| Mar 29 2007 09:24:12:620AM | 1070329001 | J. Randall Wilson | phased for 60 ccd
fired into dummy loads
|
| Mar 29 2007 09:34:53:357AM | 1070329002 | J. Randall Wilson | phased for 60 ccd
fired into machine
tripped on waveguide 2 intrinsic as expected
next shot bypass CPS short pulse
|
| Mar 29 2007 09:53:14:543AM | 1070329003 | J. Randall Wilson | bypass cps
100 ms pulse
good
only waveguide 2 needs to be adjusted
cell access to pad waveguide 2 top and bottom
|
| Mar 29 2007 10:01:00:247AM | 1070329004 | J. Randall Wilson | added padding to 2 top and bottom
reengage cps
good no trips
|
| Mar 29 2007 10:15:50:323AM | 1070329005 | J. Randall Wilson | raise power
tube arc klytron 1
therfore no retries
|
| Mar 29 2007 10:36:12:153AM | 1070329006 | J. Randall Wilson | good
small density rise
small (very) loop voltage drop
~0.33 MW
|
| Mar 29 2007 10:51:02:230AM | 1070329007 | J. Randall Wilson | raise power
trips (real) 10T
~0.5 MW
|
| Mar 29 2007 11:00:33:840AM | 1070329008 | J. Randall Wilson |
trips (real) 19, 20
~0.5 MW
go over to greg's mp
|
| Mar 29 2007 11:57:35:700AM | 1070329009 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Starting with equilibrium from 1060728023. Will adjust plasma location and shape from there.
Reflection coef:
60 90 120
AB
35% 60% 80%
CD
25 50 70
Density 1-2e17 on LH probes.
|
| Mar 29 2007 12:08:30:200PM | 1070329010 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Plasma axis 5mm below equilibrium from 1060728023.
Reflection coef:
Phase
60 90 120
AB
35% 55% 80%
CD
20% 40% 60%
Density 1-2e17 on top LH probes, 2-3e17 on lower LH probes.
Next shot will move lower x-point down by 5mm.
|
| Mar 29 2007 12:24:26:620PM | 1070329011 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Plasma axis AND lower x-point 5mm below equilibrium from 1060728023.
Reflection coef:
Phase
60 90 120
AB
33% 60% 85%
CD
21% 40% 65%
Density 1-2e17 on top LH probes, 2-3e17 on lower LH probes.
Next shot will be 10mm below 1060728023 on both x-point and magnetic axis.
Some ICRF during second half of pulse, they are moving until after 1s for next shot.
|
| Mar 29 2007 12:34:38:933PM | 1070329012 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Plasma axis AND lower x-point 10mm below equilibrium from 1060728023.
Reflection coef:
Phase
60 90 120
AB
30% 60% 85%
CD
20% 35% 55%
Density 1-1.5e17 on top LH probes, ~3e17 on lower LH probes.
Next shot will move upper x-point out by 2cm.
|
| Mar 29 2007 12:48:07:403PM | 1070329013 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Plasma axis and lower x-point 10mm below equilibrium from 1060728023. Upper x-point moved out 2cm.
Reflection coef:
Phase
60 90 120
AB
30% 60% 90%
CD
20% 40% 60%
Density .7-1e17 on top LH probes, 2-3e17 on lower LH probes.
Next shot will move upper x-point out by an additional 2cm.
|
| Mar 29 2007 01:01:01:370PM | 1070329014 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Plasma axis and lower x-point 10mm below equilibrium from 1060728023. Upper x-point moved out 4cm.
Reflection coef:
Phase
60 90 120
AB
25% 50% 75%
CD
20% 40% 65%
Density ~1.4e17 on top LH probes, 2-3e17 on lower LH probes.
Next shot will move lower x-point down an additional 5mm.
|
| Mar 30 2007 09:13:14:403AM | 1070329015 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.
Reflection coef:
Phase
60 90 120
AB
30% 60% 80%
CD
20% 40% 70%
Density .8-1.6e17 on top LH probes, 1-3e17 on lower LH probes.
Next shot will increase nl_04 to 7e19 m^-2.
|
| Mar 29 2007 01:28:57:340PM | 1070329016 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.
Reflection coef:
Phase
60 90 120
AB
30% 50% 80%
CD
20% 40% 60%
Density 1.5e17 on top LH probes, 1.5-3e17 on lower LH probes. Density ramp from 5.2-6.1e19 on nl_04. Repeating this shot, trying for steady 7e19 on nl_04.
Next shot will increase nl_04 to 7e19 m^-2.
|
| Mar 29 2007 01:40:39:857PM | 1070329017 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.
Reflection coef:
Phase
60 90 120
AB
23% 40% 60%
CD
20% 35% 50%
Density 3-4e17 on top LH probes, 3-4e17 on lower LH probes. nl_04 near 7.5e19 m^-2 with some oscillations.
Next shot will increase nl_04 to 9e19 m^-2.
|
| Mar 29 2007 01:54:19:670PM | 1070329018 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.
Reflection coef:
Phase
60 90 120
AB
20% 25% 50%
CD
20% 25% 45%
Density 6-9e17 on top LH probes, 5-9e17 on lower LH probes. nl_04 near 9e19 m^-2.
Next shot will increase nl_04 to 11e19 m^-2.
|
| Mar 29 2007 02:07:38:200PM | 1070329019 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.
Reflection coef:
Phase
60 90 120
AB
20% 17% 25%
CD
20% 17% 25%
Density 3-5e18 on top LH probes, 2.5-5e18 on lower LH probes. Quite a bit higher given a relatively small increase in line integrated density. nl_04 near 1.2e20 m^-2.
Next shot will repeat these conditions due to disruption.
|
| Mar 29 2007 02:51:18:183PM | 1070329021 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.
Reflection coef:
Phase
60 90 120
AB
20% 15% 30%
CD
20% 15% 26%
Density 1.5-3e18 on top LH probes, 1-3e18 on lower LH probes. nl_04 near 1.2e20 m^-2 with substantial swing from 1.1-1.4.
Next shot will repeat these conditions due to disruption.
|
| Mar 29 2007 03:53:04:917PM | 1070329025 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.
Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.
Reflection coef:
Phase
60 90 120
AB
20% 18% 30%
CD
20% 15% 30%
Density 4e18 on top LH probes, 3-4e18 on lower LH probes. nl_04 near 1.2-1.3e20 m^-2.
Cell access to move launcher to 2mm behind limiter. Next shot will be low (as possible) density to avoid disruption.
|
| Mar 29 2007 04:45:51:487PM | 1070329028 | Greg Wallace | Phase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot. Grill 2mm behind limiter.
Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.
Reflection coef:
Phase
60 90 120
50% 20% 18%
Very interesting shot ending in disruption. No data from the LH Langmuir probes, but nl_04 is 1.2e20 m^-2 in a limited(?) plasma. Density appears to be high enough to drive 60 and 90 degree refco's up while driving 120deg refco down to lowest levels yet. Last shot of the day.
|
| Physics Operator Comments |
| Mar 29 2007 09:24:42:810AM | 1070329001 | Ian Hutchinson | No changes from the last shot of yesterday.
Plasma to rampdown.
|
| Mar 29 2007 09:41:32:920AM | 1070329002 | Ian Hutchinson | Plasma till rampdown.
|
| Mar 29 2007 09:56:16:967AM | 1070329003 | Ian Hutchinson | Plasma till rampdown.
Cell entry.
|
| Mar 29 2007 10:16:41:903AM | 1070329004 | Ian Hutchinson | Plasma till rampdown.
|
| Mar 29 2007 10:27:10:607AM | 1070329005 | Ian Hutchinson | Plasma till rampdown.
Set OH1 V to 140V at 8ms (from 150V) trying to speed Bz ramp slightly to avoid
bounces.
|
| Mar 29 2007 10:43:38:420AM | 1070329006 | Ian Hutchinson | Plasma. Runaways were reduced. Sparker had been moved to start earlier just
before shot 5. This gives a solid current.
OH1 V to 130V at 8ms.
|
| Mar 29 2007 10:57:21:810AM | 1070329007 | Ian Hutchinson | Plasma till rampdown.
OH1V to 120V at 7ms.
|
| Mar 29 2007 11:07:34:497AM | 1070329008 | Ian Hutchinson | Plasma till rampdown.
|
| Mar 29 2007 11:55:49:933AM | 1070329009 | Ian Hutchinson | Load segment 2 from 1060728023.
Load.
Plasma till rampdown.
Zcur to -0.014m from -0.009m (5mm lower)
OH1V to 110V.
|
| Mar 29 2007 12:12:08:637PM | 1070329010 | Ian Hutchinson | Plasma till rampdown. Runaways are quite bad. A substantial bounce.
ZXL lowered to -.015 from -.01, i.e. by 5mm.
OH1V to 90V.
|
| Mar 29 2007 12:25:29:170PM | 1070329011 | Ian Hutchinson | Plasma till rampdown.
Zcur to -.019 (additional -5mm). Zxl to -.02 (additional -5mm).
OH2V to 20V from 26V.
|
| Mar 29 2007 12:42:44:887PM | 1070329012 | Ian Hutchinson | Plasma till rampdown.
Moved RXU greater by 2cm.
OH2V to 10V
|
| Mar 29 2007 12:56:27:120PM | 1070329013 | Ian Hutchinson | Plasma till rampdown. Shape did change.
RXU to .025 (additional 2cm outward).
Rcur offset to 1800 in segment 1.
|
| Mar 29 2007 01:03:47:637PM | 1070329014 | Ian Hutchinson | Plasma till rampdown. Bounce fixed. Low runaways.
Lower Zxl a further 5mm to -.025.
|
| Mar 29 2007 01:21:09:997PM | 1070329015 | Ian Hutchinson | Plasma till rampdown.
Raise nl04 to 7e19.
|
| Mar 29 2007 01:35:39:247PM | 1070329016 | Ian Hutchinson | Plasma till rampdown. Did not get high enough density. Got a tiny H-mode.
Raise nl04 to 8e19.
|
| Mar 29 2007 01:44:41:153PM | 1070329017 | Ian Hutchinson | Plasma to rampdown. Got 7e19 nl04.
Raise nl04 to 1e20.
|
| Mar 29 2007 01:57:13:527PM | 1070329018 | Ian Hutchinson | Plasma till rampdown. Got 8.7e19 nl04.
Raise nl04 demand to 1.35e20.
|
| Mar 29 2007 02:22:40:200PM | 1070329019 | Ian Hutchinson | Disruption at .85s. Hit by a brick.
nl04 to 1.30e20.
|
| Mar 29 2007 02:41:50:717PM | 1070329020 | Ian Hutchinson | Fizzle.
Rcur offset to 1500.
|
| Mar 29 2007 03:00:35:683PM | 1070329021 | Ian Hutchinson | Disrupts at 1.56s
Chopper V offset to 0.
Zcur3 P to 3 from 4, D to 5.5 from 6.
|
| Mar 29 2007 03:12:34:607PM | 1070329022 | Ian Hutchinson | Fizzle.
EF3V to 2600 from 2800.
|
| Mar 29 2007 03:15:51:090PM | 1070329023 | Ian Hutchinson | Fizzle. Very little current rise.
ICEF4 to -1340 from -1335.
|
| Mar 29 2007 03:41:51:653PM | 1070329024 | Ian Hutchinson | Fizzle.
Lower gas fill puff to 20ms from 24ms
|
| Mar 29 2007 04:01:42:060PM | 1070329025 | Ian Hutchinson | Disruption. Vertical instability is not fixed by the Marco-recommended tweaks
to P and D on fast zcur.
nl04 to 3e19
icEF4 to -1345A.
|
| Mar 29 2007 04:19:27:820PM | 1070329026 | Ian Hutchinson | Fizzle.
EF3V to 2400 at 5ms.
|
| Mar 29 2007 04:43:36:143PM | 1070329027 | Ian Hutchinson | Fizzle.
Br offset to -.0003 from -.0007
EF3V to 2200 at 5ms 2400 at -1ms.
|
| Mar 29 2007 04:47:19:363PM | 1070329028 | Ian Hutchinson | Plasma Disrupts at 1.4s. Density is remarkably high despite no gas.
There are problems with magnetics for this shot BP14_bc is broken.
End the run at 4:40 and look into the problems.
|
| System Availability |
| Mar 29 2007 09:12:42:217AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels calibrated and working expect for Ch 10 that has bad amp) | Mar 28 2007 11:02AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, cross-calibrated. | Mar 27 2007 03:12PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System available for low power, short pulse testing into plasma | Mar 28 2007 07:18AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Tests proceeding during shot cycles. Expect some channels available on Mar. 30. | Mar 29 2007 08:38AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 29 2007 09:57:57:670AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels calibrated and working expect for Ch 10 that has bad amp) | Mar 28 2007 11:02AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, but signals are low and noisy today. | Mar 29 2007 09:43AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts. | Mar 29 2007 09:42AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System available for low power, short pulse testing into plasma | Mar 28 2007 07:18AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Tests proceeding during shot cycles. Expect some channels available on Mar. 30. | Mar 29 2007 08:38AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 29 2007 10:40:13:357AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels calibrated and working expect for Ch 10 that has bad amp) | Mar 28 2007 11:02AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, but signals are low and noisy on SOME shots today. Ch 2 is now also working but showing up as Ch 1. | Mar 29 2007 10:39AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts. | Mar 29 2007 09:42AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System available for low power, short pulse testing into plasma | Mar 28 2007 07:18AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Tests proceeding during shot cycles. Expect some channels available on Mar. 30. | Mar 29 2007 08:38AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 29 2007 11:42:38:667AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels calibrated and working expect for Ch 10 that has bad amp) | Mar 28 2007 11:02AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, but signals are low and noisy on SOME shots today. Ch 2 is now also working. | Mar 29 2007 11:09AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts. | Mar 29 2007 09:42AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System available for low power, short pulse testing into plasma | Mar 28 2007 07:18AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | no | will check out system on shots with plasma | Mar 11 2007 10:36PM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged. | Mar 12 2007 10:08PM (labombard) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Tests proceeding during shot cycles. Expect some channels available on Mar. 30. | Mar 29 2007 08:38AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 29 2007 11:56:04:857AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels calibrated and working expect for Ch 10 that has bad amp) | Mar 28 2007 11:02AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, but signals are low and noisy on SOME shots today. Ch 2 is now also working. | Mar 29 2007 11:09AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts. | Mar 29 2007 09:42AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System available for low power, short pulse testing into plasma | Mar 28 2007 07:18AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Tests proceeding during shot cycles. Expect some channels available on Mar. 30. | Mar 29 2007 08:38AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes |
|
| Mar 29 2007 12:09:50:670PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels calibrated and working expect for Ch 10 that has bad amp) | Mar 28 2007 11:02AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 3-8 operational, but signals are low and noisy on SOME shots today. Ch 2 is now also working. | Mar 29 2007 11:09AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts. | Mar 29 2007 09:42AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System available for low power, short pulse testing into plasma | Mar 28 2007 07:18AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Tests proceeding during shot cycles. Expect some channels available on Mar. 30. | Mar 29 2007 08:38AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | no | | Mar 29 2007 12:00PM | Alex Graf | Visible Spectrometer | agraf |
|
| Mar 29 2007 01:42:03:370PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually. | Mar 13 2007 09:55PM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | no | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Mar 06 2007 08:09PM (rowan) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels calibrated and working expect for Ch 10 that has bad amp) | Mar 28 2007 11:02AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. Cross-calibration with G-Side MKS gauge is needed. | Mar 13 2007 10:02PM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 2-8 operational, but signals are low and noisy on SOME shots today. | Mar 29 2007 01:41PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts. | Mar 29 2007 09:42AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | no | Need to tune from 70 to 78 MHz. Loop not finished. | Mar 16 2007 09:31AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System available for low power, short pulse testing into plasma | Mar 28 2007 07:18AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | | Jan 23 2007 02:24PM (g) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | | Jan 14 2007 02:03PM | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | no | Tests proceeding during shot cycles. Expect some channels available on Mar. 30. | Mar 29 2007 08:38AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. | Mar 26 2007 08:31AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | no | | Mar 29 2007 12:00PM | Alex Graf | Visible Spectrometer | agraf |
|