Engineering Operator Run Comment
Power Supply Test Con't, MP465, MP298A

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments

Physics Operator Comments
Mar 15 2007 03:35:52:960PM1070315020Ian HutchinsonLoad from 1051031011. It does not have a DPCS setup using prior.
Tweaked around the fizzle stuff prior to this.

Looks ok. Load into model.
This is supposed to be EF4 double swing test.
Mar 15 2007 05:00:24:013PM1070315025Ian HutchinsonLoad from shot 1060613015
Decrease IP to 0.6MA
Decrease nl04 to 6e19.
Load. Try for all systems.
Mar 15 2007 05:06:53:390PM1070315025Ian HutchinsonNever got this shot because of a breaker problem.

Engineering Operator Comments
ShotTimeTypeStatusComment
110:51:48:927AMTestOkC. Coil Power Supply
211:06:44:737AMTestOkEF3 Power Supply
311:22:29:847AMTestBadEF4 Forward Bridge Test
411:56:58:050AMTestBadEF4 Forward Bridge
512:27:08:677PMTestOk
612:41:39:707PMTestOkEF4 Reverse Bridge Test
712:53:45:630PMTestOkEF1U Forward Bridge
801:08:19:393PMTestOkEF1U Reverse Bridge
901:18:04:207PMTestOkEF1L Forward Bridge
1001:28:16:380PMTestOkEF1L Reverse Bridge
1101:40:58:487PMTestOkOH1 Forward Bridge
1201:52:13:550PMTestOkOH1 Reverse Bridge
1302:04:43:487PMTestOkOH2U Forward Bridge
1402:16:57:847PMTestOkOH2U Reverse Bridge
1502:27:32:097PMTestOkOH2L Forward Bridge
1602:38:19:893PMTestOkOH2L Reverse Bridge
1702:48:15:503PMTestBad OH Commutation Test
1803:08:55:817PMTestOkOH Commutation Test
1903:26:04:723PMTestOkEF1 Commutation Test
2003:41:10:913PMTestOkEF4 Double Swing Test
2103:52:52:497PMTestOkTF 50kA Test
2204:10:07:953PMTestOkTF 100kA Test
2304:21:39:733PMTestOkTF 150kA Test
2404:44:32:827PMTestOkTF 150kA Test

System Availability
Mar 15 2007 10:51:19:050AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDno Feb 05 2007 04:33PM (twf)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoPreparing external amplifiers and DAQ. Midplane/2-Pi ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:08PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available until after power testFeb 21 2007 12:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Jan 23 2007 02:23PM (g)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2no Jan 14 2007 01:45PM Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNot available 3/1-3/6Jan 23 2007 02:24PM (g)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRno Jan 23 2007 02:24PM (g)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennano80.5 MHz. control/data system upgrade ongoing.Feb 27 2007 03:52PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. control/data system upgrade. FFT installation, etc.Feb 27 2007 03:53PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennanocontrol/data system, crowbar cabinet, frequency tuning from 70 to 78 MHzFeb 27 2007 03:53PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoAvailable after 3/20Jan 23 2007 02:24PM (g)Ron ParkerLower Hybriddterry,parker
LPIno Jan 14 2007 02:03PM Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:09PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnowill check out system on shots with plasmaMar 11 2007 10:36PM (terry)Jim TerryVUV Spectrometerreinke,terry
MichelsonyesShould be operational from 3/15. Reduced speed.Mar 15 2007 08:37AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsnoReady to go when bolo CAMAC crate is brought on lineMar 13 2007 08:45AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged.Mar 12 2007 10:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1 and DIV (without an ND filter) are almost ready; cell access of a few hrs is needed. WIDE2 awaits completion of new camera holder; it should be available after 3/13/2007. Other views will be brought up as cell access permits.Mar 11 2007 10:35PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeterno Mar 11 2007 12:07PM Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoPerpendicular Mach probe head is installed. The turbopump system for head change-out is not yet installedMar 13 2007 09:44PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs are installed and check out electrically. We will power them up during magnet tests for mechanical checkout...Mar 13 2007 09:57PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes


Mar 15 2007 11:06:18:347AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDno Feb 05 2007 04:33PM (twf)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoPreparing external amplifiers and DAQ. Midplane/2-Pi ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:08PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available until after power testFeb 21 2007 12:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCno Jan 23 2007 02:23PM (g)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2no Jan 14 2007 01:45PM Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNot available 3/1-3/6Jan 23 2007 02:24PM (g)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRno Jan 23 2007 02:24PM (g)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennano80.5 MHz. control/data system upgrade ongoing.Feb 27 2007 03:52PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. control/data system upgrade. FFT installation, etc.Feb 27 2007 03:53PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennanocontrol/data system, crowbar cabinet, frequency tuning from 70 to 78 MHzFeb 27 2007 03:53PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoAvailable after 3/20Jan 23 2007 02:24PM (g)Ron ParkerLower Hybriddterry,parker
LPIno Jan 14 2007 02:03PM Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:09PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnowill check out system on shots with plasmaMar 11 2007 10:36PM (terry)Jim TerryVUV Spectrometerreinke,terry
MichelsonyesShould be operational from 3/15. Reduced speed.Mar 15 2007 08:37AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesIn theory ready to goMar 15 2007 10:59AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged.Mar 12 2007 10:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1 and DIV (without an ND filter) are almost ready; cell access of a few hrs is needed. WIDE2 awaits completion of new camera holder; it should be available after 3/13/2007. Other views will be brought up as cell access permits.Mar 11 2007 10:35PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPnoPerpendicular Mach probe head is installed. The turbopump system for head change-out is not yet installedMar 13 2007 09:44PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs are installed and check out electrically. We will power them up during magnet tests for mechanical checkout...Mar 13 2007 09:57PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes