Alcator C-Mod Run 1070328 Information

Back to runs

Miniproposals
Miniproposal:298a
Date Filed: 5/20/2002
Title:C-Mod Plasma Startup
First Author:Jim Irby
Session Leader:Jim Irby (shots 1-4)
Miniproposal:473
Date Filed: 3/9/2007
Title:Lower Hybrid System Check-out and Initial operation
First Author:J. Randall Wilson
Session Leader:Greg Wallace (shots 5-14)
Session Leader:J. Randall Wilson (shots 10-28)

Operators
Session leader(s):Jim Irby,Greg Wallace,J. Randall Wilson
Physics operator(s):Earl Marmar
Engineering operator(s):Ed Fitzgerald,Sam Pierson,Gary Dekow

Engineering Operator Run Comment
MP298a: Startup, MP:473 LH Check-out and Initial Operation PO:Earl Marm

Session Leader Plans
Entered: Mar 27 2007 05:33:58:400PM
Author: J. Randall Wilson
LH startup and checkout
MP 437

Begin in standard pure ctr 90 degree phasing disable CPS
Establish operations at minimum of 100 kW 200 ms pulses (1-3 shots)
Vary plasma density during pulse (ramp nel04 from ~0.4- 1.2 x10e20 (if possible) or if not adequate to trip CPS vary plasma position (outer gap) to verify CPS operation (trip annunciation) (1-3 shots)
Reset CPS as necessary (requires cell access)
If necessary repeat shot to verify CPS trip points (1-3 shots)
Take shot with ctr 60-90-120 phase settings (1 shot)
Reset toco phase (requires cell access)
Take shot at -60, -90, -120 phase to verify symmetry of phasing in reflection co-efficient (1 shot)
Add ICRF minimum pulse ~0.02 s , try different antennas power up to 1 MW ~5 shots
Raise LH power in ~100 kW steps to maximum (10-15 shots)


Entered: Mar 28 2007 09:03:15:357AM
Author: Jim Irby
Continue starup activity:

. continue SNL or inner wall limited

. D-Port power as available

. Switch to MP473 following conditioning --- Lower Hybrid Checkout

Physics Operators Plans
Entered: Mar 27 2007 04:35:24:023PM
Author: Earl Marmar
Engineering setup for Wednesday 28 March 2007

MP 298a: Startup
MP 473: Lower Hybrid Check-out and Initial Operation

Session leader: Irby/Wilson
Physics operator: Marmar

ECDC overnight in D2, pressure=2e-4 Torr. Rmin/Rdwell/Rmax = 44/45/103 cm.
Bake at 60 C.

The run will start at 09:00 and end at 17:00.

Power systems as on 1060727012.

A-coil configuration: normal [Dtop -Dbot -Jtop +Jbot] and enabled.

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
NINJA pumped out disabled

Enable the following gate valves and shutters: ECE, VUV, Z-bolo shutters

Torvac setup: Gate valves open during pulse.

-------------------------------------------------------------------------------
ICRF Setup: None

LH Setup: Plan to operate assuming all is well with plasma cleanup

___________________________________

Start from plasma like 1060727012 as lower hybrid target. This shot has special fizzle and invert settings to ensure OH ramping after the shot, even if Ip ramps all the way down.


Session Leader Summaries
Entered: Mar 28 2007 05:18:54:437PM
Author: J. Randall Wilson
Begin lower hybrid commisioning

straigtened out several computer issues

succesfully set CPS trip points for co phasing

Raised power to ~0.7 MW pulses

ran some pulses higher that had real arcs

will reset over night for counter phase comparison then go on to Greg's coupling XP


Physics Operator Summaries
Entered: Mar 28 2007 06:10:41:780PM
Author: Earl Marmar
The machine ran well today. There were a few data acquisition glitches early in the run, with some data loss, and one init hang (shot 5) leading to a no-power shot.

A number of shots had significant early hard x-rays, all correlated with breakdown bounces. Tweaking the early gas and EF4 current bias may have helped.

All but 2 of the shots that took off made it essentially all the way down. The first plasma of the day (shot 3) disrupted early. Shot 17 disrupted at end of flattop (1.5 seconds). Shot 21 had a giant marfe and high loop voltage; several supplies hit rails, and control was partially lost; it went double null near the end of flattop.

Argon was puffed starting with shot 10.

LH operated into plasma today, with net power up to 700 kW for short pulses and 550 kW for .1 s (shot 28).

ICRF (D-port) was also tried on several shots, but did not get beyond short trips.

By the end of the run, H/(H+D) was around 20%.

Summary:
Plasmas 22
fizzles 3
no power 3

Total cycles 28

Session Leader Comments
Mar 28 2007 10:42:43:140AM1070328001Jim IrbyNo power test with gas --- check sparker, rogowskis, etc...

Sparker had only about 20 uA of current w/o response to gas
**** correction **** data system was loading incorrect data for sparker current and voltage.
Mar 28 2007 09:37:56:483AM1070328002Jim Irbyanother no power cycle test. Wolfe suspects problem with DCPS.
Mar 28 2007 09:52:52:403AM1070328003Jim Irbyplasma attempt

plasma for 0.345 s

TCI data was not stored after shot because of server #2 problem. Tom will attempt to store the data.


Mar 28 2007 10:07:25:920AM1070328004Jim Irbyplasma into rampdown

may have another little data problem --- old data being loaded

We think we are ready to go over to lower hybrid operation.

Turning over SL to Greg until Randy arrives.
Mar 28 2007 11:09:06:793AM1070328006Greg Wallace1st attempt at firing LH into plasma of 2007 run campaign. Initial turn on tripped out after 2.5ms. 4 retries, none of which were successful. 23T appears to be the culprit. Next shot will be 10ms @ 30kW per klys with CPS bypassed.
Mar 28 2007 11:28:45:043AM1070328007Greg WallaceShot ran for 10ms @ 370kW with CPS system bypassed. REV6B and REV23T would have tripped out had the CPS been enabled. Overall reflection coef of ~20% is not terrible, so we will retry these plasma conditions again.
Mar 28 2007 11:39:27:153AM1070328008Greg WallaceREV23T and REV06B were again problems. Will add attenuators to these signals (cell access) and try with CPS enabled for next shot.
Mar 28 2007 12:13:53:903PM1070328009Greg Wallace
REV23T has been attenuated, which effectively lowers trip level for that channel.  CPS has been re-enabled, shot reprogrammed for 100ms starting at 700ms.

Trip at 10ms into pulse, 4 retries but no success.  Multiple trips in FINT and jungle gym---possibly arcs in jungle gym.  Lowering power to 10kW per klys for next shot.

Mar 28 2007 01:54:33:810PM1070328013J. Randall WilsonSolved problem with LH pulse width and retries
Turned out to be conflicting gate requests
Mar 28 2007 01:55:13:250PM1070328014J. Randall WilsonRaise power
Mar 28 2007 01:55:43:170PM1070328015J. Randall WilsonRaise power Trips due to high intrinsic reflection on 23T
Mar 28 2007 02:11:15:467PM1070328016J. Randall WilsonRaise power Trips due to high intrinsic reflection on 23T

go in to cell to add attenuation to some channels
Mar 28 2007 02:46:30:687PM1070328018J. Randall Wilsonchanged trip levels allowed ~0.08 s then a real trip
Mar 28 2007 03:36:46:903PM1070328021J. Randall Wilsonshot good at ~0.5 MW
shot strange, high density marfing
Mar 28 2007 04:00:40:403PM1070328022J. Randall Wilsondensity more normal
computer communictions problem
essentialy no lh
Mar 28 2007 04:01:12:123PM1070328023J. Randall Wilsontry 60-90-120 phasing
trips right at change to 90
Mar 28 2007 04:14:04:500PM1070328024J. Randall Wilsongo back to pure 60 raise power

~0.65 MW arcs
Mar 28 2007 04:54:38:357PM1070328026J. Randall Wilson pure 60 raise power

~0.72 MW arcs
Mar 28 2007 05:05:45:890PM1070328027J. Randall Wilson same
~0.72 MW arcs
Mar 28 2007 05:14:50:403PM1070328028J. Randall Wilsonlower power full pulse

~0.57 MW


Physics Operator Comments
Mar 28 2007 09:12:41:373AM1070328001Earl Marmarload from 1060727012, import segment 1 from 1070327016, load - no warnings or errors

start with a no-power cycle test, with gas

looks ok; no noise on bus signals
Mar 28 2007 09:33:46:030AM1070328002Earl Marmarturn off active MHD calculation in DPCS

Steve Wolfe was nervous about some errors in DPCS on shot 1, so we've done another no-power test with gas

looks ok.
Mar 28 2007 09:50:24:060AM1070328003Earl Marmarzero AMH_FREQ in segments 2 and 4 (which had a sawtooth programmed for shots 1 and 2). Segment 4 is not active.

go for plasma

Disrupt at .34 seconds; no sawteeth; got very resistive before the disruption.
Mar 28 2007 10:09:00:310AM1070328004Earl Marmarno pcs changes

plasma; ramped all the way down

some camac data problems; Tom is working on it.
Mar 28 2007 10:33:47:543AM1070328005Earl Marmarno pcs changes

switching to MP473, LH checkout; Greg Wallace is now session leader
LH turning on (.7 to .8 seconds)
ICRF (D-port) also programmed to put power into plasma (start at .85 seconds)

hung in INIT for 7 minutes; no power cycle
Mar 28 2007 11:01:24:997AM1070328006Earl Marmartry again

no pcs changes
switching to MP473, LH checkout; Greg Wallace is now session leader
LH turning on (.7 to .8 seconds)
ICRF (D-port) also programmed to put power into plasma (start at .85 seconds)

plasma
startup very ratty, big hesitation in current rise
Significant early hard x-rays
Mar 28 2007 11:21:45:717AM1070328007Earl Marmarincrease nl_04 target to 6e19

plasma
still lots of hard x-rays
got the higher density
Mar 28 2007 11:41:10:060AM1070328008Earl Marmaradd 2 msec to prefill puff (now 22 msec)

plasma

hard x-rays lower than on 7, but still significant early
Mar 28 2007 12:09:57:733PM1070328009Earl Marmartouch up early nl_04 target to try to decrease the early density dip
final target still 6e19

plasma
improved the density dip
hards about the same
Mar 28 2007 12:41:17:263PM1070328010Earl Marmarenable B-side lower (argon); 50 msec puff starting at 0.3 seconds

plasma
hards better
Mar 28 2007 12:41:55:967PM1070328011Earl Marmarnl_04 target increased to 8e19

plasma
hards almost gone
Mar 28 2007 12:58:05:200PM1070328012Earl Marmarno pcs changes

plasma
Mar 28 2007 01:25:28:000PM1070328013Earl Marmarargon puff increased to 70 msec (from 50 msec)

plasma

Mar 28 2007 01:35:06:827PM1070328014Earl Marmarno pcs changes

plasma
some hard x-rays

Mar 28 2007 01:34:49:060PM1070328015Earl Marmarno pcs changes

plasma


Mar 28 2007 02:01:44:547PM1070328016Earl Marmarincrease argon puff to 100 msec (from 70 msec)

plasma



Mar 28 2007 02:14:48:327PM1070328017Earl Marmarenabling DNB gate valve
add 2 msec to prefill puff (now 24 msec)

plasma
disrupt at 1.49 seconds



Mar 28 2007 02:45:00:983PM1070328018Earl Marmarreduce prefill puff by 2 msec (to 22 msec)

plasma



Mar 28 2007 02:53:30:077PM1070328019Earl Marmarno pcs changes

fizzle



Mar 28 2007 03:14:23:513PM1070328020Earl Marmarno pcs changes

fizzle

Mar 28 2007 03:37:45:263PM1070328021Earl MarmarDNB not firing between shots
EF4 current 10 A more negative at t=0 (now -1355)

plasma
some hards
big marfe, high loop voltage; something outgassed
various power supplies hit limits after 1 second, plasma went double null

