Alcator C-Mod Run 1070316 Information

Back to runs

Miniproposals
Miniproposal:298a
Date Filed: 5/20/2002
Title:C-Mod Plasma Startup
First Author:Jim Irby
Session Leader:Steve Wolfe (shots 1-3)

Operators
Session leader(s):Steve Wolfe
Physics operator(s):Ron Parker
Engineering operator(s):Andy Pfeiffer

Engineering Operator Run Comment
MP298a C-Mod Startup SL: Wolfe PO: parker Magnetics guru: granetz

Session Leader Plans
Entered: Mar 15 2007 06:57:58:983PM
Author: Steve Wolfe
Session Leader plan for Friday, March 16,2007

MP298a C-Mod Startup
SL: wolfe
PO: parker
Magnetics guru: granetz

On Thursday we got through all the power system tests
but did not get to try for plasma for the last shot because
the PF breaker would not close. This is expected to be replaced
before we start on Friday.

Numerous flux loops on the same connector (B-bottom#1) 
were observed to be intermittent or bad during the tests on Thursday.
Of particular concern is f23, which actually gave the wrong
polarity on the TF tests, and f19, which shorted or opened 
during several pulses. Also having shown intermittent problems 
on Tuesday and Thursday were f01, f21, and probably f25. All of these
are on the same feedthrough. On several shots f01 and f21 were actually 
showing zero signal (bit noise). 

Either prior to the run or after the first shot, Bob will try
removing and replacing the air-side connector on this feedthrough.
If this fixes the problem, we will proceed with a normal first day 
of plasma ops, with the main goal of getting plasmas and beginning
cleanup. If one of these flux loops remains bad, we will need to 
modify a lot of control software to accommodate it. 

Ian has pointed 
out that we can reduce the weight of any signal to zero (or negligible) 
in the fluxihh routines by making a new IAN tree using a routine
derived from /home/hutch/idld/wtdfil.pro , and we can modify the 
routine ianup (in /usr/local/cmod/codes/pcs/user_algs/contihh/) to call
a different tree number (presently using IAN_001). This is preferable to
trying to generate a synthetic value for a missing loop in magrawmesh, 
especially for loops that do not have a true synthesis out of other
signals, including f23 and f19. Note that the Pcs directories are under 
CVS now, so in principle all software damage is reversible.  

In addition to the fluxihh predictors, we would need to change recon_vac and
filament predictors. The filament predictor (ZCUR) just requires turning off
the relavant input nodes. The RECON_VAC will need a new MHD_STATIC tree,
created using fix_recon_vac.pro. I'll need to consult my notes from May 19,
the last time we had to do this. I estimate that replacing and
testing software would take several hours. 

If more than one loop remains bad, then we should probably get ready
to break vacuum and repair the inner (vacuum-side) connector. 

Assuming we overcome the flux loop problems, we will be carrying out 
a program similar to that outlined in the PO_PLAN for 1070312:

Load from 1060613015 (first shot after last field reversal to normal
direction, LSN, 5.4T). Probably get a dpcs config warning - verify dpcs_fizzle
source shot for normal current direction (1060308026).

Reduce Ip from 1MA to 800kA, change NL04 from 9e19 to 6e19.
TCI seemed to be working during the tests; we assume it will work for plasma.
If TCI not working, then turn off NL04 feedback and set
Segment 2 pre-programmed PG3 to zero volts, after an initial puff.

Tune startup as required, try for plasma shots to clean up machine. Consider
lower Ip target (600kA) depending on results. Tuning is not going to be
helped by the fact that we have not yet figured out how to fix MFLUX if
we are actually forced to lose a flux loop.  

If we actually get plasmas, one thing to monitor carefully is the f11 loop,
which appeared to have a real in-vessel failure in May-June last year,
but then recovered and has not appeared to have a problem during tests 
so far. If we can recover this loop, then we should. Even if we can't,
we should consider the option of making a new ian_tree for this case as
well. 

Physics Operators Plans
Entered: Mar 15 2007 06:47:59:653PM
Author: Ron Parker
MP298a C-Mod Startup

Run begins at 9:00 and ends at 17:00

Expect some delay in AM due to EF breaker replacement

Also, condition of magnetic pickups will be assessed -- may require longer term maintenance.

The main purpose of this run is to develop startup plasmas to initiate the new run campaign.

Gas Setup:
----------

fill B-top 6psi D2 Hybrid Enabled(PG4)
fill B-side lower 1 psi Argon Hybrid Disabled (PG1)
fill B-side Upper as is, Hybrid Disabled (PG2)
fill B-main 40psi D2 Hybrid Enabled(PG3)
NINJA pumped out, Disabled

The following engineering setup should be used:
********************************************************************
Power Systems as on 1060613015
Acoil Configuration +Dtop -Dbot -Jtop +Jbot, Enabled
Check on TF invert time relative to back-porch programming (see Irby)

Gas setup as above, except ENABLE B-top and B-main.

TORVAC: Pumping Gate valves open

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, Z-bolo, VUV


ICRF setup: None
********************************************************************


Physop plan for MP#298a:
------------------------
Load from 1060613015 (first shot after last field reversal to normal
direction, LSN, 5.4T). Probably get a dpcs config warning - verify dpcs_fizzle
source shot for normal current direction (1060308026).

Reduce Ip from 1MA to 800kA, change NL04 from 9e19 to 6e19 (assuming TCI is
working); if TCI not working, then turn off NL04 feedback and set
Segment 2 pre-programmed PG3 to zero volts, after an initial puff.

Tune startup as required, try for plasma shots to clean up machine. Consider
lower Ip target (600kA) depending on results.

Session Leader Summaries
Entered: Mar 16 2007 01:12:21:840PM
Author: Steve Wolfe
Session Leader summary for Friday, Mar 16, 2007
MP#298a "C-Mod Startup"
SL: wolfe
PO: Parker
EO: Pfeiffer

The goal was to get plasmas. We got a breakdown flash on shot#1,
then ran into a new problem as well as some previously existing 
ones, and shut down after two more test shots. I suppose the run
was a partial success. 

Prior to the run (this morning and last night), the PF breaker
responsible for ending yesterday's run was replaced, and Bob
Granetz removed the air-side connector on the B-bottom feedthrough
that has the intermittant flux loops on it. He verified that
f19 and f23 have shorts to the vessel and the other 8 loops do
not. He then replaced the connector. The access control programming
that caused a breach on opening the big door to the cell under
controlled access was not fixed, limiting cell access to the 
lower doorway. 

Shot#1 was a full-up plasma attempt, based on 1060613015, modified
as noted in the SL_PLAN and PO_PLAN. This resulted in a fizzle
with good early breakdown, but no current pickup. The apparent
flux plots were horrible, and at least two flux loops, F19 full loop 
and F15 partial, were clearly bad, not coming back to zero after the 
shot and having the wrong magnitude. 

We also encountered a problem with the RSVIEW/PLC programming for the
OH2 supplies. The delay on the fizzle detector turns out not to have
been implemented for the OH2's, although it is there and functional 
for the TF and OH1. On the OH2 screen the box to enter the delay
is there, but it doesn't connect to any PLC logic. Yuri and Joe will need
some time to re-implement this feature. Because we rely on this
delay to force the oh's to reverse swing in order to keep the oh coax 
resistance down we will not attempt any more plasma shots until this
programming is done and tested. 

We ran two additional test shots in order to check the magnetics.
Shot#2 was a 10kA oh1 PLC test, and on this shot f25 and f21 were broken, 
and f15 and f19 looked ok (note that f15 is on a different connector). 
Shot#3 was a 100kA TF PLC test, and on this shot F21 was completely dead 
(bit noise) but f19 looked ok, and the other loops also looked ok. In 
particular, F23 which had reverse polarity on yesterday's TF tests looked
normal. 

