for the start of operationsFeb 07 2007 11:52AM (dominguez)Earl MarmarReflectometerdominguez,marmar
TCInoRmin,Rnl04,Rmax=[60,72,80]Jan 26 2007 05:10PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoSystem dismantled awaiting pumpdownFeb 05 2007 04:43PM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoSystem dismantled awaiting pumpdownFeb 05 2007 04:43PM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
WASPno Jan 23 2007 02:25PM (g)Brian LaBombardInner Wall Probelabombard,nsmick