Mar 28 2007 03:38:49:967PM1070328022Earl Marmarreduce prefill puff by 2 msec (now 20 msec)
reduce early segment 2 nl_04 target

plasma

Mar 28 2007 03:54:21:357PM1070328023Earl Marmarno pcs changes

plasma
early hard x-rays higher
Mar 28 2007 04:08:57:420PM1070328024Earl Marmaradd 3 msec to prefill puff (now 23 msec)

plasma
Mar 28 2007 04:21:59:500PM1070328025Earl Marmaradd 1 msec to prefill puff, now 24 msec

fizzle
Mar 28 2007 04:47:55:780PM1070328026Earl MarmarEF4 current 20 A less negative at t=0, now -1335A

plasma
startup is better; hards way down
Mar 28 2007 04:59:25:500PM1070328027Earl Marmarno pcs changes

plasma
Mar 28 2007 05:09:30:797PM1070328028Earl Marmarno pcs changes

plasma

Engineering Operator Comments
ShotTimeTypeStatusComment
109:07:26:827AMTestOkNo power cycle test
209:24:03:983AMTestOkNo power cycle test
309:40:03:717AMPlasmaOk
409:55:04:827AMPlasmaOk
510:26:28:357AMTestBad
610:54:31:090AMPlasmaOk
711:11:37:403AMPlasmaOk
811:29:03:043AMPlasmaOk
911:59:17:217AMPlasmaOk
1012:12:56:590PMPlasmaOk
1112:31:22:810PMPlasmaOk
1212:45:15:373PMPlasmaOk
1312:59:13:640PMPlasmaOk
1401:13:22:703PMPlasmaOk
1501:29:38:797PMPlasmaOk
1601:54:23:547PMPlasmaOk
1702:08:45:250PMPlasmaOk
1802:34:15:390PMPlasmaOk
1902:47:17:920PMPlasmaOk
2003:09:09:483PMPlasmaOk
2103:22:16:623PMPlasmaOk
2203:36:31:357PMPlasmaOk
2303:48:59:357PMPlasmaOk
2404:01:39:153PMPlasmaOk
2504:20:00:107PMPlasmaOk
2604:38:42:653PMPlasmaOk
2704:51:42:560PMPlasmaOk
2805:04:04:263PMPlasmaOk

System Availability
Mar 28 2007 09:07:10:857AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 27 2007 04:35PM (snipes)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNBno Jan 14 2007 01:46PM Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available (other channels will be added shortly) - ch 10 bad filter (off scale)Mar 27 2007 03:34PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 3-8 operational, cross-calibrated. Mar 27 2007 03:12PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational.Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnowill check out system on shots with plasmaMar 11 2007 10:36PM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged.Mar 12 2007 10:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoExpect some channels available by Mar. 30. Mar 28 2007 08:36AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes


Mar 28 2007 09:39:44:170AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 27 2007 04:35PM (snipes)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available (other channels will be added shortly) - ch 10 bad filter (off scale)Mar 27 2007 03:34PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 3-8 operational, cross-calibrated. Mar 27 2007 03:12PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational.Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnowill check out system on shots with plasmaMar 11 2007 10:36PM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged.Mar 12 2007 10:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoExpect some channels available by Mar. 30. Mar 28 2007 08:36AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes


Mar 28 2007 09:54:47:543AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesLimited to pre-programmed freq sweeps due to DPCS bugMar 28 2007 09:53AM (snipes)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesOnly channel 17-32 available (other channels will be added shortly) - ch 10 bad filter (off scale)Mar 27 2007 03:34PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 3-8 operational, cross-calibrated. Mar 27 2007 03:12PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational.Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnowill check out system on shots with plasmaMar 11 2007 10:36PM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged.Mar 12 2007 10:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoExpect some channels available by Mar. 30. Mar 28 2007 08:36AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes


Mar 28 2007 11:11:19:293AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesLimited to pre-programmed freq sweeps due to DPCS bugMar 28 2007 09:53AM (snipes)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels calibrated and working expect for Ch 10 that has bad amp)Mar 28 2007 11:02AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 3-8 operational, cross-calibrated. Mar 27 2007 03:12PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational.Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnowill check out system on shots with plasmaMar 11 2007 10:36PM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged.Mar 12 2007 10:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoExpect some channels available by Mar. 30. Mar 28 2007 08:36AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes