Alcator C-Mod Run 1070329 Information

Back to runs

Miniproposals
Miniproposal:464
Date Filed: 3/8/2007
Title:LHCD Coupling Optimization
First Author:Greg Wallace
Session Leader:Greg Wallace (shots 9-28)
Miniproposal:473
Date Filed: 3/9/2007
Title:Lower Hybrid System Check-out and Initial operation
First Author:J. Randall Wilson
Session Leader:J. Randall Wilson (shots 1-8)

Operators
Session leader(s):J. Randall Wilson,Greg Wallace
Physics operator(s):Ian Hutchinson
Engineering operator(s):Bill Cochran,Bill Parkin,Bill Byford

Engineering Operator Run Comment
Continue LH commisioning MP 437 with reverse phase condition

Session Leader Plans
Entered: Mar 28 2007 05:27:07:733PM
Author: J. Randall Wilson
Continue LH commisioning MP 437 with reverse phase condition

same set-up as we ended 3/28 mwith

then go to
Greg Wallace lh coupling MP

Entered: Mar 28 2007 07:05:33:593PM
Author: Greg Wallace
Set mechanical phase shifters to 90deg co-current drive. Move launcher to 3mm behind LH limiter.

Six short pulses (10ms) with 25% duty cycle at 200kW total FINT power. Scan phase 60, 90, 120 twice during each shot. Disable CPS if trips due to high reflection prevent operation. (Low power and short pulses will be safe without CPS, and we expect high reflection on some channels.)

Shot 1) Start with equilibrium from 1060728023.
Shot 2) Move plasma 5mm below 1060728023. We hope to see reflections on top/bottom change. We currently believe that we have good coupling on B/C rows but not on A/D rows. Moving the plasma vertically should make coupling better on the D row and worse on the A row. A more significant effect should be seen in the next shot.
Shot 3) Move plasma 10mm below 1060728023.
Shot 4) Take best result from shots 1-3, move upper x-point out in major radius by 5mm. Again, we expect this to impact the up/down assymetry in the reflection coef.
Shot 5) Repeat shot 4 with x-point in by 5mm.
Shot 6) Take best result from shots 1-5. Increase nl_04 to .5e20 m^-2. There should be a density 'sweet spot' for LH coupling.
Shot 7) Increase nl_04 to .7e20 m^-2.
Shot 8) Increase nl_04 to .9e20 m^-2.
Shot 9) Increase nl_04 to 1.1e20 m^-2.

If results from first 9 shots are favorable, move on to next step: Cell Access to move launcher to 2mm behind LH limiter.

Repeat shots 1-9 with new launcher position, starting first with density scan, then varying shape.

If time allows: Move launcher to 1mm behind LH limiter.

Repeat shots 1-9 with new launcher position.

Physics Operators Plans

Session Leader Summaries
Entered: Mar 29 2007 05:20:38:427PM
Author: Greg Wallace
Shots 1-8

Continuation of Randy's MP 437. Did counter-current drive pulses at power levels up to 500kW coupled into the plasma. All shots ran smoothly up to this point.

Shots 9-28

Took over from Randy as session leader for MP on LH coupling optimization. Started with equilibrium from 1070329023 and grill 3mm behind limiter. As expected, reflections were high especially for 90 and 120 degree phasing. Vertical position of lower x-point was incrementally moved to 10mm below original position, and upper x-point was moved out 4cm in minor radius, which resulted in a better fit of plasma to launcher shape. Density scan went well up to 1.2e20 m^-2 on nl_04, at which point we disrupted. Reflection coeffecients dropped dramatically for 90 and 120 deg phasing with increase in density.

An attempt was made at changing the gains on the control system to prevent disruptions, but to no avail and disruptions and fizzles were par for the rest of the day. We moved launcher in to 2mm behind limiter for the last shot of the day, but a magnetics problem caused a strange (limited?) plasma shape with very high density on the outer wall.