We are debating whether we should break vacuum in order to attempt a repair
of the magnetics connector on the vacuum-side of B-bottom #1 feedthrough. 
Aside from the loss of time, the problem is that we aren't sure how to 
effect a reliable repair, and also don't know how to verify any repair without
closing up and trying to run again. Note that after shot#3 on which f21 was
either open or closed throughout the shot, Bob measured it as being continuous 
back to the patch panel, and not shorted to the machine. There is also
a risk of damaging other magnetics signals in the course of accessing this
connector. The alternative is to continue next week in the hope that
additional shots will reseat the connectors in a more robust state. While
this sounds like it would be a violation of Second Law, it has happened 
before. So far f11 has not had a problem this year (or for the last weeks 
of operation last year). 


Physics Operator Summaries
Entered: Mar 16 2007 12:06:57:200PM
Author: Ron Parker
Run aborted after first shot, which did in fact breakdown.

Two problems: Fizzle detector not driving OH 2 into reverse swing. This is a software problem that needs some time to repair. Run aborted due to the time this will take.
Second problem: Several flux loops flakey. This makes t~ 0 flux plots unreliable.
Not clear if this can be fixed without opening.

Session Leader Comments
Mar 16 2007 08:13:52:797AMSteve Wolfe
Note to physop:
Irby says not to bother with backporch on the TF unless we
see something on the scanner data, which looked good during
TF tests yesterday. Therefore, the timings from the 1060613015
engineering setup (no backporch, f.d=[.08,1.8],tf invert=1.6) 
are acceptable. 

Mar 16 2007 09:08:38:750AMSteve Wolfe
Bob reports that he did in fact remove and replace the air-side
connector last night after the run. That is probably the best we 
can do without a vacuum break, unless we can find a problem back 
at the rack (unlikely). 

We'll see. JT is arranging for some camera views. We should have
wide1 but not wide2 today. 

Mar 16 2007 09:45:13:953AM1070316001Steve Wolfe
Shot#1: The bigboard display is not showing the toroidal field.
I don't remember if it did yesterday or not.


Mar 16 2007 10:02:47:527AM1070316001Steve Wolfe
Shot#1: Plasma attempt. Got a flash!
Null looks terrible. f19 is clearly bad. 
f15 partial also didn't come back to zero.
Did not get double swing on the oh2's; 
demand is there, and the fizz delay is supposedly 
at 500 on them as well as the oh1, which did swing.


Mar 16 2007 10:25:08:827AM1070316001Steve Wolfe
For Shot#2: We will run an oh2u/l test under hybrid control
PLC limits will be +/- 12kA, we draw +/- 10kA on the avg oh2 
current. Gains on zcur and rcur to zero, 
P gain extended to 2sec on OH2 and Br0

There will be a brief cell access for Ron to check the 
port heaters on the bottom, and Bob is going to check
on the rogowski signal. We had a small leak because the 
vessel got over-cooled. 

Yuri is investigating the PLC code on the fizzle delay for the 
OH2's. 



Mar 16 2007 11:21:20:670AM1070316001Steve Wolfe
Shot#2: Change of plans. Yuri has found that the fizzle delay 
code is missing from the OH2 PLC/RSView program. It will not
be fixed today. 

We will have a 10kA PLC test to check the current state of the 
magnetics. Then we will probably do a 100kA TF test, and then
depending on results, we will shut it down for the day.


Mar 16 2007 11:26:19:967AM1070316001Steve Wolfe
I have saved the test shot that Ron and I prepared for
the oh2's as 1070316666 in /home/wolfe/pcs_scratch

We may use it next week when we test the f.d. 

Mar 16 2007 11:42:43:950AM1070316002Steve Wolfe
Shot#2: Change of plans. Yuri has found that the fizzle delay 
code is missing from the OH2 PLC/RSView program. It will not
be fixed today. 

We will have a 10kA PLC test to check the current state of the 
magnetics. Then we will probably do a 100kA TF test, and then
depending on results, we will shut it down for the day.

Note that the shot programming for the oh2 double swing test
will be in this pulse file, as well as my pcs_scratch dir. 

This time, f25 is broken! f19 looks ok. So does f15. 
F21 has a jump;

Mar 16 2007 11:57:53:793AM1070316003Steve Wolfe
Shot#3: 100kA TF test. 
This time f21 is zero, but f23 is normal polarity
and f19 is ok again. 

Physics Operator Comments
Mar 16 2007 09:02:33:970AM1070316001Ron ParkerMachine ready at 9:00. JT requires access, short delay.
Mar 16 2007 09:21:42:873AM1070316001Ron ParkerFlash! Probably downhill from here.
Mar 16 2007 09:41:28:437AM1070316001Ron ParkerOH 2 did not double swing as it should have. Delay while this is troubleshot.

Also, calculated field null is not consistent with the fact that it broke down.
Mar 16 2007 11:20:43:293AM1070316001Ron ParkerThe software problem causing the failed double swing has been found, but will take a while to fix. Our plan is to do some magnetics tests, after which we'll scrub the run. Happy shoveling.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:17:43:920AMPlasmaOk
211:37:07:230AMTestOkoh1 10Ka magntest
311:52:29:217AMTestOkTF 100KA magnetics

System Availability
Mar 16 2007 09:17:08:873AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDno Feb 05 2007 04:33PM (twf)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoPreparing external amplifiers and DAQ. Midplane/2-Pi ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:08PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available until after power testFeb 21 2007 12:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCnoChs 1-8 installed and on for preamp tests, but final WGs not connected. Expected by 3/20.Mar 16 2007 08:33AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesGPC2 cold and on as of 3/16, hopefully workingMar 16 2007 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNot available 3/1-3/6Jan 23 2007 02:24PM (g)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRno Jan 23 2007 02:24PM (g)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennano80.5 MHz. control/data system upgrade ongoing.Feb 27 2007 03:52PM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. control/data system upgrade. FFT installation, etc.Feb 27 2007 03:53PM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennanocontrol/data system, crowbar cabinet, frequency tuning from 70 to 78 MHzFeb 27 2007 03:53PM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoAvailable after 3/20Jan 23 2007 02:24PM (g)Ron ParkerLower Hybriddterry,parker
LPIno Jan 14 2007 02:03PM Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:09PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnowill check out system on shots with plasmaMar 11 2007 10:36PM (terry)Jim TerryVUV Spectrometerreinke,terry
MichelsonyesShould be operational from 3/15. Reduced speed.Mar 15 2007 08:37AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesIn theory ready to goMar 15 2007 10:59AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged.Mar 12 2007 10:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVnoWIDE1 and DIV (without an ND filter) are almost ready; cell access of a few hrs is needed. WIDE2 awaits completion of new camera holder; it should be available after 3/13/2007. Other views will be brought up as cell access permits.Mar 11 2007 10:35PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes


Mar 16 2007 11:36:32:420AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDno Feb 05 2007 04:33PM (twf)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
BolometersnoPreparing external amplifiers and DAQ. Midplane/2-Pi ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:08PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available until after power testFeb 21 2007 12:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCnoChs 1-8 installed and on for preamp tests, but final WGs not connected. Expected by 3/20.Mar 16 2007 08:33AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesGPC2 cold and on as of 3/16, hopefully workingMar 16 2007 08:32AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPInoNot available 3/1-3/6Jan 23 2007 02:24PM (g)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRno Jan 23 2007 02:24PM (g)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennano80.5 MHz. coaxial line needs more work. more hi-yard workMar 16 2007 09:32AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoAvailable after 3/20Jan 23 2007 02:24PM (g)Ron ParkerLower Hybriddterry,parker
LPIno Jan 14 2007 02:03PM Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs.Mar 06 2007 01:09PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnowill check out system on shots with plasmaMar 11 2007 10:36PM (terry)Jim TerryVUV Spectrometerreinke,terry
MichelsonyesShould be operational from 3/15. Reduced speed.Mar 15 2007 08:37AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesIn theory ready to goMar 15 2007 10:59AM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged.Mar 12 2007 10:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, DANT are operational; JANT and DIV (without an ND filter) are being debugged. WIDE2 has not yet been inserted into its re-entrant tube.Mar 16 2007 09:38AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoSystem being re-assembledMar 06 2007 08:55AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes