| Session Leader Comments |
| Mar 22 2007 09:24:42:527AM | 1070322001 | Steve Wolfe |
Shot#1: Plasma full length, very nice startup
but f01 is reporting 20mV offset, along with f11; that's bad.
Nl04 is flat at 6.3e19, no pg3 puff yet.
|
| Mar 22 2007 09:37:05:573AM | 1070322002 | Steve Wolfe |
Shot#2: Another plasma, a few runaways
EFIT shows larger than normal chisq (~2) on flux24 (F25)
and flux_09 (F10), along with flux_17 (F18) which is normally
high. No sign of baseline offsets on the raw signals.
Mflux plots look normal.
|
| Mar 22 2007 09:50:07:963AM | 1070322003 | Steve Wolfe |
Shot#3: Three in a row - a new record (this year)
Hards are getting worse; small bounce.
GPC2 now working, GPC1 otl.
Vloop just over 1V. NL04=6.2e19, no pg3 in flattop.
|
| Mar 22 2007 10:01:13:713AM | 1070322004 | Steve Wolfe |
Shot#4: Plasma, Ian is getting bored;
Hards down by factor of ten
EFIT now shows chisq high on flux_21 (F22)
flux_24(F25) and flux_09 (F10), in addition
to flux_17.
NL04=6.4e19, but got a little bit of pg3 feedback
at .3 to .4 sec, couple of little blips later.
|
| Mar 22 2007 10:17:33:400AM | 1070322005 | Steve Wolfe |
Shot#5: Plasma. Lots of runaway.
Another delayed trig on bolos and neuts/hards
not on zmeter.
flux_09 is still reporting chisq>2, flux_21 over 1.
loop voltage still around 1.0V
Next: reduce inner gap (from about 1cm)
|
| Mar 22 2007 10:29:07:027AM | 1070322006 | Steve Wolfe |
Shot#6: reduce inner gap (from about 1cm to .5cm)
Fizzle. Ian left the room.
|
| Mar 22 2007 10:39:55:400AM | 1070322007 | Steve Wolfe |
Shot#7: repeat for reduced inner gap (from about 1cm to .5cm)
Dud. Ian is blaming the sparker.
|
| Mar 22 2007 10:54:59:260AM | 1070322008 | Steve Wolfe |
Shot#8: repeat for reduced inner gap (from about 1cm to .5cm)
Another dud, bz came down as programmed.
|
| Mar 22 2007 11:05:20:573AM | 1070322009 | Steve Wolfe |
Shot#9: Another dud. Jim will go in the cell to inspect the sparker.
|
| Mar 22 2007 11:41:04:253AM | 1070322010 | Steve Wolfe |
Shot#10: Plasma came back after increasing sparker voltage
Bouncer with hards.
Pg3 puff very marginal throughout the shot.
Ratiomatic is noisy, maybe pickup from sparker.
next: decrease inner gap again.
|
| Mar 22 2007 11:51:17:710AM | 1070322011 | Steve Wolfe |
Shot#11: decrease inner gap again.
Dud. Jim says sparker is still close to 1mA.
|
| Mar 22 2007 12:20:40:540PM | 1070322012 | Steve Wolfe |
Shot#12: decrease inner gap again.
Bob now in as physop, and will raise pg4 to 24msec (from 20)
Something bad happened to oh2 bus rogs (camac and dpcs)
and tf rog on that shot.
|
| Mar 22 2007 12:49:33:430PM | 1070322012 | Steve Wolfe |
Shot#12: Shunt signals indicate the oh2's went to their
PLC limits on that shot.
DPCS demand on oh2L was full out on negative voltage through shot
oh2U is full negative before commutation then reverses ok.
This means that after 80msec the oh2's went to opposite rails.
TF rog was bad, but it's on current control so it ran ok.
|
| Mar 22 2007 01:12:42:947PM | 1070322013 | Steve Wolfe |
Shot#13: OH2U and OH2L forward bridge 10kA PLC test
to check supplies, coax resistance, amd whether the bus
rogowskis are in fact fixed.
Rogowskis are still bad on both oh2's and tf
Fizzle detector may not have worked either.
|
| Mar 22 2007 01:45:15:713PM | 1070322014 | Steve Wolfe |
Shot#14: No power cycle to see if the rogowskis are
showing up bad with no inputs. Test shots look ok.
The signals in question include at least three different integrator
cards (the oh2u varistor rogowski also had a problem on shot13).
Rog signals look fine.
Next: another oh2 plc test
|
| Mar 22 2007 01:57:01:210PM | 1070322015 | Steve Wolfe |
Shot#15: PLC Oh2 test again.
These look ok.
|
| Mar 22 2007 02:05:47:477PM | 1070322016 | Steve Wolfe |
Shot#16: PLC tf test
Still trying to confirm that rogs are now working,
because nothing has been done beyond unplugging and
plugging cables and pulling and re-seating boards.
That looks ok, TF trace is good, oh baseline is near
zero with no slope.
|
| Mar 22 2007 02:32:33:807PM | 1070322017 | Steve Wolfe |
Shot#17: Limit reverse bridge currents on OH1,OH2U,OH2L
to 15ka (from 26 and 27). Set up for plasma.
plasma to 1.45sec; it did hit the current rails on the
oh's. LOts of runaways.
2mm inner gap.
JR talked Bob into letting him have an argon puff.
Next: go limited.
|
| Mar 22 2007 02:40:31:697PM | 1070322018 | Steve Wolfe |
Shot#18: PLC current limits back to normal; try for limited plasma.
dud.
|
| Mar 22 2007 02:55:03:993PM | 1070322019 | Steve Wolfe |
Shot#19: PLC current limits back to normal; try for limited plasma.
another dud, despite higher fill.
Br now looks too negative, and Bz is a little positive.
|
| Mar 22 2007 03:04:22:197PM | 1070322020 | Steve Wolfe |
Shot#20: PLC current limits back to normal; try for limited plasma.
Another dud.
|
| Mar 22 2007 03:24:46:167PM | 1070322021 | Steve Wolfe |
Shot#21: fizzle
|
| Mar 22 2007 03:32:28:743PM | 1070322022 | Steve Wolfe |
Shot#22:
dud.
|
| Mar 22 2007 03:57:57:680PM | 1070322023 | Steve Wolfe |
Shot#23: Very weak fizzle.
We are going to ecdc for 15minutes
Jim went down to check on the sparker, and reports
that it was tripped off. Not sure how long ago this happened
because the camera that was looking at it had died, possibly
at the same time.
|
| Mar 22 2007 04:13:10:710PM | 1070322024 | Steve Wolfe |
Shot#24: No power shot, to be sure turning the sparker back
on didn't screw up the rogowskis again.
Rogowskis look ok,
try for plasma again.
|
| Mar 22 2007 04:31:56:510PM | 1070322025 | Steve Wolfe |
Shot#25: Still trying to get a limited plasma case.
fizzle. breakdown time is good, burnout is poor.
Bz looks high. CIII signal is pretty low, so is zmeter.
|
| Physics Operator Comments |
| Mar 22 2007 09:12:29:463AM | | Ian Hutchinson | Only PCS changes from yesterday:
Lower PG3 puff to 42 from 50-100ms. Try to avoid the gassing out phenomenon.
Gas fill puff to 20ms from 24ms. Remove Wolfe's last tweak. Gas is not the way to
avoid runaways on a permanent basis IMHO.
Sparker has been worked on.
|
| Mar 22 2007 09:27:04:853AM | 1070322001 | Ian Hutchinson | Plasma till 2s, complete ramp down. Looks very good.
|
| Mar 22 2007 09:41:04:933AM | 1070322002 | Ian Hutchinson | Plasma till 2s.
Delay the nl04 flat top start to .3s from .2s.
|
| Mar 22 2007 09:58:41:103AM | 1070322003 | Ian Hutchinson | Plasma till 2s. Some runaways after a small bounce.
|
| Mar 22 2007 10:16:29:713AM | 1070322004 | Ian Hutchinson | Plasma till 2s. Slight feedback puff shows we are beginning to get fueling under control.
|
| Mar 22 2007 10:28:05:057AM | 1070322005 | Ian Hutchinson | Plasma till 2 seconds. Camac timing problem on bolo/neuts-hards.
Drop Clearin by 5mm. Drop Rcur by 3mm. To move plasma closer to inner wall.
|
| Mar 22 2007 10:39:50:370AM | 1070322006 | Ian Hutchinson | Fizzle. Late breakdown at 14ms. Sparker is highly suspect.
No changes.
|
| Mar 22 2007 10:54:43:637AM | 1070322007 | Ian Hutchinson | Dud.Bz a little higher.
EF4 to -1355 from -1345A.
|
| Mar 22 2007 11:04:55:917AM | 1070322008 | Ian Hutchinson | Dud.
Take 200V off first 2 EF3 voltage points.
|
| Mar 22 2007 11:40:02:500AM | 1070322009 | Ian Hutchinson | Dud.
Entry to increase the voltage on the sparker.
|
| Mar 22 2007 11:48:36:630AM | 1070322010 | Ian Hutchinson | Plasma to 2 sec. Slight continuing puff.
EF3 back to 2800V at 5ms.
Clearin to -9mm (drop 5mm), Rcur dropped 3mm.
|
| Mar 22 2007 11:50:37:150AM | 1070322011 | Ian Hutchinson | Dud.
|
| Mar 22 2007 12:04:04:180PM | 1070322012 | Robert Granetz | Granetz taking over as physop for Ian prior to this shot.
|
| Mar 22 2007 12:05:15:853PM | 1070322012 | Robert Granetz | Prior to this shot I increased PG4 by 4 ms (20 --> 24 ms). Jim Irby also went into
the cell and played with the sparker cable.
|
| Mar 22 2007 12:16:47:947PM | 1070322012 | Robert Granetz | Shot 12 -- Fizzle. G-side-ratiomatic shows zero pressure, but I don't believe it.
Next shot: reload segment 1 from shot 5. (This puts PG4 back to 20 ms.)
|
| Mar 22 2007 12:19:28:727PM | 1070322012 | Robert Granetz | Actually, a number of the bus Rogowski signals look bad (OH2U & L, TF). These
bad signals went into the DPCS.
|
| Mar 22 2007 12:27:20:620PM | 1070322012 | Robert Granetz | Actually, the bad OH2L bus signal into DPCS caused OH2L to go to 34 kA.
Jim Irby just took a test shot and the bus Rogowskis are still bad.
Power room access granted to work on the bus Rogowskis.
|
| Mar 22 2007 12:41:45:557PM | 1070322013 | Robert Granetz | Shot 13: OH2U & L test under PLC control. 10 kA.
|
| Mar 22 2007 01:11:15:273PM | 1070322013 | Robert Granetz | Result: OH2U & L bus Rogowskis are still bad. So is the TF.
|
| Mar 22 2007 01:47:57:210PM | 1070322014 | Robert Granetz | Shot 14: test of bus Rogowskis, with no coil currents. They look okay.
We also puffed gas, and the G-side ratiomatic is working properly.
|
| Mar 22 2007 01:57:28:010PM | 1070322015 | Robert Granetz | Shot 15: Another OH2U & L test under PLC control. This time the bus Rogowskis look good.
Next shot: 50 kA TF-only test to check its bus Rogowski.
|
| Mar 22 2007 02:16:37:150PM | 1070322016 | Robert Granetz | Shot 16: TF-only test. 50 kA, PLC control. TF bus Rogowski signal looks good.
Next shot: go for plasma. I've enabled an argon puff for John Rice (t=0.300-0.350 s).
Also, the PLC reverse current limits on the OH1 and OH2's has been reduced
to 15 kA just to be cautious for now.
|
| Mar 22 2007 02:29:06:977PM | 1070322017 | Robert Granetz | Shot 17: Plasma. Disrupted at 1.5 seconds because the OH's hit their reduced rails.
Lots of hard x-rays. This shot was almost inner-wall limited, as planned
for shot 5.
Next shot: reduce CLEARIN by 1.1 cm (from -9 mm --> -20 mm)
|
| Mar 22 2007 02:39:06:837PM | 1070322018 | Robert Granetz | Shot 18: Dud. Fields look okay.
Next shot: increase pre-fill by 4 ms (20 --> 24 ms).
|
| Mar 22 2007 02:52:16:917PM | 1070322019 | Robert Granetz | Shot 19: Dud. Br0 is a little low.
Next shot: increase Br0 offset by 0.5 mT (-0.0007 --> -0.0002 T)
|
| Mar 22 2007 03:05:28:133PM | 1070322020 | Robert Granetz | Shot 20: Dud again.
Next shot: subtract 15 amps from IC_EF4 (-1345 --> -1360 A)
|
| Mar 22 2007 03:19:36:290PM | 1070322021 | Robert Granetz | Shot 21: Fizzle.
Next shot: no changes.
|
| Mar 22 2007 03:32:14:493PM | 1070322022 | Robert Granetz | Shot 22: Dud. Field null looks good.
Next shot: raise pre-fill to 30 ms, at Steve's suggestion.
|
| Mar 22 2007 03:43:47:557PM | 1070322023 | Robert Granetz | Shot 23: Fizzle, just barely.
Set up to do 15 minutes of ECDC before the next shot. Also, Jim will go down and check the sparker.
Next shot: reduce pre-fill gas puff back to 24 ms.
|
| Mar 22 2007 04:08:34:120PM | 1070322023 | Robert Granetz | Shot 24 -- Prior to this shot, Jim went into the cell and played with the sparker, so we
are going to have a no-power test shot to make sure that the bus Rogowskis and
other DAQ are still working okay.
|
| Mar 22 2007 04:13:42:603PM | 1070322024 | Robert Granetz | Shot 24 -- Test. No-power shot cycle to confirm that bus Rogowskis are still working after Jim
played with the sparker.
Bus rogowskis are working properly.
Next shot: try for plasma again.
|
| Mar 22 2007 04:27:01:383PM | 1070322025 | Robert Granetz | Shot 25 -- Fizzle. I think we need an overnight boronization, but we might as well get in
the last 2-3 shot attempts.
Next shot: no changes.
|
| Mar 22 2007 04:49:28:620PM | 1070322026 | Robert Granetz | Shot 26 -- Fizzle.
Next shot: reduce pre-fill to 20 ms.
|
| Mar 22 2007 04:51:49:667PM | 1070322027 | Robert Granetz | Shot 27 -- Fizzle.
Next shot: add 2 ms to pre-fill (to 22 ms)
|
| Mar 22 2007 05:00:42:010PM | 1070322028 | Robert Granetz | Shot 28 -- Fizzle.
End of run. Turn on the ECDC please!
|
| System Availability |
| Mar 22 2007 09:10:50:777AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | | Feb 05 2007 04:33PM (twf) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi should be ready, but need plasma to confirm. Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 19 2007 01:59PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | Only channel 17-32 available until after power test | Feb 21 2007 12:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 2-8 operational. Now cross-calibrated against Michelson. | Mar 22 2007 08:43AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels operational. Fast signals not yet connected. | Mar 22 2007 08:58AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Not available 3/1-3/6 | Jan 23 2007 02:24PM (g) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | | Jan 23 2007 02:24PM (g) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | 80.5 MHz. coaxial line needs more work. more hi-yard work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Available after 3/20 | Jan 23 2007 02:24PM (g) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | | Jan 14 2007 02:03PM | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 06 2007 01:09PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | reinke,terry | | Michelson | yes | Operational, at reduced speed. | Mar 21 2007 09:39AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, DANT are operational; JANT and DIV (without an ND filter) are being debugged. WIDE2 has not yet been inserted into its re-entrant tube. | Mar 16 2007 09:38AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | System being re-assembled; expected operational Mar. 27 | Mar 21 2007 07:09PM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | System being re-assembled | Mar 06 2007 08:55AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 22 2007 09:51:46:290AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | | Feb 05 2007 04:33PM (twf) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi should be ready, but need plasma to confirm. Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 19 2007 01:59PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | Only channel 17-32 available until after power test | Feb 21 2007 12:54PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 2-8 operational. Now cross-calibrated against Michelson. But, intermittent problems with preamps causing noise and drifts. | Mar 22 2007 09:48AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,78,10,17) operational and calibrated. Fast signals not yet connected. | Mar 22 2007 09:47AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Not available 3/1-3/6 | Jan 23 2007 02:24PM (g) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | | Jan 23 2007 02:24PM (g) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | 80.5 MHz. coaxial line needs more work. more hi-yard work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Available after 3/20 | Jan 23 2007 02:24PM (g) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | | Jan 14 2007 02:03PM | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 06 2007 01:09PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | reinke,terry | | Michelson | yes | Operational, at reduced speed. | Mar 21 2007 09:39AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, DANT are operational; JANT and DIV (without an ND filter) are being debugged. WIDE2 has not yet been inserted into its re-entrant tube. | Mar 16 2007 09:38AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | System being re-assembled; expected operational Mar. 27 | Mar 21 2007 07:09PM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | System being re-assembled | Mar 06 2007 08:55AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 22 2007 10:50:15:150AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | | Feb 05 2007 04:33PM (twf) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi should be ready, but need plasma to confirm. Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 19 2007 01:59PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | no | Only channel 17-32 available until after power test - connection problem on lower channels - will check next chance. | Mar 22 2007 10:47AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 2-8 operational. Now cross-calibrated against Michelson. But, intermittent problems with preamps causing noise and drifts. | Mar 22 2007 09:48AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,78,10,17) operational and calibrated. Fast signals not yet connected. | Mar 22 2007 09:47AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Not available 3/1-3/6 | Jan 23 2007 02:24PM (g) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | | Jan 23 2007 02:24PM (g) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | 80.5 MHz. coaxial line needs more work. more hi-yard work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Available after 3/20 | Jan 23 2007 02:24PM (g) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | | Jan 14 2007 02:03PM | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 06 2007 01:09PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | reinke,terry | | Michelson | yes | Operational, at reduced speed. | Mar 21 2007 09:39AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, DANT are operational; JANT and DIV (without an ND filter) are being debugged. WIDE2 has not yet been inserted into its re-entrant tube. | Mar 16 2007 09:38AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | System being re-assembled; expected operational Mar. 27 | Mar 21 2007 07:09PM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | System being re-assembled | Mar 06 2007 08:55AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 22 2007 11:02:54:980AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | | Feb 05 2007 04:33PM (twf) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi should be ready, but need plasma to confirm. Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 19 2007 01:59PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | no | Only channel 17-32 available until after power test - connection problem on lower channels - ch 10 bad filter (off scale) - will check next chance. | Mar 22 2007 10:52AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 2-8 operational. Now cross-calibrated against Michelson. But, intermittent problems with preamps causing noise and drifts. | Mar 22 2007 09:48AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,78,10,17) operational and calibrated. Fast signals not yet connected. | Mar 22 2007 09:47AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Not available 3/1-3/6 | Jan 23 2007 02:24PM (g) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | | Jan 23 2007 02:24PM (g) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | 80.5 MHz. coaxial line needs more work. more hi-yard work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Available after 3/20 | Jan 23 2007 02:24PM (g) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | | Jan 14 2007 02:03PM | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 06 2007 01:09PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | reinke,terry | | Michelson | yes | Operational, at reduced speed. | Mar 21 2007 09:39AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, DANT are operational; JANT and DIV (without an ND filter) are being debugged. WIDE2 has not yet been inserted into its re-entrant tube. | Mar 16 2007 09:38AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | System being re-assembled; expected operational Mar. 27 | Mar 21 2007 07:09PM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | System being re-assembled | Mar 06 2007 08:55AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 22 2007 12:09:59:883PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | | Feb 05 2007 04:33PM (twf) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi should be ready, but need plasma to confirm. Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 19 2007 01:59PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | no | Only channel 17-32 available until after power test - connection problem on lower channels - ch 10 bad filter (off scale) - will check next chance. | Mar 22 2007 10:52AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 2-8 operational. Now cross-calibrated against Michelson. But, intermittent problems with preamps causing noise and drifts. | Mar 22 2007 09:48AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,78,10,17) operational and calibrated. Fast signals not yet connected. | Mar 22 2007 09:47AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Not available 3/1-3/6 | Jan 23 2007 02:24PM (g) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | no | | Jan 23 2007 02:24PM (g) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | 80.5 MHz. coaxial line needs more work. more hi-yard work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Available after 3/20 | Jan 23 2007 02:24PM (g) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | | Jan 14 2007 02:03PM | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 06 2007 01:09PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | reinke,terry | | Michelson | yes | Operational. Occasional DAQ failures, not understood. Speed increased 3/22. | Mar 22 2007 12:04PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, DANT are operational; JANT and DIV (without an ND filter) are being debugged. WIDE2 has not yet been inserted into its re-entrant tube. | Mar 16 2007 09:38AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | System being re-assembled; expected operational Mar. 27 | Mar 21 2007 07:09PM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | System being re-assembled | Mar 06 2007 08:55AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|