We may try some shots again tomorrow at 2mm behind the limiter as this is where we expect reflection coeffecients to really drop.

Worthy of note is the sudden drop in density at the grill when the ICRF comes on at 1s during shot 25. This is a major concern with respect to operating D-port and LH at the same time.

All in all, a good first (real) day as session leader. Thanks to Steve Wolfe and Ian Hutchinson for helping me figure out plasma shapes, and of course the entire LH team for their great work.

Physics Operator Summaries
Entered: Mar 29 2007 04:57:51:973PM
Author: Ian Hutchinson
Summary

The first two thirds of the run went well with perfect startup reliability.
Shot 19 was a disruption, and things went downhill with lots of gas and
fizzles following disruptions. On shot 21 we lost BP14_BC apparently but did not realize it. There was a VDE. We tried lowering the P gain as per Marco's calculation. It did not seem to help by the next time we got a plasma.
But this was not a fair test because the magnetics may have been screwed.
We only finally realized our magnetics problems on the last shot (28).
It is not entirely clear how bad the magnetics really were for the last 7 shots.

Scorecard
  Shot,Duration(s),Ipmax(MA),Result  Shot,Duration(s),Ipmax,Result
  |   01   1.870   0.728   Plasma  |   02   1.943   0.739   Plasma  |
  |   03   1.920   0.736   Plasma  |   04   1.925   0.737   Plasma  |
  |   05   1.945   0.735   Plasma  |   06   1.937   0.739   Plasma  |
  |   07   1.932   0.721   Plasma  |   08   1.938   0.739   Plasma  |
  |   09   1.992   0.825   Plasma  |   10   1.992   0.821   Plasma  |
  |   11   1.991   0.824   Plasma  |   12   1.991   0.827   Plasma  |
  |   13   1.992   0.831   Plasma  |   14   1.990   0.832   Plasma  |
  |   15   1.992   0.836   Plasma  |   16   1.989   0.838   Plasma  |
  |   17   1.985   0.829   Plasma  |   18   1.980   0.827   Plasma  |
  |   19   0.867   0.810   Plasma  |   20   0.000   0.035   Fizzle  |
  |   21   1.548   0.812   Plasma  |   22   0.000   0.038   Fizzle  |
  |   23   0.000   0.035   Fizzle  |   24   0.000   0.036   Fizzle  |
  |   25   1.520   0.798   Plasma  |   26   0.000   0.034   Fizzle  |
  |   27   0.000   0.033   Fizzle  |   28   1.403   0.789   Plasma  |


Date 1070329: 28 shots. 22 plasmas. 6 fizzles. 0 duds. 0 System Error.
(Plasma = Ip gt 50.0 kA Dud = H_alpha lt 0.40 V)
Total plasma duration: 40.64 s (exceeding -72 kA)

Session Leader Comments
Mar 29 2007 09:24:12:620AM1070329001J. Randall Wilsonphased for 60 ccd
fired into dummy loads
Mar 29 2007 09:34:53:357AM1070329002J. Randall Wilsonphased for 60 ccd
fired into machine
tripped on waveguide 2 intrinsic as expected

next shot bypass CPS short pulse
Mar 29 2007 09:53:14:543AM1070329003J. Randall Wilsonbypass cps
100 ms pulse
good
only waveguide 2 needs to be adjusted
cell access to pad waveguide 2 top and bottom
Mar 29 2007 10:01:00:247AM1070329004J. Randall Wilsonadded padding to 2 top and bottom
reengage cps
good no trips
Mar 29 2007 10:15:50:323AM1070329005J. Randall Wilsonraise power
tube arc klytron 1
therfore no retries
Mar 29 2007 10:36:12:153AM1070329006J. Randall Wilsongood
small density rise
small (very) loop voltage drop

~0.33 MW
Mar 29 2007 10:51:02:230AM1070329007J. Randall Wilsonraise power
trips (real) 10T
~0.5 MW
Mar 29 2007 11:00:33:840AM1070329008J. Randall Wilson
trips (real) 19, 20
~0.5 MW

go over to greg's mp
Mar 29 2007 11:57:35:700AM1070329009Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Starting with equilibrium from 1060728023. Will adjust plasma location and shape from there.

Reflection coef:
60 90 120
AB
35% 60% 80%
CD
25 50 70

Density 1-2e17 on LH probes.
Mar 29 2007 12:08:30:200PM1070329010Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Plasma axis 5mm below equilibrium from 1060728023.

Reflection coef:
Phase
60 90 120
AB
35% 55% 80%
CD
20% 40% 60%
Density 1-2e17 on top LH probes, 2-3e17 on lower LH probes.

Next shot will move lower x-point down by 5mm.
Mar 29 2007 12:24:26:620PM1070329011Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Plasma axis AND lower x-point 5mm below equilibrium from 1060728023.

Reflection coef:
Phase
60 90 120
AB
33% 60% 85%
CD
21% 40% 65%
Density 1-2e17 on top LH probes, 2-3e17 on lower LH probes.

Next shot will be 10mm below 1060728023 on both x-point and magnetic axis.

Some ICRF during second half of pulse, they are moving until after 1s for next shot.
Mar 29 2007 12:34:38:933PM1070329012Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Plasma axis AND lower x-point 10mm below equilibrium from 1060728023.

Reflection coef:
Phase
60 90 120
AB
30% 60% 85%
CD
20% 35% 55%
Density 1-1.5e17 on top LH probes, ~3e17 on lower LH probes.

Next shot will move upper x-point out by 2cm.
Mar 29 2007 12:48:07:403PM1070329013Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Plasma axis and lower x-point 10mm below equilibrium from 1060728023. Upper x-point moved out 2cm.

Reflection coef:
Phase
60 90 120
AB
30% 60% 90%
CD
20% 40% 60%
Density .7-1e17 on top LH probes, 2-3e17 on lower LH probes.

Next shot will move upper x-point out by an additional 2cm.
Mar 29 2007 01:01:01:370PM1070329014Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Plasma axis and lower x-point 10mm below equilibrium from 1060728023. Upper x-point moved out 4cm.

Reflection coef:
Phase
60 90 120
AB
25% 50% 75%
CD
20% 40% 65%
Density ~1.4e17 on top LH probes, 2-3e17 on lower LH probes.

Next shot will move lower x-point down an additional 5mm.
Mar 30 2007 09:13:14:403AM1070329015Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.

Reflection coef:
Phase
60 90 120
AB
30% 60% 80%
CD
20% 40% 70%
Density .8-1.6e17 on top LH probes, 1-3e17 on lower LH probes.

Next shot will increase nl_04 to 7e19 m^-2.
Mar 29 2007 01:28:57:340PM1070329016Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.

Reflection coef:
Phase
60 90 120
AB
30% 50% 80%
CD
20% 40% 60%
Density 1.5e17 on top LH probes, 1.5-3e17 on lower LH probes. Density ramp from 5.2-6.1e19 on nl_04. Repeating this shot, trying for steady 7e19 on nl_04.

Next shot will increase nl_04 to 7e19 m^-2.
Mar 29 2007 01:40:39:857PM1070329017Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.

Reflection coef:
Phase
60 90 120
AB
23% 40% 60%
CD
20% 35% 50%
Density 3-4e17 on top LH probes, 3-4e17 on lower LH probes. nl_04 near 7.5e19 m^-2 with some oscillations.

Next shot will increase nl_04 to 9e19 m^-2.
Mar 29 2007 01:54:19:670PM1070329018Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.

Reflection coef:
Phase
60 90 120
AB
20% 25% 50%
CD
20% 25% 45%
Density 6-9e17 on top LH probes, 5-9e17 on lower LH probes. nl_04 near 9e19 m^-2.

Next shot will increase nl_04 to 11e19 m^-2.
Mar 29 2007 02:07:38:200PM1070329019Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.

Reflection coef:
Phase
60 90 120
AB
20% 17% 25%
CD
20% 17% 25%
Density 3-5e18 on top LH probes, 2.5-5e18 on lower LH probes. Quite a bit higher given a relatively small increase in line integrated density. nl_04 near 1.2e20 m^-2.

Next shot will repeat these conditions due to disruption.
Mar 29 2007 02:51:18:183PM1070329021Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.

Reflection coef:
Phase
60 90 120
AB
20% 15% 30%
CD
20% 15% 26%
Density 1.5-3e18 on top LH probes, 1-3e18 on lower LH probes. nl_04 near 1.2e20 m^-2 with substantial swing from 1.1-1.4.

Next shot will repeat these conditions due to disruption.
Mar 29 2007 03:53:04:917PM1070329025Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.

Reflection coef:
Phase
60 90 120
AB
20% 18% 30%
CD
20% 15% 30%
Density 4e18 on top LH probes, 3-4e18 on lower LH probes. nl_04 near 1.2-1.3e20 m^-2.

Cell access to move launcher to 2mm behind limiter. Next shot will be low (as possible) density to avoid disruption.
Mar 29 2007 04:45:51:487PM1070329028Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot. Grill 2mm behind limiter.

Plasma axis and lower x-point 15mm below equilibrium from 1060728023. Upper x-point moved out 4cm.

Reflection coef:
Phase
60 90 120
50% 20% 18%


Very interesting shot ending in disruption. No data from the LH Langmuir probes, but nl_04 is 1.2e20 m^-2 in a limited(?) plasma. Density appears to be high enough to drive 60 and 90 degree refco's up while driving 120deg refco down to lowest levels yet. Last shot of the day.

Physics Operator Comments
Mar 29 2007 09:24:42:810AM1070329001Ian HutchinsonNo changes from the last shot of yesterday.
Plasma to rampdown.
Mar 29 2007 09:41:32:920AM1070329002Ian HutchinsonPlasma till rampdown.
Mar 29 2007 09:56:16:967AM1070329003Ian HutchinsonPlasma till rampdown.

Cell entry.
Mar 29 2007 10:16:41:903AM1070329004Ian HutchinsonPlasma till rampdown.
Mar 29 2007 10:27:10:607AM1070329005Ian HutchinsonPlasma till rampdown.

Set OH1 V to 140V at 8ms (from 150V) trying to speed Bz ramp slightly to avoid
bounces.
Mar 29 2007 10:43:38:420AM1070329006Ian HutchinsonPlasma. Runaways were reduced. Sparker had been moved to start earlier just
before shot 5. This gives a solid current.

OH1 V to 130V at 8ms.
Mar 29 2007 10:57:21:810AM1070329007Ian HutchinsonPlasma till rampdown.

OH1V to 120V at 7ms.
Mar 29 2007 11:07:34:497AM1070329008Ian HutchinsonPlasma till rampdown.
Mar 29 2007 11:55:49:933AM1070329009Ian HutchinsonLoad segment 2 from 1060728023.
Load.
Plasma till rampdown.

Zcur to -0.014m from -0.009m (5mm lower)
OH1V to 110V.
Mar 29 2007 12:12:08:637PM1070329010Ian HutchinsonPlasma till rampdown. Runaways are quite bad. A substantial bounce.

ZXL lowered to -.015 from -.01, i.e. by 5mm.

OH1V to 90V.
Mar 29 2007 12:25:29:170PM1070329011Ian HutchinsonPlasma till rampdown.

Zcur to -.019 (additional -5mm). Zxl to -.02 (additional -5mm).

OH2V to 20V from 26V.
Mar 29 2007 12:42:44:887PM1070329012Ian HutchinsonPlasma till rampdown.

Moved RXU greater by 2cm.
OH2V to 10V
Mar 29 2007 12:56:27:120PM1070329013Ian HutchinsonPlasma till rampdown. Shape did change.

RXU to .025 (additional 2cm outward).
Rcur offset to 1800 in segment 1.
Mar 29 2007 01:03:47:637PM1070329014Ian HutchinsonPlasma till rampdown. Bounce fixed. Low runaways.

Lower Zxl a further 5mm to -.025.
Mar 29 2007 01:21:09:997PM1070329015Ian HutchinsonPlasma till rampdown.

Raise nl04 to 7e19.
Mar 29 2007 01:35:39:247PM1070329016Ian HutchinsonPlasma till rampdown. Did not get high enough density. Got a tiny H-mode.


Raise nl04 to 8e19.
Mar 29 2007 01:44:41:153PM1070329017Ian HutchinsonPlasma to rampdown. Got 7e19 nl04.

Raise nl04 to 1e20.
Mar 29 2007 01:57:13:527PM1070329018Ian HutchinsonPlasma till rampdown. Got 8.7e19 nl04.

Raise nl04 demand to 1.35e20.
Mar 29 2007 02:22:40:200PM1070329019Ian HutchinsonDisruption at .85s. Hit by a brick.

nl04 to 1.30e20.
Mar 29 2007 02:41:50:717PM1070329020Ian HutchinsonFizzle.

Rcur offset to 1500.
Mar 29 2007 03:00:35:683PM1070329021Ian HutchinsonDisrupts at 1.56s

Chopper V offset to 0.
Zcur3 P to 3 from 4, D to 5.5 from 6.
Mar 29 2007 03:12:34:607PM1070329022Ian HutchinsonFizzle.

EF3V to 2600 from 2800.
Mar 29 2007 03:15:51:090PM1070329023Ian HutchinsonFizzle. Very little current rise.

ICEF4 to -1340 from -1335.
Mar 29 2007 03:41:51:653PM1070329024Ian HutchinsonFizzle.

Lower gas fill puff to 20ms from 24ms
Mar 29 2007 04:01:42:060PM1070329025Ian HutchinsonDisruption. Vertical instability is not fixed by the Marco-recommended tweaks
to P and D on fast zcur.

nl04 to 3e19
icEF4 to -1345A.
Mar 29 2007 04:19:27:820PM1070329026Ian HutchinsonFizzle.

EF3V to 2400 at 5ms.
Mar 29 2007 04:43:36:143PM1070329027Ian HutchinsonFizzle.

Br offset to -.0003 from -.0007
EF3V to 2200 at 5ms 2400 at -1ms.
Mar 29 2007 04:47:19:363PM1070329028Ian HutchinsonPlasma Disrupts at 1.4s. Density is remarkably high despite no gas.

There are problems with magnetics for this shot BP14_bc is broken.
End the run at 4:40 and look into the problems.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:13:05:967AMPlasmaOk
209:26:14:887AMPlasmaOk
309:42:36:823AMPlasmaOk
409:58:14:857AMPlasmaOk
510:11:43:247AMPlasmaOk
610:25:27:590AMPlasmaOk
710:40:31:230AMPlasmaOk
810:53:48:467AMPlasmaOk
911:43:07:793AMPlasmaOk
1011:56:25:107AMPlasmaOk
1112:10:11:870PMPlasmaOk
1212:23:05:717PMPlasmaOk
1312:36:22:670PMPlasmaOk
1412:49:15:730PMPlasmaOk
1501:01:55:323PMPlasmaOk
1601:14:42:590PMPlasmaOk
1701:28:16:433PMPlasmaOk
1801:42:23:653PMPlasmaOk
1901:55:09:293PMPlasmaOk
2002:20:53:293PMPlasmaOk
2102:33:45:120PMPlasmaOk
2202:52:45:090PMPlasmaOk
2303:05:36:433PMPlasmaOk
2403:18:40:543PMPlasmaOk
2503:31:19:747PMPlasmaOk
2604:04:32:793PMPlasmaOk
2704:17:13:573PMPlasmaOk
2804:29:42:970PMPlasmaOk

System Availability
Mar 29 2007 09:12:42:217AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels calibrated and working expect for Ch 10 that has bad amp)Mar 28 2007 11:02AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 3-8 operational, cross-calibrated. Mar 27 2007 03:12PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational.Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnowill check out system on shots with plasmaMar 11 2007 10:36PM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged.Mar 12 2007 10:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoTests proceeding during shot cycles. Expect some channels available on Mar. 30. Mar 29 2007 08:38AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes


Mar 29 2007 09:57:57:670AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels calibrated and working expect for Ch 10 that has bad amp)Mar 28 2007 11:02AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 3-8 operational, but signals are low and noisy today. Mar 29 2007 09:43AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts.Mar 29 2007 09:42AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnowill check out system on shots with plasmaMar 11 2007 10:36PM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged.Mar 12 2007 10:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoTests proceeding during shot cycles. Expect some channels available on Mar. 30. Mar 29 2007 08:38AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes


Mar 29 2007 10:40:13:357AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels calibrated and working expect for Ch 10 that has bad amp)Mar 28 2007 11:02AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 3-8 operational, but signals are low and noisy on SOME shots today. Ch 2 is now also working but showing up as Ch 1. Mar 29 2007 10:39AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts.Mar 29 2007 09:42AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnowill check out system on shots with plasmaMar 11 2007 10:36PM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged.Mar 12 2007 10:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoTests proceeding during shot cycles. Expect some channels available on Mar. 30. Mar 29 2007 08:38AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes


Mar 29 2007 11:42:38:667AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels calibrated and working expect for Ch 10 that has bad amp)Mar 28 2007 11:02AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 3-8 operational, but signals are low and noisy on SOME shots today. Ch 2 is now also working.Mar 29 2007 11:09AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts.Mar 29 2007 09:42AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonnowill check out system on shots with plasmaMar 11 2007 10:36PM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. The gas plenum needs to be purged.Mar 12 2007 10:08PM (labombard)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoTests proceeding during shot cycles. Expect some channels available on Mar. 30. Mar 29 2007 08:38AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes


Mar 29 2007 11:56:04:857AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels calibrated and working expect for Ch 10 that has bad amp)Mar 28 2007 11:02AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 3-8 operational, but signals are low and noisy on SOME shots today. Ch 2 is now also working.Mar 29 2007 11:09AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts.Mar 29 2007 09:42AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesstill a problem with the post shot script; this is being fixed by hand at presentMar 29 2007 11:45AM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoTests proceeding during shot cycles. Expect some channels available on Mar. 30. Mar 29 2007 08:38AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes


Mar 29 2007 12:09:50:670PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels calibrated and working expect for Ch 10 that has bad amp)Mar 28 2007 11:02AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 3-8 operational, but signals are low and noisy on SOME shots today. Ch 2 is now also working.Mar 29 2007 11:09AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts.Mar 29 2007 09:42AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesstill a problem with the post shot script; this is being fixed by hand at presentMar 29 2007 11:45AM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoTests proceeding during shot cycles. Expect some channels available on Mar. 30. Mar 29 2007 08:38AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
Vispecno Mar 29 2007 12:00PM Alex GrafVisible Spectrometeragraf


Mar 29 2007 01:42:03:370PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels calibrated and working expect for Ch 10 that has bad amp)Mar 28 2007 11:02AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 2-8 operational, but signals are low and noisy on SOME shots today. Mar 29 2007 01:41PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts.Mar 29 2007 09:42AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesstill a problem with the post shot script; this is being fixed by hand at presentMar 29 2007 11:45AM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno Jan 23 2007 02:24PM (g)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoTests proceeding during shot cycles. Expect some channels available on Mar. 30. Mar 29 2007 08:38AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
Vispecno Mar 29 2007 12:00PM Alex GrafVisible Spectrometeragraf