ShotTimeTypeStatusComment
103:50:00:530PMTestOk
204:05:25:657PMTestOk
304:17:57:077PMTestOk
504:38:04:170PMTestOk
604:52:38:797PMTestOk
705:02:40:890PMTestOk

System Availability
Mar 8 2007 03:49:26:873PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDno Feb 05 2007 04:33PM (twf)Joe SnipesActive MHD Antennasears,snipes
ASPnoChanging probe headJan 14 2007 02:28PM (g)Brian LaBombardA-Port Scanning Probelabombard
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoPreparing external amplifiers and DAQ. Midplane/2-Pi ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:08PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphano Mar 07 2007 11:23AM Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available until after power testFeb 21 2007 12:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
FSPno Jan 23 2007 02:23PM (g)Brian LaBombardF-Port Scanning Probelabombard
GPCno Jan 23 2007 02:23PM (g)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2no Jan 14 2007 01:45PM Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNot available 3/1-3/6Jan 23 2007 02:24PM (g)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRno Jan 23 2007 02:24PM (g)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennano80.5 MHz. control/data system upgrade ongoing.Feb 27 2007 03:52PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. control/data system upgrade. FFT installation, etc.Feb 27 2007 03:53PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennanocontrol/data system, crowbar cabinet, frequency tuning from 70 to 78 MHzFeb 27 2007 03:53PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoAvailable after 3/20Jan 23 2007 02:24PM (g)Ron ParkerLower Hybriddterry,parker
LPIno Jan 14 2007 02:03PM Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:09PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonno Jan 23 2007 02:24PM (g)Jim TerryVUV Spectrometerreinke,terry
Michelsonno Mar 06 2007 10:57AM Amanda HubbardECE Te Profileshubbard,schmidt
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoCalibrated detectors are not yet positioned correctlyMar 06 2007 03:40PM (fiore)Catherine FioreNeutron Detectorsfiore
NINJAno Mar 07 2007 11:29AM Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,porkolab
Plasma TVno Mar 07 2007 11:28AM Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
TCInoRmin,Rnl04,Rmax=[60,72,80]Jan 26 2007 05:10PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
WASPnoNot yet debuggedMar 05 2007 05:44PM (nsmick)Brian LaBombardInner Wall Probelabombard,nsmick


Mar 8 2007 04:04:55:983PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDno Feb 05 2007 04:33PM (twf)Joe SnipesActive MHD Antennasears,snipes
ASPnoChanging probe headJan 14 2007 02:28PM (g)Brian LaBombardA-Port Scanning Probelabombard
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoPreparing external amplifiers and DAQ. Midplane/2-Pi ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:08PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphano Mar 07 2007 11:23AM Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available until after power testFeb 21 2007 12:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
FSPno Jan 23 2007 02:23PM (g)Brian LaBombardF-Port Scanning Probelabombard
GPCno Jan 23 2007 02:23PM (g)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2no Jan 14 2007 01:45PM Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNot available 3/1-3/6Jan 23 2007 02:24PM (g)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRno Jan 23 2007 02:24PM (g)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennano80.5 MHz. control/data system upgrade ongoing.Feb 27 2007 03:52PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. control/data system upgrade. FFT installation, etc.Feb 27 2007 03:53PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennanocontrol/data system, crowbar cabinet, frequency tuning from 70 to 78 MHzFeb 27 2007 03:53PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoAvailable after 3/20Jan 23 2007 02:24PM (g)Ron ParkerLower Hybriddterry,parker
LPIno Jan 14 2007 02:03PM Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:09PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonno Jan 23 2007 02:24PM (g)Jim TerryVUV Spectrometerreinke,terry
Michelsonno Mar 06 2007 10:57AM Amanda HubbardECE Te Profileshubbard,schmidt
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoCalibrated detectors are not yet positioned correctlyMar 06 2007 03:40PM (fiore)Catherine FioreNeutron Detectorsfiore
NINJAno Mar 07 2007 11:29AM Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,porkolab
Plasma TVno Mar 07 2007 11:28AM Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
TCInoRmin,Rnl04,Rmax=[60,72,80]Jan 26 2007 05:10PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
WASPnoNot yet debuggedMar 05 2007 05:44PM (nsmick)Brian LaBombardInner Wall Probelabombard,nsmick


Mar 8 2007 04:17:21:797PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDno Feb 05 2007 04:33PM (twf)Joe SnipesActive MHD Antennasears,snipes
ASPnoChanging probe headJan 14 2007 02:28PM (g)Brian LaBombardA-Port Scanning Probelabombard
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoPreparing external amplifiers and DAQ. Midplane/2-Pi ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:08PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphano Mar 07 2007 11:23AM Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available until after power testFeb 21 2007 12:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
FSPno Jan 23 2007 02:23PM (g)Brian LaBombardF-Port Scanning Probelabombard
GPCno Jan 23 2007 02:23PM (g)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2no Jan 14 2007 01:45PM Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNot available 3/1-3/6Jan 23 2007 02:24PM (g)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRno Jan 23 2007 02:24PM (g)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennano80.5 MHz. control/data system upgrade ongoing.Feb 27 2007 03:52PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. control/data system upgrade. FFT installation, etc.Feb 27 2007 03:53PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennanocontrol/data system, crowbar cabinet, frequency tuning from 70 to 78 MHzFeb 27 2007 03:53PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoAvailable after 3/20Jan 23 2007 02:24PM (g)Ron ParkerLower Hybriddterry,parker
LPIno Jan 14 2007 02:03PM Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:09PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonno Jan 23 2007 02:24PM (g)Jim TerryVUV Spectrometerreinke,terry
Michelsonno Mar 06 2007 10:57AM Amanda HubbardECE Te Profileshubbard,schmidt
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoCalibrated detectors are not yet positioned correctlyMar 06 2007 03:40PM (fiore)Catherine FioreNeutron Detectorsfiore
NINJAno Mar 07 2007 11:29AM Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,porkolab
Plasma TVno Mar 07 2007 11:28AM Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
TCInoRmin,Rnl04,Rmax=[60,72,80]Jan 26 2007 05:10PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
WASPnoNot yet debuggedMar 05 2007 05:44PM (nsmick)Brian LaBombardInner Wall Probelabombard,nsmick


Mar 8 2007 04:37:31:157PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDno Feb 05 2007 04:33PM (twf)Joe SnipesActive MHD Antennasears,snipes
ASPnoChanging probe headJan 14 2007 02:28PM (g)Brian LaBombardA-Port Scanning Probelabombard
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoPreparing external amplifiers and DAQ. Midplane/2-Pi ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:08PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphano Mar 07 2007 11:23AM Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available until after power testFeb 21 2007 12:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
FSPno Jan 23 2007 02:23PM (g)Brian LaBombardF-Port Scanning Probelabombard
GPCno Jan 23 2007 02:23PM (g)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2no Jan 14 2007 01:45PM Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNot available 3/1-3/6Jan 23 2007 02:24PM (g)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRno Jan 23 2007 02:24PM (g)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennano80.5 MHz. control/data system upgrade ongoing.Feb 27 2007 03:52PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. control/data system upgrade. FFT installation, etc.Feb 27 2007 03:53PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennanocontrol/data system, crowbar cabinet, frequency tuning from 70 to 78 MHzFeb 27 2007 03:53PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoAvailable after 3/20Jan 23 2007 02:24PM (g)Ron ParkerLower Hybriddterry,parker
LPIno Jan 14 2007 02:03PM Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:09PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonno Jan 23 2007 02:24PM (g)Jim TerryVUV Spectrometerreinke,terry
Michelsonno Mar 06 2007 10:57AM Amanda HubbardECE Te Profileshubbard,schmidt
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoCalibrated detectors are not yet positioned correctlyMar 06 2007 03:40PM (fiore)Catherine FioreNeutron Detectorsfiore
NINJAno Mar 07 2007 11:29AM Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,porkolab
Plasma TVno Mar 07 2007 11:28AM Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
TCInoRmin,Rnl04,Rmax=[60,72,80]Jan 26 2007 05:10PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
WASPnoNot yet debuggedMar 05 2007 05:44PM (nsmick)Brian LaBombardInner Wall Probelabombard,nsmick


Mar 8 2007 04:52:06:953PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDno Feb 05 2007 04:33PM (twf)Joe SnipesActive MHD Antennasears,snipes
ASPnoChanging probe headJan 14 2007 02:28PM (g)Brian LaBombardA-Port Scanning Probelabombard
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoPreparing external amplifiers and DAQ. Midplane/2-Pi ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:08PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphano Mar 07 2007 11:23AM Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available until after power testFeb 21 2007 12:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
FSPno Jan 23 2007 02:23PM (g)Brian LaBombardF-Port Scanning Probelabombard
GPCno Jan 23 2007 02:23PM (g)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2no Jan 14 2007 01:45PM Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNot available 3/1-3/6Jan 23 2007 02:24PM (g)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRno Jan 23 2007 02:24PM (g)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennano80.5 MHz. control/data system upgrade ongoing.Feb 27 2007 03:52PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. control/data system upgrade. FFT installation, etc.Feb 27 2007 03:53PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennanocontrol/data system, crowbar cabinet, frequency tuning from 70 to 78 MHzFeb 27 2007 03:53PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoAvailable after 3/20Jan 23 2007 02:24PM (g)Ron ParkerLower Hybriddterry,parker
LPIno Jan 14 2007 02:03PM Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:09PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonno Jan 23 2007 02:24PM (g)Jim TerryVUV Spectrometerreinke,terry
Michelsonno Mar 06 2007 10:57AM Amanda HubbardECE Te Profileshubbard,schmidt
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoCalibrated detectors are not yet positioned correctlyMar 06 2007 03:40PM (fiore)Catherine FioreNeutron Detectorsfiore
NINJAno Mar 07 2007 11:29AM Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,porkolab
Plasma TVno Mar 07 2007 11:28AM Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
TCInoRmin,Rnl04,Rmax=[60,72,80]Jan 26 2007 05:10PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
WASPnoNot yet debuggedMar 05 2007 05:44PM (nsmick)Brian LaBombardInner Wall Probelabombard,nsmick


Mar 8 2007 05:02:09:500PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDno Feb 05 2007 04:33PM (twf)Joe SnipesActive MHD Antennasears,snipes
ASPnoChanging probe headJan 14 2007 02:28PM (g)Brian LaBombardA-Port Scanning Probelabombard
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoPreparing external amplifiers and DAQ. Midplane/2-Pi ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:08PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphano Mar 07 2007 11:23AM Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available until after power testFeb 21 2007 12:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
FSPno Jan 23 2007 02:23PM (g)Brian LaBombardF-Port Scanning Probelabombard
GPCno Jan 23 2007 02:23PM (g)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2no Jan 14 2007 01:45PM Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNot available 3/1-3/6Jan 23 2007 02:24PM (g)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRno Jan 23 2007 02:24PM (g)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennano80.5 MHz. control/data system upgrade ongoing.Feb 27 2007 03:52PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. control/data system upgrade. FFT installation, etc.Feb 27 2007 03:53PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennanocontrol/data system, crowbar cabinet, frequency tuning from 70 to 78 MHzFeb 27 2007 03:53PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoAvailable after 3/20Jan 23 2007 02:24PM (g)Ron ParkerLower Hybriddterry,parker
LPIno Jan 14 2007 02:03PM Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:09PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonno Jan 23 2007 02:24PM (g)Jim TerryVUV Spectrometerreinke,terry
Michelsonno Mar 06 2007 10:57AM Amanda HubbardECE Te Profileshubbard,schmidt
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsnoCalibrated detectors are not yet positioned correctlyMar 06 2007 03:40PM (fiore)Catherine FioreNeutron Detectorsfiore
NINJAno Mar 07 2007 11:29AM Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,porkolab
Plasma TVno Mar 07 2007 11:28AM Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
TCInoRmin,Rnl04,Rmax=[60,72,80]Jan 26 2007 05:10PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
WASPnoNot yet debuggedMar 05 2007 05:44PM (nsmick)Brian LaBombardInner Wall Probelabombard,nsmick