| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change |
| Active MHD | no | | Feb 05 2007 04:33PM (twf) | Joe Snipes | Active MHD Antenna | sears,snipes |
| BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec |
| Bolometers | no | 2Pi should be ready, but need plasma to confirm. Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 19 2007 01:59PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke |
| Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby |
| CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker |
| Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard |
| CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan |
| D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe |
| Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar |
| Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte |
| Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry |
| Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry |
| DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz |
| FRC-ECE | no | Only channel 17-32 available until after power test - connection problem on lower channels - ch 10 bad filter (off scale) - will check next chance. | Mar 22 2007 10:52AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips |
| G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland |
| GPC | yes | Chs 3-8 operational, cross-calibrated. But, intermittent problems with preamps causing noise and drifts. | Mar 23 2007 08:37AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt |
| GPC2 | yes | Most slow channels (except 1,78,10,17) operational and calibrated. Fast signals not yet connected. | Mar 22 2007 09:47AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt |
| GPI | no | Not available 3/1-3/6 | Jan 23 2007 02:24PM (g) | Jim Terry | Gas Puff Imaging | terry,zweben |
| H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar |
| Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice |
| Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice |
| HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt |
| ICRF D-Antenna | no | 80.5 MHz. Transmitter ready. A little more work on the coaxial line. | Mar 26 2007 03:18PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin |
| ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin |
| ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin |
| Lower Hybrid | no | Available after 3/20 | Jan 23 2007 02:24PM (g) | Ron Parker | Lower Hybrid | dterry,parker |
| LPI | no | | Jan 14 2007 02:03PM | Earl Marmar | Lithium Pellet Injector | bose,marmar |
| Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 06 2007 01:09PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke |
| McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | reinke,terry |
| Michelson | yes | Operational. Occasional DAQ failures, not understood. Speed increased 3/22. | Mar 22 2007 12:04PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt |
| MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard |
| MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard |
| MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott |
| Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore |
| Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby |
| NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry |
| PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab |
| Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard |
| Plasma TV | yes | WIDE1, DANT are operational; JANT and DIV (without an ND filter) are being debugged. WIDE2 has not yet been inserted into its re-entrant tube. | Mar 16 2007 09:38AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe |
| Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby |
| Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard |
| Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard |
| Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard |
| Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard |
| Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar |
| Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard |
| Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard |
| Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick |
| TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray |
| TS - Core | no | Lasers are aligned. Polychromators being reinstalled. Resolving issues with HVPS. Expect some channels available by Mar. 30. | Mar 26 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes |
| TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |