| Session Leader Comments |
| Mar 27 2007 12:12:46:930PM | 1070327006 | Steve Wolfe |
Shot#6: Another data cycle test.
I'm not getting updates on new scopes. Have to actually
blow them away and bring up new ones, not just load saved
settings from.
Data all seems to be there. Granetz is complaining the beam
did not go, but beam data did.
|
| Mar 27 2007 12:29:42:913PM | 1070327007 | Steve Wolfe |
Shot#7: Data system is supposedly fixed (We've heard this
before).
Do an oh 10kA PLC test.
Breaker pulled before PULSE.
No excitation on Alternator.
Try again
|
| Mar 27 2007 12:50:57:960PM | 1070327008 | Steve Wolfe |
Shot#8: Try again for 10kA oh PLC test.
Rog signals are fine, no magnetics errors.
Actually, the bus rogs look a little noisy.
Looks like a little bit of 60Hz.
It turns out this was under dpcs control, with a
plc current limit of 10kA.
|
| Mar 27 2007 01:04:36:523PM | 1070327009 | Steve Wolfe |
Shot#9: Try again for 10kA oh PLC test.
This time it was as planned.
Looks ok
|
| Mar 27 2007 01:14:27:760PM | 1070327010 | Steve Wolfe |
Shot#10: Try for plasma.
Consider backing off the plc reverse current limit from
26/27kA to 20kA, but decide not to.
Run a no power, the pcs shot for today was never loaded into
model.
|
| Mar 27 2007 01:37:09:727PM | 1070327011 | Steve Wolfe |
Shot#11: Another try at plasma.
Short plasma, to .29sec, marfing and runaways.
Strange spike on magnetics at .018sec
f11 has a baseline offset, otherwise just a little spike on
several loops and on Btor. Is it important?
The spike at .018 is coincident with a sparker arc.
There is also a sparker arc around -.0127, which does not
seem to line up with additional noise on the magnetics
at -.025 and -.011 (as seen at the dpcs inputs).
|
| Mar 27 2007 02:03:21:133PM | 1070327012 | Steve Wolfe |
Shot#12: Sparker test before this shot gave low current,
no increase to >300uA at -.5sec, and a few large arcs.
Do another OH PLC test like shot 9, just for the sake of caution.
Rogowski signals look ok, no glitches on magnetics at dpcs.
Sparker went to 200uA, may be responding to gas puff.
|
| Mar 27 2007 02:17:36:010PM | 1070327013 | Steve Wolfe |
Shot#13: Another plasma try
plasma full length
startup is ugly, bounced once on outside.
Lots of runaways. Lots of injections on 2pi diode.
nl04=6e19, puffing a little gas on pg3.
Next: try for marginally limited plasma
|
| Mar 27 2007 02:36:37:120PM | 1070327014 | Steve Wolfe |
Shot#14: try for marginally limited plasma
Looks like we got it. EFIT claims 3mm inner gap.
NL04 is a little higher and the gas is off.
Wide2 view shows a clear stripe in the inner wall,
despite EFIT claiming it's still diverted. Jant
view does look like there is a lot of flux to the divertor.
(Auto update not working, may need to restart something
after all the aborts this morning).
Loop voltage is up about 100mV.
Next: move it in some more.
|
| Mar 27 2007 02:48:43:680PM | 1070327015 | Steve Wolfe |
Shot#15: try for limited plasma
plasma full length
Density up to 9e19, EFIT claims left gap zero this time.
Small bounce on startup, hards are still bad.
One big arc on sparker at -.95 sec. No pickup on bus rogs;
or on magnetics.
|
| Mar 27 2007 02:59:07:210PM | 1070327016 | Steve Wolfe |
Shot#16: Repeat. Startup a little better, fewer hards.
NL04 about 9e19 again.
F11 is the only complainer on the magnetics.
Keep doing this for a few
|
| Mar 27 2007 03:11:40:120PM | 1070327017 | Steve Wolfe |
Shot#17: Another short shot
Injection at 0.61sec.
|
| Mar 27 2007 03:17:52:807PM | 1070327017 | Steve Wolfe |
A possible candidate for an upper null is
1060620013, segment 4, which is 800kA USN
with an early (1.0sec) Ip rampdown. Everything else
appears to be flat until 1.5sec, so it should be
possible just to extend it. Has a He3 puff (PG2)
But not this shot.
|
| Mar 27 2007 03:25:05:773PM | 1070327018 | Steve Wolfe |
Shot#18: repeat (without the injection, hopefully)
fizzle. CIII level is way up, then an additional jump
at 16msec. Disruption effect, I guess.
Jim thinks Bz was up a mT.
|
| Mar 27 2007 03:38:59:743PM | 1070327019 | Steve Wolfe |
Shot#19: Jim tweaking startup.
plasma full length
Nl04 down to 8e19, Vloop~1.3V, no pg3 in flattop
Startup better, sparker down to 150uA at t=0
next: repeat, but with gate valves closed in pulse.
|
| Mar 27 2007 04:04:14:460PM | 1070327020 | Steve Wolfe |
Shot#20: plasma full length
nl04 has fringe jumps.
Lots of runaways this time. nl04 back up near 9e19 again.
Closing the gate valves had no noticeable effect on startup.
|
| Mar 27 2007 04:19:46:133PM | 1070327021 | Steve Wolfe |
Shot#21: repeat (gate valves back open).
plasma full length.
nl04 still jumping; Jim says HeNe #3.
Startup has early bounces or injections; lots of runaways.
Tweak the early gas a little to see if the density comes down
any more.
|
| Mar 27 2007 04:39:54:477PM | 1070327022 | Steve Wolfe |
Shot#22: Tweak the early gas a little to see if the density comes down
any more.
plasma full length.
runaways are down, survived a huge injection at 1.11sec (halpha
and nl4, not much on bolo or current).
Arc on sparker shows up on dpcs magnetics around -.285sec (spike on
zcur at -.285sec, one sample at 100usec).
|
| Mar 27 2007 04:54:05:523PM | 1070327022 | Steve Wolfe |
Shot#22: There may be timing issues on some channels on
this shot: The bolo perturbation from the injection seems
to lead the halpha rise and the density rise by over 10msec.
So does the current perturbation. GPC coincides with Halpha.
|
| Mar 27 2007 04:53:37:320PM | 1070327023 | Steve Wolfe |
Shot#23: plasma, a few more hards.
nl04 down a little, but still well over programmed value;
not degassing the wall very well.
For the last shot, go another 5mm on clearin, make it
more limited.
|
| Mar 27 2007 05:19:04:383PM | 1070327024 | Steve Wolfe |
Shot#24: plasma full length.
Hard xrays are back down again
NL04 flat at 8.7e19. Vloop~1.45Volts
Looks a little more limited, dsep=-0.3cm
END OF RUN
|
| Physics Operator Comments |
| Mar 27 2007 09:02:59:337AM | 1070327001 | Jim Irby | Loaded 1070322001 into DPCS: Normal gap SLN at 800 kA
Density request: 6e19/m^2 on NL04
prepuff 20 mS gate
This shot is a cycle test
gas okay
Rogowskis okay
|
| Mar 27 2007 09:15:02:777AM | 1070327002 | Jim Irby | We were not getting updates on the last shot. Josh is restarting the cycle.
Took shot too early; Josh was not done...
|
| Mar 27 2007 11:35:24:603AM | 1070327004 | Jim Irby | continuing data system tests
not good
|
| Mar 27 2007 11:39:59:587AM | 1070327005 | Jim Irby | data system still broken --- aborting everything with bits
|
| Mar 27 2007 12:00:42:993PM | 1070327005 | Jim Irby | Another data system cycle test
We have some data
|
| Mar 27 2007 12:08:10:057PM | 1070327006 | Jim Irby | Josh and Tom seemed happy with last shot
Try one more time
looks okay
|
| Mar 27 2007 12:33:50:133PM | 1070327007 | Jim Irby | Will do OH test: 10 kA in OH1, OH2U, OH2L, no commutation
This test will verify proper operation of integrators
OP error, no power shot again. Data system still okay
|
| Mar 27 2007 12:55:48:633PM | 1070327008 | Jim Irby | Try again ---
We got current: 10kA in all OHs
Looks like we had hybrid control with PLC limits
OH2U coax voltage measurement following current pulse noisy
|
| Mar 27 2007 01:07:19:400PM | 1070327009 | Jim Irby | Try again under PLC control this time
Looks good
cell access for DNB
|
| Mar 27 2007 01:17:12:120PM | 1070327010 | Jim Irby | Try for plasma
One more no power test --- PO "load from" shot 1070322001, but forgot to do a "load" --- may have been okay, but....
|
| Mar 27 2007 01:46:57:667PM | 1070327011 | Jim Irby | Try again for plasma
plasma for 300 mS
starup looks good
ciii levels about 1/2 of those on 1070322001
pickup, probably from sparker, on magnetics
|
| Mar 27 2007 02:03:43:650PM | 1070327012 | Jim Irby | Repeat shot 9, oh test to make sure sparker has not affected magnetics
test shots of sparker indicate lower current (< 50 uA, except during tickdowns)
dropped PG3 in seg 1 and seg 2
Rogs look good.
No tickdowns on sparker
|
| Mar 27 2007 02:24:58:320PM | 1070327013 | Jim Irby | Try for plasma
sparker on at -1.9 for 1.920 s
plasma into rampdown
sparker looks good --- responds to gas and plasma
H/H+D 25%
|
| Mar 27 2007 02:39:08:260PM | 1070327014 | Jim Irby | Plasma to wall:
clearin from 0.00 to -0.01 cm
rcur from 0.661 to 0.656 m
plasma into rampdown
sparker looks good --- overlay of shot 13
still 2 or 3 mm off wall
|
| Mar 27 2007 02:55:17:587PM | 1070327015 | Jim Irby | clearin reduced by 0.5 cm
rcur reduced by 0.25 cm
impurity levels (RGA) still high from last shot --- BP at check 1.4e-6 Torr
plasma into rampdown
zero gap
sparker arc at -0.95 s does not show up elsewhere
|
| Mar 27 2007 03:06:26:150PM | 1070327016 | Jim Irby | Repeat
plasma into rampdown
|
| Mar 27 2007 03:19:23:180PM | 1070327017 | Jim Irby | repeat
injection starting abt 0.5761 s
|
| Mar 27 2007 03:29:59:697PM | 1070327018 | Jim Irby | repeat (w/o injection)
fizzle
sparker okay
ciii up a factor of two relative to shot 17
Bz0 about 1 mT higher than shot 17 at 5 ms
|
| Mar 27 2007 03:44:13:697PM | 1070327019 | Jim Irby | EF4 from -1345 to -1355 A
plasma into rampdown
1 MW of LH power into dummy loads during C-Mod cycle
2Pi around 0.4 MW w/o any large injections
|
| Mar 27 2007 04:02:18:557PM | 1070327020 | Jim Irby | repeat DCPS
have asked for gatevalve toggle remaining closed for 25 s
plasma into rampdown
1.5 MW early spike on 2Pi
gatevalves toggle worked --- basepressure at t=0 up from .044 to .050 mTorr, but no effect on startup
ciii light continues to decrease
h/h+d 37%
|
| Mar 27 2007 04:27:03:227PM | 1070327021 | Jim Irby | repeat of DCPS
D-Right vertical TF TC is taking 19 minutes in RECOOL to reach -162C
plasma into rampdown
ciii down a little, but early injections or waggles
density is not dropping very much shot to shot
|
| Mar 27 2007 04:45:47:727PM | 1070327022 | Jim Irby | reduced pg3 gas in seg 1 and turned it off in seg 2
ciii continues to fall shot to shot
sparker tickdown seen on magnetics (-0.28 s)
large injection of something at about 1.08 s --- density, halpa, z-meter, 2pi, pressure rise.
|
| Mar 27 2007 04:58:28:070PM | 1070327023 | Jim Irby | 13:42 minutes in recool to get to -160C (pump has been at 8 psi all day)
repeat DCPS
plasma into rampdown
|
| Mar 27 2007 05:15:06:307PM | 1070327024 | Jim Irby | clearin reduced by 0.5 cm
rcur reduced by 0.25 cm
plasma into rampdown
|
| System Availability |
| Mar 27 2007 08:50:03:853AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | | Feb 05 2007 04:33PM (twf) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi should be ready, but need plasma to confirm. Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 19 2007 01:59PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | no | Only channel 17-32 available until after power test - connection problem on lower channels - ch 10 bad filter (off scale) - will check next chance. | Mar 22 2007 10:52AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, cross-calibrated. But, intermittent problems with preamps causing noise and drifts. | Mar 23 2007 08:37AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,78,10,17) operational and calibrated. Fast signals not yet connected. | Mar 22 2007 09:47AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Not available 3/1-3/6 | Jan 23 2007 02:24PM (g) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | 80.5 MHz. Transmitter ready. A little more work on the coaxial line. | Mar 26 2007 03:18PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Available after 3/20 | Jan 23 2007 02:24PM (g) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | | Jan 14 2007 02:03PM | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 06 2007 01:09PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | reinke,terry | | Michelson | yes | Operational. Occasional DAQ failures, not understood. Speed increased 3/22. | Mar 22 2007 12:04PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, DANT are operational; JANT and DIV (without an ND filter) are being debugged. WIDE2 has not yet been inserted into its re-entrant tube. | Mar 16 2007 09:38AM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Lasers are aligned. Polychromators being reinstalled. Resolving issues with HVPS. Expect some channels available by Mar. 30. | Mar 26 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 27 2007 01:56:21:823PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | | Feb 05 2007 04:33PM (twf) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi should be ready, but need plasma to confirm. Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 19 2007 01:59PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | no | Only channel 17-32 available until after power test - connection problem on lower channels - ch 10 bad filter (off scale) - will check next chance. | Mar 22 2007 10:52AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, cross-calibrated. But, intermittent problems with preamps causing noise and drifts. | Mar 23 2007 08:37AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,78,10,17) operational and calibrated. Fast signals not yet connected. | Mar 22 2007 09:47AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | no | Not available 3/1-3/6 | Jan 23 2007 02:24PM (g) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | 80.5 MHz. Transmitter ready. A little more work on the coaxial line. | Mar 26 2007 03:18PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Available after 3/20 | Jan 23 2007 02:24PM (g) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | | Jan 14 2007 02:03PM | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 06 2007 01:09PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Occasional DAQ failures, not understood. Speed increased 3/22. | Mar 22 2007 12:04PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Lasers are aligned. Polychromators being reinstalled. Resolving issues with HVPS. Expect some channels available by Mar. 30. | Mar 26 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 27 2007 02:09:04:197PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | | Feb 05 2007 04:33PM (twf) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi should be ready, but need plasma to confirm. Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 19 2007 01:59PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | no | Only channel 17-32 available until after power test - connection problem on lower channels - ch 10 bad filter (off scale) - will check next chance. | Mar 22 2007 10:52AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, cross-calibrated. But, intermittent problems with preamps causing noise and drifts. | Mar 23 2007 08:37AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,78,10,17) operational and calibrated. Fast signals not yet connected. | Mar 22 2007 09:47AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | 80.5 MHz. Transmitter ready. A little more work on the coaxial line. | Mar 26 2007 03:18PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Available after 3/20 | Jan 23 2007 02:24PM (g) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | | Jan 14 2007 02:03PM | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 06 2007 01:09PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Occasional DAQ failures, not understood. Speed increased 3/22. | Mar 22 2007 12:04PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Lasers are aligned. Polychromators being reinstalled. Resolving issues with HVPS. Expect some channels available by Mar. 30. | Mar 26 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 27 2007 03:20:02:947PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | | Feb 05 2007 04:33PM (twf) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi should be ready, but need plasma to confirm. Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 19 2007 01:59PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | no | Only channel 17-32 available until after power test - connection problem on lower channels - ch 10 bad filter (off scale) - will check next chance. | Mar 22 2007 10:52AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, cross-calibrated. | Mar 27 2007 03:12PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,78,10,17) operational , but amplitudes low today for unknown reason. | Mar 27 2007 03:13PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | 80.5 MHz. Transmitter ready. A little more work on the coaxial line. | Mar 26 2007 03:18PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Available after 3/20 | Jan 23 2007 02:24PM (g) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | | Jan 14 2007 02:03PM | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 06 2007 01:09PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Occasional DAQ failures, not understood. Speed increased 3/22. | Mar 22 2007 12:04PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Lasers are aligned. Polychromators being reinstalled. Resolving issues with HVPS. Expect some channels available by Mar. 30. | Mar 26 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 27 2007 03:51:25:930PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | no | | Feb 05 2007 04:33PM (twf) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi should be ready, but need plasma to confirm. Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 19 2007 01:59PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | Only channel 17-32 available (other channels will be added shortly) - ch 10 bad filter (off scale) | Mar 27 2007 03:34PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, cross-calibrated. | Mar 27 2007 03:12PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational , but amplitudes low today for unknown reason. | Mar 27 2007 03:36PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | 80.5 MHz. Transmitter ready. A little more work on the coaxial line. | Mar 26 2007 03:18PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Available after 3/20 | Jan 23 2007 02:24PM (g) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | | Jan 14 2007 02:03PM | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 06 2007 01:09PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Occasional DAQ failures, not understood. Speed increased 3/22. | Mar 22 2007 12:04PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Lasers are aligned. Polychromators being reinstalled. Resolving issues with HVPS. Expect some channels available by Mar. 30. | Mar 26 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 27 2007 04:46:17:023PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 27 2007 04:35PM (snipes) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi should be ready, but need plasma to confirm. Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 19 2007 01:59PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | Only channel 17-32 available (other channels will be added shortly) - ch 10 bad filter (off scale) | Mar 27 2007 03:34PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, cross-calibrated. | Mar 27 2007 03:12PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational , but amplitudes low today for unknown reason. | Mar 27 2007 03:36PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | no | 80.5 MHz. Transmitter ready. A little more work on the coaxial line. | Mar 26 2007 03:18PM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Available after 3/20 | Jan 23 2007 02:24PM (g) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon after first plasma, 2D ready by start of science runs. | Mar 06 2007 01:09PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. Occasional DAQ failures, not understood. Speed increased 3/22. | Mar 22 2007 12:04PM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Lasers are aligned. Polychromators being reinstalled. Resolving issues with HVPS. Expect some channels available by Mar. 30. | Mar 26 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|