| Mar 28 2007 10:42:43:140AM | 1070328001 | Jim Irby | No power test with gas --- check sparker, rogowskis, etc...
Sparker had only about 20 uA of current w/o response to gas
**** correction **** data system was loading incorrect data for sparker current and voltage.
|
| Mar 28 2007 09:37:56:483AM | 1070328002 | Jim Irby | another no power cycle test. Wolfe suspects problem with DCPS.
|
| Mar 28 2007 09:52:52:403AM | 1070328003 | Jim Irby | plasma attempt
plasma for 0.345 s
TCI data was not stored after shot because of server #2 problem. Tom will attempt to store the data.
|
| Mar 28 2007 10:07:25:920AM | 1070328004 | Jim Irby | plasma into rampdown
may have another little data problem --- old data being loaded
We think we are ready to go over to lower hybrid operation.
Turning over SL to Greg until Randy arrives.
|
| Mar 28 2007 11:09:06:793AM | 1070328006 | Greg Wallace | 1st attempt at firing LH into plasma of 2007 run campaign. Initial turn on tripped out after 2.5ms. 4 retries, none of which were successful. 23T appears to be the culprit. Next shot will be 10ms @ 30kW per klys with CPS bypassed.
|
| Mar 28 2007 11:28:45:043AM | 1070328007 | Greg Wallace | Shot ran for 10ms @ 370kW with CPS system bypassed. REV6B and REV23T would have tripped out had the CPS been enabled. Overall reflection coef of ~20% is not terrible, so we will retry these plasma conditions again.
|
| Mar 28 2007 11:39:27:153AM | 1070328008 | Greg Wallace | REV23T and REV06B were again problems. Will add attenuators to these signals (cell access) and try with CPS enabled for next shot.
|
| Mar 28 2007 12:13:53:903PM | 1070328009 | Greg Wallace |
REV23T has been attenuated, which effectively lowers trip level for that channel. CPS has been re-enabled, shot reprogrammed for 100ms starting at 700ms.
Trip at 10ms into pulse, 4 retries but no success. Multiple trips in FINT and jungle gym---possibly arcs in jungle gym. Lowering power to 10kW per klys for next shot.
|
| Mar 28 2007 01:54:33:810PM | 1070328013 | J. Randall Wilson | Solved problem with LH pulse width and retries
Turned out to be conflicting gate requests
|
| Mar 28 2007 01:55:13:250PM | 1070328014 | J. Randall Wilson | Raise power
|
| Mar 28 2007 01:55:43:170PM | 1070328015 | J. Randall Wilson | Raise power Trips due to high intrinsic reflection on 23T
|
| Mar 28 2007 02:11:15:467PM | 1070328016 | J. Randall Wilson | Raise power Trips due to high intrinsic reflection on 23T
go in to cell to add attenuation to some channels
|
| Mar 28 2007 02:46:30:687PM | 1070328018 | J. Randall Wilson | changed trip levels allowed ~0.08 s then a real trip
|
| Mar 28 2007 03:36:46:903PM | 1070328021 | J. Randall Wilson | shot good at ~0.5 MW
shot strange, high density marfing
|
| Mar 28 2007 04:00:40:403PM | 1070328022 | J. Randall Wilson | density more normal
computer communictions problem
essentialy no lh
|
| Mar 28 2007 04:01:12:123PM | 1070328023 | J. Randall Wilson | try 60-90-120 phasing
trips right at change to 90
|
| Mar 28 2007 04:14:04:500PM | 1070328024 | J. Randall Wilson | go back to pure 60 raise power
~0.65 MW arcs
|
| Mar 28 2007 04:54:38:357PM | 1070328026 | J. Randall Wilson | pure 60 raise power
~0.72 MW arcs
|
| Mar 28 2007 05:05:45:890PM | 1070328027 | J. Randall Wilson | same
~0.72 MW arcs
|
| Mar 28 2007 05:14:50:403PM | 1070328028 | J. Randall Wilson | lower power full pulse
~0.57 MW
|
| Physics Operator Comments |
| Mar 28 2007 09:12:41:373AM | 1070328001 | Earl Marmar | load from 1060727012, import segment 1 from 1070327016, load - no warnings or errors
start with a no-power cycle test, with gas
looks ok; no noise on bus signals
|
| Mar 28 2007 09:33:46:030AM | 1070328002 | Earl Marmar | turn off active MHD calculation in DPCS
Steve Wolfe was nervous about some errors in DPCS on shot 1, so we've done another no-power test with gas
looks ok.
|
| Mar 28 2007 09:50:24:060AM | 1070328003 | Earl Marmar | zero AMH_FREQ in segments 2 and 4 (which had a sawtooth programmed for shots 1 and 2). Segment 4 is not active.
go for plasma
Disrupt at .34 seconds; no sawteeth; got very resistive before the disruption.
|
| Mar 28 2007 10:09:00:310AM | 1070328004 | Earl Marmar | no pcs changes
plasma; ramped all the way down
some camac data problems; Tom is working on it.
|
| Mar 28 2007 10:33:47:543AM | 1070328005 | Earl Marmar | no pcs changes
switching to MP473, LH checkout; Greg Wallace is now session leader
LH turning on (.7 to .8 seconds)
ICRF (D-port) also programmed to put power into plasma (start at .85 seconds)
hung in INIT for 7 minutes; no power cycle
|
| Mar 28 2007 11:01:24:997AM | 1070328006 | Earl Marmar | try again
no pcs changes
switching to MP473, LH checkout; Greg Wallace is now session leader
LH turning on (.7 to .8 seconds)
ICRF (D-port) also programmed to put power into plasma (start at .85 seconds)
plasma
startup very ratty, big hesitation in current rise
Significant early hard x-rays
|
| Mar 28 2007 11:21:45:717AM | 1070328007 | Earl Marmar | increase nl_04 target to 6e19
plasma
still lots of hard x-rays
got the higher density
|
| Mar 28 2007 11:41:10:060AM | 1070328008 | Earl Marmar | add 2 msec to prefill puff (now 22 msec)
plasma
hard x-rays lower than on 7, but still significant early
|
| Mar 28 2007 12:09:57:733PM | 1070328009 | Earl Marmar | touch up early nl_04 target to try to decrease the early density dip
final target still 6e19
plasma
improved the density dip
hards about the same
|
| Mar 28 2007 12:41:17:263PM | 1070328010 | Earl Marmar | enable B-side lower (argon); 50 msec puff starting at 0.3 seconds
plasma
hards better
|
| Mar 28 2007 12:41:55:967PM | 1070328011 | Earl Marmar | nl_04 target increased to 8e19
plasma
hards almost gone
|
| Mar 28 2007 12:58:05:200PM | 1070328012 | Earl Marmar | no pcs changes
plasma
|
| Mar 28 2007 01:25:28:000PM | 1070328013 | Earl Marmar | argon puff increased to 70 msec (from 50 msec)
plasma
|
| Mar 28 2007 01:35:06:827PM | 1070328014 | Earl Marmar | no pcs changes
plasma
some hard x-rays
|
| Mar 28 2007 01:34:49:060PM | 1070328015 | Earl Marmar | no pcs changes
plasma
|
| Mar 28 2007 02:01:44:547PM | 1070328016 | Earl Marmar | increase argon puff to 100 msec (from 70 msec)
plasma
|
| Mar 28 2007 02:14:48:327PM | 1070328017 | Earl Marmar | enabling DNB gate valve
add 2 msec to prefill puff (now 24 msec)
plasma
disrupt at 1.49 seconds
|
| Mar 28 2007 02:45:00:983PM | 1070328018 | Earl Marmar | reduce prefill puff by 2 msec (to 22 msec)
plasma
|
| Mar 28 2007 02:53:30:077PM | 1070328019 | Earl Marmar | no pcs changes
fizzle
|
| Mar 28 2007 03:14:23:513PM | 1070328020 | Earl Marmar | no pcs changes
fizzle
|
| Mar 28 2007 03:37:45:263PM | 1070328021 | Earl Marmar | DNB not firing between shots
EF4 current 10 A more negative at t=0 (now -1355)
plasma
some hards
big marfe, high loop voltage; something outgassed
various power supplies hit limits after 1 second, plasma went double null
|
| Mar 28 2007 03:38:49:967PM | 1070328022 | Earl Marmar | reduce prefill puff by 2 msec (now 20 msec)
reduce early segment 2 nl_04 target
plasma
|
| Mar 28 2007 03:54:21:357PM | 1070328023 | Earl Marmar | no pcs changes
plasma
early hard x-rays higher
|
| Mar 28 2007 04:08:57:420PM | 1070328024 | Earl Marmar | add 3 msec to prefill puff (now 23 msec)
plasma
|
| Mar 28 2007 04:21:59:500PM | 1070328025 | Earl Marmar | add 1 msec to prefill puff, now 24 msec
fizzle
|
| Mar 28 2007 04:47:55:780PM | 1070328026 | Earl Marmar | EF4 current 20 A less negative at t=0, now -1335A
plasma
startup is better; hards way down
|
| Mar 28 2007 04:59:25:500PM | 1070328027 | Earl Marmar | no pcs changes
plasma
|
| Mar 28 2007 05:09:30:797PM | 1070328028 | Earl Marmar | no pcs changes
plasma
|
| System Availability |
| Mar 28 2007 09:07:10:857AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 27 2007 04:35PM (snipes) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | no | | Jan 14 2007 01:46PM | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | Only channel 17-32 available (other channels will be added shortly) - ch 10 bad filter (off scale) | Mar 27 2007 03:34PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, cross-calibrated. | Mar 27 2007 03:12PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System available for low power, short pulse testing into plasma | Mar 28 2007 07:18AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Expect some channels available by Mar. 30. | Mar 28 2007 08:36AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 28 2007 09:39:44:170AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 27 2007 04:35PM (snipes) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | Only channel 17-32 available (other channels will be added shortly) - ch 10 bad filter (off scale) | Mar 27 2007 03:34PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, cross-calibrated. | Mar 27 2007 03:12PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System available for low power, short pulse testing into plasma | Mar 28 2007 07:18AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Expect some channels available by Mar. 30. | Mar 28 2007 08:36AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 28 2007 09:54:47:543AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Limited to pre-programmed freq sweeps due to DPCS bug | Mar 28 2007 09:53AM (snipes) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | Only channel 17-32 available (other channels will be added shortly) - ch 10 bad filter (off scale) | Mar 27 2007 03:34PM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, cross-calibrated. | Mar 27 2007 03:12PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System available for low power, short pulse testing into plasma | Mar 28 2007 07:18AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Expect some channels available by Mar. 30. | Mar 28 2007 08:36AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 28 2007 11:11:19:293AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Limited to pre-programmed freq sweeps due to DPCS bug | Mar 28 2007 09:53AM (snipes) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels calibrated and working expect for Ch 10 that has bad amp) | Mar 28 2007 11:02AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, cross-calibrated. | Mar 27 2007 03:12PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System available for low power, short pulse testing into plasma | Mar 28 2007 07:18AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Expect some channels available by Mar. 30. | Mar 28 2007 08:36AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|