Alcator C-Mod Run 1070330 Information

Back to runs

Miniproposals
Miniproposal:464
Date Filed: 3/8/2007
Title:LHCD Coupling Optimization
First Author:Greg Wallace
Session Leader:Greg Wallace (shots 1-11)
Miniproposal:473
Date Filed: 3/9/2007
Title:Lower Hybrid System Check-out and Initial operation
First Author:J. Randall Wilson
Session Leader:J. Randall Wilson (shots 12-18)
Session Leader:Greg Wallace (shots 19-23)

Operators
Session leader(s):Greg Wallace,J. Randall Wilson,Greg Wallace
Physics operator(s):Ron Parker
Engineering operator(s):Ed Fitzgerald,Gary Dekow

Engineering Operator Run Comment
MP 473: Lower Hybrid Check-out and Initial Operation SL Wilson PO Parker

Session Leader Plans
Entered: Mar 29 2007 05:17:29:003PM
Author: J. Randall Wilson
Begin by completing mp 464 Lower hybrid couplin studies G Wallace

then continue mP 473 LH checkout and initial ops
These shots will concentrate on co conditioning at higher density.
vary phasing more than on 10/28
If ICRF at all available will check out possible interference

Entered: Mar 30 2007 09:45:12:293AM
Author: Greg Wallace
Continuation of yesterday's run. Complete density scan from yesterday with grill 2mm behind limiter (repeat shots 15,16,17,18), then turn things over to Randy for the afternoon.

Physics Operators Plans
Entered: Mar 29 2007 04:18:38:607PM
Author: Ron Parker
Engineering setup for Friday 30 March 2007

MP 473: Lower Hybrid Check-out and Initial Operation

Session leader: Wilson
Physics operator: Parker

ECDC overnight in D2, pressure=2e-4 Torr. Rmin/Rdwell/Rmax = 44/45/103 cm.
Bake at 60 C.

The run will start at 09:00 and end at 17:00.

Power systems as on 1070329012.

A-coil configuration: normal [Dtop -Dbot -Jtop +Jbot] and enabled.

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
NINJA pumped out disabled

Enable the following gate valves and shutters: ECE, VUV, Z-bolo shutters

Torvac setup: Gate valves open during pulse.

-------------------------------------------------------------------------------
ICRF Setup: None

LH Setup: Plan to operate with power up to 2 MW
___________________________________

Start from shot 1070329012 as lower hybrid target.

Purpose of run is to begin process of bringing LH power and pulse length up to and ultimately exceeding levels achieved in the last run campaign. Some piggy backing in support of MP's 464, 467 and 468 will occur.

Session Leader Summaries
Entered: Mar 30 2007 06:23:13:870PM
Author: Greg Wallace
Started the run this morning to complete day 1 of lower hybrid coupling studies. Completed density scans with grill 2mm and 1.5mm behind LH limiter. Got reflection coef down to 11-12% at 90 degree phasing using plasma shape from 1070329018 but with grill 1.5mm behind limiter. This is the best result we've gotten so far.

Switch to Randy's MP at shot 12 and increased net power up to 550kW. Reflection coeffecients started low early in pulse but would rise to ~15% by the end of the pulse. Two interesting phenomena of note:
Bright lines are seen across the LH grill while power is on. These are clearly from LH since they disappear when LH system trips out.
Oscillations are observed in the top and bottom reflection coef, but these oscillations are out of phase such that the total refco stays constant. Interestingly the top and bottom LH langmuir probe densities oscillate with the same period but in phase with each other.

Several fizzles late in the day but still got good data. Tried to run ICRF and LH concurrently on last shot but was thwarted by a fizzle.

Physics Operator Summaries
Entered: Mar 30 2007 04:40:13:153PM
Author: Ron Parker
Shot 20 ran with LH power ramping from 450 - 900 kW at FINTs.
Entered: Mar 30 2007 04:41:12:543PM
Author: Ron Parker
Shot 21 fizzled -- effect of last LH pulse?
Entered: Mar 30 2007 05:06:18:667PM
Author: Ron Parker
The run was somewhat laborious with a slow start and a few delays.

The first problem was the discovery during a magnetics test that the OH1 current did not track the PLC programmed value. This was traced to a software problem, but resulted in a delay of 2.5 hours. The first 3 shots were used for PLC control tests and the first plasma shot was shot 4. Shots 4-13 ran well, with the exception of one fizzle blamed on the firing of the NB into gas between shots (?). These shots produced useful data for Greg's miniproposal on optimizing LH coupling as a function of grill position and density. On shot 13 a TF fuse blew and had to be replaced resulting in ~ 1 hour delay (including 50 kA test shot). Beginning with shot 16, the rest of the run was devoted to bringing up the LH power and pulse length. Om shot 17 ,the plasma disrupted near the end of the LH pulse (~ 900 kW at FINTs) and 2 subsequent pulses fizzled. Finally a full length shot was obtained on shot 20, with the LH ramping from ~ 450 kW to 0.9 MW over 400 ms at the FINT's. Shot 21 fizzled, possibly due to residual effect of last LH shot? Shot 22 ran well with LH power ramping from 500 to 1000+ kW over 400 ms, but shot 23, the last shot of the run predictably fizzled.




Session Leader Comments
Mar 30 2007 11:30:29:670AM1070330004Greg WallaceCPS was enabled and all segments tripped. Will disable CPS system and retry the same shot again. Disruption occured during rampdown. Otherwise plasma looked good with nl_04 3.5e19 m^-2 and density on top LH probes of about 2e17 and 4e17 on lower probes.
Mar 30 2007 12:23:15:950PM1070330005Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Repeat of shot 15 from yesterday with launcher at 2mm behind limiter.

Reflection coef:
Phase
60 90 120
AB
30% 50% 75%
CD
16% 35% 55%

Density 1.5-2.5e17 on top LH probes, 3-4e17 on lower LH probes. nl_04 .32e20 m^-2.
Mar 30 2007 12:22:55:230PM1070330006Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Repeat of shot 16 from yesterday with launcher at 2mm behind limiter.

Reflection coef:
Phase
60 90 120
AB
15% 27% 40%
CD
15% 22% 40%

Density 5-7e17 on top LH probes, 5-7e17 on lower LH probes. nl_04 .8e20 m^-2.
Mar 30 2007 12:28:05:497PM1070330007Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Repeat of shot 17 from yesterday with launcher at 2mm behind limiter.

Reflection coef:
Phase
60 90 120
AB
14% 20% 30%
CD
15% 20% 30%

Density 1-1.5e18 on top LH probes, .9-1e18 on lower LH probes. nl_04 .8e20 m^-2.
Mar 30 2007 12:44:31:510PM1070330008Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Repeat of shot 18 from yesterday with launcher at 2mm behind limiter.

Reflection coef:
Phase
60 90 120
AB
19% 12% 19%
CD
19% 12% 17%

Density 4-6e18 on top LH probes, 3-4.5e18 on lower LH probes. nl_04 1.05e20 m^-2.
Mar 30 2007 01:12:53:357PM1070330009Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Repeat of shot 16 from yesterday with launcher at 1.5mm behind limiter.

Reflection coef:
Phase
60 90 120
AB
15% 25% 38%
CD
15% 20% 30%

Density 1e18 on top LH probes, .6-.8e18 on lower LH probes. nl_04 .8e20 m^-2.
Mar 30 2007 01:27:35:747PM1070330010Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Repeat of shot 17 from yesterday with launcher at 1.5mm behind limiter.

Reflection coef:
Phase
60 90 120
AB
15% 15% 25%
CD
17% 15% 23%

Density 1.5-2.5e18 on top LH probes, 1-1.5e18 on lower LH probes. nl_04 .87e20 m^-2.
Mar 30 2007 01:43:20:700PM1070330011Greg WallacePhase shifters set for 90deg current drive. Six segment pulse (10 ms @ 25% duty cycle), phasing at 60, 90, 120 repeated twice during shot.

Repeat of shot 18 from yesterday with launcher at 1.5mm behind limiter.

Reflection coef:
Phase
60 90 120
AB
21% 12% 17%
CD
22% 12% 16%

Density 7-10e18 on top LH probes, 5-6e18 on lower LH probes. nl_04 1.e20 m^-2.
Mar 30 2007 01:46:34:420PM1070330012J. Randall Wilsonset up for 90 co steady long pulse
re-enable cps
use previous shot as reflection for 90 co was low (~0.11)

fizzle
Mar 30 2007 02:11:09:527PM1070330013J. Randall Wilsonset up for 90 co steady long pulse (0.4 s)
re-enable cps
use previous shot as reflection for 90 co was low (~0.11)

good (0.25 MW)
Mar 30 2007 03:41:01:183PM1070330016J. Randall Wilson

good (0.39 MW)
Mar 30 2007 03:55:16:323PM1070330017J. Randall Wilsonone arc early then inside arc late causing disruption

Plh= 0.5 MW
Mar 30 2007 04:00:07:497PM1070330018J. Randall Wilsondisrupt before lh
Mar 30 2007 04:37:27:120PM1070330020Greg Wallace90 degree current drive shot. One trip out at .87s, Interesting striations on WIDE2 video across grill are modulated with LH power. Density on LH probes of ~3-8e18 m^-3.

Reflection coef is around 15%. See same phenomenon as before on second half of shot. (Top and bottom refco osciliate out of phase by pi.)
Mar 30 2007 05:04:57:653PM1070330022Greg WallaceClean shot up to 550 kW net power. Reflection coef around 12% rising to 16%. nl_04 1.08e20 m^-2 and LH probes near 6-8e18.

Physics Operator Comments
Mar 30 2007 09:07:26:920AM1070330001Ron ParkerThe first shot will be a PLC controlled 10 kA OH1 only, no commutation, to check yesterday's magnetics problem and subsequent fix.
Mar 30 2007 09:09:29:043AM1070330001Ron ParkerWe have set up the first plasma shot to reproduce 1070329015. The first few shots will be devoted to finish Greg's run from 1070329, which was aborted due to a problem with magnetics. Greg's shots will reproduce shots 15-18 from yesterday.
Mar 30 2007 09:31:38:090AM1070330001Ron ParkerThe first shot will be a PLC controlled 10 kA OH1 only, no commutation, to check yesterday's magnetics problem and subsequent fix.

Delay in getting going this AM due to data system problems and LH people in cell putting in battle shorts.
Mar 30 2007 10:21:45:840AM1070330001Ron ParkerThe test shot was successful as far as the magnetics were concerned, but did not hold OH1 current at 10 kA as set by the PLC. This problem is being trouble shot.

We'll try another test shot after the problem is fixed.
Mar 30 2007 10:27:42:467AM1070330002Ron ParkerShot 2 regulated at ~ 10 kA as programmed. A few magnetics errors came up, but may be due to low OH current.
Mar 30 2007 10:30:58:623AM1070330002Ron ParkerShot 3 should be a plasma shot.
Mar 30 2007 10:39:58:640AM1070330003Ron ParkerShot 3 didn't go because OH1 current was still limited at 10 kA.

Try again on next shot.
Mar 30 2007 10:49:34:150AM1070330003Ron ParkerShort (hopefully) delay while Yuri and Joe trouble shoot the OH1 current programming problem.
Mar 30 2007 11:17:53:920AM1070330003Ron ParkerReady for a shot!
Mar 30 2007 11:42:04:920AM1070330004Ron ParkerShot 4 ran well, but disrupted in rampdown.

CPS shut LH off -- since LH is at low power, CPS will be disabled.
Mar 30 2007 11:56:36:683AM1070330005Ron ParkerShot 5 ran full length.

Next: Reproduce shot 1070329016
Mar 30 2007 12:15:36:230PM1070330007Ron ParkerShot 6 ran full length.

Next: reproduce shot 1070329017
Mar 30 2007 12:21:13:153PM1070330007Ron ParkerShot 7 ran full length.

Next: Reproduce shot 1070329018
Mar 30 2007 12:59:16:887PM1070330008Ron ParkerShot ran well, disrupting at 250 kA.

Next: Push grill in 0.5 mm to 1.5 mm behind LH limiter. Short cell access.
Mar 30 2007 01:07:54:857PM1070330009Ron ParkerShot 9 ran well.

Next: Reload shot 1070330007
Mar 30 2007 01:22:06:607PM1070330010Ron ParkerShot 10 ran full length.

Next: Repeat shot 8 (with grill 0.5 mm closer to LH limiter)
Mar 30 2007 01:42:19:747PM1070330011Ron ParkerShot 11 ran well, disrupting at 200 kA in rampdown.

Randy taking over from Greg. Next: 40 kW/klystron, 400 ms pulse.

Repeat shot 11.
Mar 30 2007 01:46:24:230PM1070330012Ron ParkerShot 12 fizzled, suspect between shot pulsing of beam into vacuum.
Mar 30 2007 02:25:20:823PM1070330013Ron ParkerShot 13 went, as did RF.

Next: LH power increased to 600 kW

Short delay to check fiber in power room.

Bad fuse in TF cabinet needs to be replaced. Short delay just became longer (+10 min).
Mar 30 2007 03:01:49:870PM1070330013Ron ParkerNext shot will be a PLC controlled 50 kA TF test.
Mar 30 2007 03:08:59:980PM1070330014Ron ParkerFuse repaired, plasma shot coming up.
Mar 30 2007 03:20:35:653PM1070330015Ron ParkerShot 15 was a weak fizzle. No apparent reason, try again.
Mar 30 2007 03:45:26:403PM1070330016Ron ParkerShot 16 went through nicely, with LH power at ~700 kW at the FINT's and.

More LH power next shot.
Mar 30 2007 03:47:58:073PM1070330017Ron ParkerShot 17 ended in a disruption caused by LH
Mar 30 2007 03:59:35:997PM1070330018Ron ParkerDisrupted again, well before LH (@0.45 s)
Mar 30 2007 04:13:59:683PM1070330019Ron ParkerShot 19 fizzled. Try again (LH power ramped from 450 - 900 kW over 400ms)
Mar 30 2007 04:58:57:387PM1070330022Ron ParkerShot 22 ran well, LH power ramped from 500 to 1000+ kW over 400 ms. It's possible to see a slight reduction in loop voltage, but this may be in the mind of the (or rather this) observer.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:46:44:043AMTestOkOH1 PLC test 1KV, 1,OO0 KA
210:21:45:937AMTestOkOH1 PLC test 1KV, 1,000KA
310:32:09:037AMPlasmaBadOH1
411:22:33:980AMPlasmaOk
511:42:40:980AMPlasmaOk
612:02:42:027PMPlasmaOk
712:15:28:107PMPlasmaOk
812:28:00:920PMPlasmaOk
912:58:09:823PMPlasmaOk
1001:14:30:793PMPlasmaOk
1101:27:05:527PMPlasmaOk
1201:43:08:667PMPlasmaOk
1301:59:23:450PMPlasmaOk
1403:03:37:213PMTestOkTF Test
1503:16:02:103PMPlasmaOk
1603:29:17:950PMPlasmaOk
1703:41:37:903PMPlasmaOk
1803:54:23:480PMPlasmaOk
1904:11:19:670PMPlasmaOk
2004:24:32:387PMPlasmaOk
2104:37:19:230PMPlasmaOk
2204:49:55:090PMPlasmaOk
2305:03:26:043PMPlasmaOk
2409:04:17:777AMTestBad
2509:14:35:497AMTestBad
2609:24:05:277AMTestBad
2709:35:57:650AMTestBad

System Availability
Mar 30 2007 09:46:22:373AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. We will do the first LN2 cool-down tests manually.Mar 13 2007 09:55PM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels calibrated and working expect for Ch 10 that has bad amp)Mar 28 2007 11:02AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational. Cross-calibration with G-Side MKS gauge is needed. Mar 13 2007 10:02PM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 2-8 operational, but signals are low and noisy on SOME shots today. Mar 29 2007 01:41PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts.Mar 29 2007 09:42AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesstill a problem with the post shot script; this is being fixed by hand at presentMar 29 2007 11:45AM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains openMar 29 2007 07:41PM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoDAQ timing interface not currently working; will try to resolve as soon as possibleMar 30 2007 01:36AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
Vispecno Mar 29 2007 12:00PM Alex GrafVisible Spectrometeragraf


Mar 30 2007 11:22:11:653AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSnoThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Mar 06 2007 08:09PM (rowan)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels calibrated and working expect for Ch 10 that has bad amp)Mar 28 2007 11:02AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 2-8 operational, but signals are low and noisy on SOME shots today. Mar 29 2007 01:41PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs today for LH expts.Mar 29 2007 09:42AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanoNeed to tune from 70 to 78 MHz. Loop not finished.Mar 16 2007 09:31AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem available for low power, short pulse testing into plasmaMar 28 2007 07:18AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesstill a problem with the post shot script; this is being fixed by hand at presentMar 29 2007 11:45AM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains openMar 29 2007 07:41PM (jinseok)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesCalibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts startMar 13 2007 08:23AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCIno Jan 14 2007 02:03PM Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written...Mar 15 2007 09:11PM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - CorenoDAQ timing interface not currently working; will try to resolve as soon as possibleMar 30 2007 01:36AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 2. Mar 26 2007 08:31AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
Vispecno Mar 29 2007 12:00PM Alex GrafVisible Spectrometeragraf