| Session Leader Comments |
| Apr 5 2007 09:37:36:557AM | 1070405002 | Ronald Bravenec | No-power shot
|
| Apr 5 2007 10:03:02:597AM | 1070405003 | Ronald Bravenec | First shot with DNB
No indication of fluctuations between 100 and 300 kHz
|
| Apr 5 2007 10:13:14:100AM | 1070405004 | Ronald Bravenec | Tuned mics as follows:
chan mic.
5 5.8
6 5.8
7 5.8
8 5.8
DNB
No indication of fluctuations between 100 and 300 kHz
|
| Apr 5 2007 10:27:39:607AM | 1070405005 | Ronald Bravenec | nl_04 ~ 1.2
DNB
Marfe!
|
| Apr 5 2007 10:37:43:240AM | 1070405006 | Ronald Bravenec | lower nl_04 to ~ 1
DNB
Marfe!
|
| Apr 5 2007 10:50:09:073AM | 1070405007 | Ronald Bravenec | Exchanged fibers into channels 1-4 and 5-8
Tuned mics 5-8 to 5.3
lower nl_04 to ~ 1
DNB
Fizzle ...
|
| Apr 5 2007 11:08:58:220AM | 1070405008 | Ronald Bravenec | nl_04 ~ 0.6
DNB
No fluctuations between 100 and 300 kHz
|
| Apr 5 2007 11:20:34:910AM | 1070405009 | Ronald Bravenec | nl_04 ~ 0.6
DNB
No fluctuations between 100 and 300 kHz
|
| Apr 5 2007 11:33:31:933AM | 1070405010 | Ronald Bravenec | nl_04 ~ 0.8, Ip to 0.7 MA, Rsep to 0.9 m
DNB
Fizzle ...
|
| Apr 5 2007 12:05:50:340PM | 1070405011 | Ronald Bravenec | nl_04 ~ 0.8, Ip to 0.7 MA, Rsep to 0.9 m
DNB
Marfe at 0.50 - 0.75 s
no flucts.
|
| Apr 5 2007 12:11:14:670PM | 1070405012 | Ronald Bravenec | Good, DNB
no flucts.
|
| Apr 5 2007 12:18:00:890PM | 1070405013 | Ronald Bravenec | nl_04 ~ 0.4
DNB
Disrupt.
|
| Apr 5 2007 01:12:06:290PM | 1070405014 | Ronald Bravenec | nl_04 ~ 0.5
DNB
maybe flucts. 50-200 kHz?
|
| Apr 5 2007 01:08:15:103PM | 1070405015 | Ronald Bravenec | Moved fiber array to innermost postion
nl_04 ~ 0.5
DNB
nice beam/background but no flucts.
|
| Apr 5 2007 01:21:49:700PM | 1070405016 | Ronald Bravenec | Tuned filters 5-8 to 5.8
Repeat
DNB
No flucts.
|
| Apr 5 2007 01:31:19:033PM | 1070405017 | Ronald Bravenec | Tuned filters 5-8 to 4.8
DNB
Even better beam/background but no flucts.
|
| Apr 5 2007 03:13:00:007PM | 1070405018 | Dennis Whyte | 1 MA VDE
Halo current monitor shows the VDE was downward as requested
Gate valves were closed. However the pressure seemed to droop
over the five minutes after the VDE. Cause is uncertain.
RGA on the bypass did not work. I'll enter the relative
partial pressures in the post-disruption plasma (with gate
valves closed) from the RGA screen
M2 9.7e-6
M3 1.09e-5
M4 7.14e-6
Post-shot gas inventory = 40 Torr-L
|
| Apr 5 2007 02:21:44:560PM | 1070405019 | Dennis Whyte | Fizzle
Nice check on global particle balance.
Injected gas = 2 Torr-L
Recovered gas = 2 Torr-L
|
| Apr 5 2007 03:13:38:803PM | 1070405020 | Dennis Whyte | 1 MA downward VDE
pre-fill decreased to 21 ms from 22 ms.
H/H+D seems to have increased from 0.21 to 0.35?
(check diagnostic)
38 Torr-L recovered
10 Torr-L D2 injected
RGA
M2 1.06e-5
M3 1.12e-5
M4 6.06e-6
|
| Apr 5 2007 02:44:16:100PM | 1070405021 | Dennis Whyte | Fizzle
|
| Apr 5 2007 02:55:39:570PM | 1070405022 | Dennis Whyte | Fizzle
Still tracking down the RGA problem. This is a critical
diagnostic since without it we are blind as to the
relative amount of H and D we are removing.
|
| Apr 5 2007 03:21:45:603PM | 1070405023 | Dennis Whyte | Dud
|
| Apr 5 2007 03:28:47:013PM | 1070405024 | Dennis Whyte | Fizzle
Since D2 is injected on the fizzles I'll note for reference
the mass ratios on the RGA after the fizzle/shot
with gate valves closed
M2 4.8e-8
M3 1.8e-7
M4 4.8e-8
|
| Apr 5 2007 04:25:11:627PM | 1070405025 | Dennis Whyte | Fizzle
|
| Apr 5 2007 04:25:19:800PM | 1070405026 | Dennis Whyte | Fizzle
|
| Apr 5 2007 04:47:52:027PM | 1070405027 | Dennis Whyte | Fizzle.
|
| Apr 5 2007 04:58:46:420PM | 1070405028 | Dennis Whyte | 1 MA VDE, downward going.
Wth ~ 42 kJ
Total injected D2: 7. 8 Torr L
Vessel gas inventory post disruption: 18.2 Torr-L
RGA post VDe
M2 2.3e-6
M3 4.5e-6
M4 4.5e-6
|
| Apr 5 2007 05:05:20:940PM | 1070405029 | Jin-Seok Ko | Beam into gas spectrum measurement : This is to verify that
the blue features on the spectrum goes away with the 7 deg
tilted beam. (MP#460)
Configurations:
1. MSE
- Shutter OPEN
- PEM OFF
- No fixed polarizer
- Ch 7 fiber bundle to the spectrometer
2. Beam
- 50 keV, 5A
- Long pulse (0.5 ~ 1.5 sec)
3. Spectromter
- Slit size : 200 micron
4. Tours
- 1 mTorr He
- TF = 5.4T, EF3 = 12 kA, EF4 = 5 kA
- Load 1060725008
Result:
The beam failed to syncronize the cmod cycle.
We will try again.
|
| Apr 5 2007 05:21:24:547PM | 1070405030 | Jin-Seok Ko | No spectrum signal detected!
|
| Apr 5 2007 05:48:01:470PM | 1070405031 | Steve Wolfe |
Shot#31: Test with drawn pulse at -2 sec (.5sec wide)
Breakers will be in, air switch open.
TMX contactors closed, PLC control set to 0kA.
Just to be sure, PCS program also at zero current and voltage.
f.d. is at 0.08 and invert times set close to start times,
all of which are after -1sec.
We are not putting Bill inside, he can monitor everything from control room.
Result: EF3 breaker came out early
PF and TF breakers popped out on schedule.
TMX contactors stayed in! Not good.
Bill will simulate a ground fault in the power room.
|
| Apr 5 2007 06:06:33:180PM | 1070405032 | Steve Wolfe |
Shot#32: Change pulse width to 1 sec pulse.
Will try again for TMX's. Response to gf fault was there but maybe slow.
Got a type 2 from I^2t on entry to INIT.
Push it on through, get the TF back on ross relay, and take another one.
|
| Apr 5 2007 06:16:36:060PM | 1070405033 | Steve Wolfe |
Shot#33: Change pulse width to 1 sec pulse.
Will try again for TMX's. Response to gf fault was there but maybe slow.
TMX's still did not come out. Everybody else saw type 2
|
| Apr 5 2007 06:18:09:933PM | 1070405033 | Steve Wolfe |
Shot#33: Change pulse width to 1 sec pulse.
Will try again for TMX's. Response to gf fault was there but maybe slow.
TMX's still did not come out. Everybody else saw type 2
Next: stretch to 2sec wide
|
| Apr 5 2007 06:27:39:407PM | 1070405034 | Steve Wolfe |
Shot#34: Change pulse width to 2 sec pulse.
Supply start invert and f.d. pushed later accordingly.
TMX's still did not come out. Probably not the timing.
Next: Put in manual bypass and test that.
|
| Apr 5 2007 06:37:24:863PM | 1070405035 | Steve Wolfe |
Shot#35: Manual bypass in, leave pulse at 2 sec.
If this works we should NOT see type 2 on other supplies.
No faults showing. Bypass mode works.
Call it as night. Do further testing another day.
Bill will investigate why TMX contactors don't open.
Bill Rowan has loaded back an older shot with no waveform
on output_31 and the Bypass is left in until we test the
software.
|
| Physics Operator Comments |
| Apr 5 2007 08:38:22:587AM | | Bill Rowan | oaded from shot 1070404021 using segments 1 and 2 for MP474
loaded segment 3 from segment 2 of shot 1050211026 for MP 412a
recalculated predictors for
rcur
zcur
zcur
br0
bz0
clearin, did not replace offset
zxl
zxl
rxu
zxu
then removed offset from IP
|
| Apr 5 2007 08:46:54:357AM | | Bill Rowan | the DNB gate valve will be enabled on the first shot, but disabled at the beam control.
yesterday, beam shots into the torus without plasma were correlated with high z on the rga
today, we will not open the dnb gate valve until we get plasma shots
|
| Apr 5 2007 09:14:29:867AM | 1070405001 | Bill Rowan | found a-coil programming was set for plc control. Amanda noted sawtooth quench indicated a locked mode.
next shot: DNB on
change the a-coil programming from plc control to hybrid
|
| Apr 5 2007 10:40:02:210AM | 1070405001 | Bill Rowan | 001. full length shot. some hard x-rays early (tv camera detection)
Ninja on for this shot.
|
| Apr 5 2007 09:58:26:580AM | 1070405002 | Bill Rowan | There was an attempt at shot 003. That was also a no power shot.
Dispatcher problems. Did not have a new shot number on this second attempt.
Next shot: No additional changes.
|
| Apr 5 2007 10:40:33:960AM | 1070405002 | Bill Rowan | 002. No power shot. Action monitor.
Ninja off for this shot
Next shot: no additional changes.
|
| Apr 5 2007 10:00:34:220AM | 1070405003 | Bill Rowan | 003. Full length plasma.
DNB into discharge. BES signal evident. nl_04=0.6e+20
Next shot: No additional changes.
|
| Apr 5 2007 10:14:13:290AM | 1070405004 | Bill Rowan | 004. Full length plasma.
Possible data ready widget failure.
Prefill pressure creeping up
PG4 at 21 ms producing 0.047 mT. Started the day at 0.04 mT
Next shot. Reduce the prefill by 1 ms (pg4)
|
| Apr 5 2007 10:16:41:400AM | 1070405004 | Bill Rowan | SL requested increase of density.
nl_04 from 0.6 e+20 demand to 1.2e+20 demand
|
| Apr 5 2007 10:39:20:117AM | 1070405005 | Bill Rowan | 005. Disruption at 1.3 s
ninja on for this shot
next shot. SL requests nl_04=1.0e+20
|
| Apr 5 2007 10:39:35:630AM | 1070405006 | Bill Rowan | 006. Disruption at 0.63 s
ninja still on for this shot
next shot. Ninja off.
|
| Apr 5 2007 10:53:12:510AM | 1070405007 | Bill Rowan | 007. Fizzle.
|
| Apr 5 2007 11:00:35:043AM | 1070405007 | Bill Rowan | Next shot. nl_04 = 0.6e+19
|
| Apr 5 2007 11:05:10:360AM | 1070405008 | Bill Rowan | 008. Full length plasma.
|
| Apr 5 2007 11:09:02:487AM | 1070405008 | Bill Rowan | Next shot.
nl_04 = 0.9e+20. Density coming up slowly -- 0.6 s
|
| Apr 5 2007 11:19:12:757AM | 1070405009 | Bill Rowan | 009. Full length plasma.
|
| Apr 5 2007 11:22:32:053AM | 1070405009 | Bill Rowan | Next shot.
IP = 700 kA
nl_04 = 0.8e+20
|
| Apr 5 2007 11:28:21:650AM | 1070405009 | Bill Rowan | ncreased Rcur to reduce the outer gap by 1 cm
|
| Apr 5 2007 11:38:43:790AM | 1070405010 | Bill Rowan | 010. Fizzle
Next shot.
increase prepuff to 22 ms
|
| Apr 5 2007 11:50:17:363AM | 1070405011 | Bill Rowan | 011. Plasma full length. Marfe reappeared
SL agrees with outer gap
Next shot.
nl_04 = 0.7e+20
|
| Apr 5 2007 12:01:45:823PM | 1070405012 | Bill Rowan | 012. Plasma full length
Next shot.
nl_04 = 0.4e+20
|
| Apr 5 2007 12:22:18:300PM | 1070405013 | Bill Rowan | 013. Disruption at 0.63 s
Nothing apparent
|
| Apr 5 2007 01:05:49:333PM | 1070405014 | Bill Rowan | 014, Full length shot.
nl+04 = 0.5 e+20
next shot.
cell access before next shot
|
| Apr 5 2007 01:05:24:803PM | 1070405015 | Bill Rowan | 015. Full length plasma
next shot.
No DPCS changes.
|
| Apr 5 2007 01:15:57:810PM | 1070405016 | Bill Rowan | 016. Full length plasma.
Next shot.
|
| Apr 5 2007 01:30:48:190PM | 1070405017 | Bill Rowan | 017. Full length plasma
Next shot.
Change to the next experiment.
New session leader: Whyte/Lipschultz
Segment 2 off; Segment 3 on.
|
| Apr 5 2007 01:43:42:727PM | 1070405017 | Bill Rowan | Next shot.
The gate values are closed for the shot + 5 minutes after.
The RGA is operated with reduced conductance fo the vessel.
Enable Ar -- B-side lower. pulse length of 65 ms at request of John Rice
|
| Apr 5 2007 01:43:56:960PM | 1070405017 | Bill Rowan | Next shot
Copied B21_Prog wire from segment 4 to segment 3
CALL'ed predictor
Changed intergrator from starting at 0.5 s to 0.2 s
Acoil manual programming set to 0
|
| Apr 5 2007 01:59:16:473PM | 1070405018 | Bill Rowan | 018. Disruption as programmed. 1.02s
Next shot.
No DPCS changes.
|
| Apr 5 2007 02:06:13:320PM | 1070405019 | Bill Rowan | 019. Fizzle
Next shot.
Reduced prefil by 1 ms
|
| Apr 5 2007 02:41:23:283PM | 1070405021 | Bill Rowan | 021. Fizzle
0.0155 s -> 0.061 mT
Started shot cycle with pressure at 2.2e-06
Next shot
Reduced prefill by 1 ms to 20 ms
|
| Apr 5 2007 02:55:07:010PM | 1070405022 | Bill Rowan | 022. Fizzle
0.0155 -> 0.055
Started shot cycle with pressure at 1.0e-06
Next shot.
Increased prefill by 2 ms to 22 ms
|
| Apr 5 2007 03:05:31:660PM | 1070405023 | Bill Rowan | 023. Nothing happened.
Next shot.
Try again.
|
| Apr 5 2007 03:26:36:027PM | 1070405024 | Bill Rowan | 024. Fizzle that almost went
Next shot.
Increase the prefill by 1 ms to 23 ms
|
| Apr 5 2007 03:53:35:787PM | 1070405025 | Bill Rowan | 025. Fizzle
Next shot
ECDC for 10 minutes before the next shot
Reduce the prefill to 21 ms
|
| Apr 5 2007 04:14:17:390PM | 1070405026 | Bill Rowan | 026. Fizzle
Next shot
Decrease the prefill to 20 ms
Reduce IC_EF4 from -1335 to -1345
|
| Apr 5 2007 04:31:35:537PM | 1070405027 | Bill Rowan | 027. Fzzle
Next shot
Reload 018
|
| Apr 5 2007 06:36:56:363PM | 1070405035 | Bill Rowan | 028. Disruption as before
Next shot.
reload 1060725008
change PG4 to 6 psi He
turn off all supplies but TF, EF4, Ef3
|
| System Availability |
| Apr 5 2007 09:04:05:503AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 04 2007 01:39PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational, cross-calibrated. | Apr 04 2007 02:08PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Apr 03 2007 03:54PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | System unavailable. CPS trip levels being reset. | Apr 03 2007 03:18PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port and K-port WASPs were sucessfully scanned during recent TF only shots. A bit more control software needs to be written... | Mar 15 2007 09:11PM (labombard) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 spatial channels. Density is not calibrated yet. Temperature should be fine. | Apr 05 2007 08:28AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 9. | Apr 05 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | no | looking around Dbeta (485.5 - 491.5 nm) since shot 19 | Apr 05 2007 08:52AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 5 2007 10:19:39:807AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 04 2007 01:39PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational, cross-calibrated. | Apr 04 2007 02:08PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Apr 03 2007 03:54PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | System unavailable. CPS trip levels being reset. | Apr 03 2007 03:18PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port WASP successfully collected data on 04/04. Working on final plunge calibration. Some intermittent open circuit on SE Electrode. No data take with K-WASP yet. | Apr 05 2007 10:18AM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 spatial channels. Density is not calibrated yet. Temperature should be fine. | Apr 05 2007 08:28AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 9. | Apr 05 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | yes | looking around B II B V (491 - 497 nm) | Apr 05 2007 10:16AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 5 2007 10:34:37:553AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 04 2007 01:39PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational, cross-calibrated. | Apr 04 2007 02:08PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Apr 03 2007 03:54PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | System unavailable. CPS trip levels being reset. | Apr 03 2007 03:18PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port WASP successfully collected data on 04/04. Working on final plunge calibration. Some intermittent open circuit on SE Electrode. No data yet taken with K-WASP. | Apr 05 2007 10:19AM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 spatial channels. Density is not calibrated yet. Temperature should be fine. | Apr 05 2007 08:28AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 9. | Apr 05 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | yes | looking around B II B V (491 - 497 nm) | Apr 05 2007 10:16AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 5 2007 11:01:48:717AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 04 2007 01:39PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational, cross-calibrated. | Apr 04 2007 02:08PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Apr 03 2007 03:54PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | System unavailable. CPS trip levels being reset. | Apr 03 2007 03:18PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port WASP successfully collected data on 04/04. Working on final plunge calibration. Some intermittent open circuit on SE Electrode. No data yet taken with K-WASP. | Apr 05 2007 10:19AM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 spatial channels. Density is not calibrated yet. Temperature should be fine. | Apr 05 2007 08:28AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 9. | Apr 05 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | no | looking around B II B V (491 - 497 nm) | Apr 05 2007 10:47AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 5 2007 11:15:40:520AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 04 2007 01:39PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational, cross-calibrated. | Apr 04 2007 02:08PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Apr 03 2007 03:54PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | System unavailable. Analog Measurement System power supply failure. Parts here 040607 | Apr 05 2007 11:03AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Calibrated detectors are positioned correctly; Voltage is on on the He3 bank; Remaining voltages will be turned on when plasma attempts start | Mar 13 2007 08:23AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port WASP successfully collected data on 04/04. Working on final plunge calibration. Some intermittent open circuit on SE Electrode. No data yet taken with K-WASP. | Apr 05 2007 10:19AM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 spatial channels. Density is not calibrated yet. Temperature should be fine. | Apr 05 2007 08:28AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 9. | Apr 05 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | no | looking around B II B V (491 - 497 nm) | Apr 05 2007 10:47AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 5 2007 11:29:14:837AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 04 2007 01:39PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational, cross-calibrated. | Apr 04 2007 02:08PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Apr 03 2007 03:54PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | System unavailable. Analog Measurement System power supply failure. Parts here 040607 | Apr 05 2007 11:03AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port WASP successfully collected data on 04/04. Working on final plunge calibration. Some intermittent open circuit on SE Electrode. No data yet taken with K-WASP. | Apr 05 2007 10:19AM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 spatial channels. Density is not calibrated yet. Temperature should be fine. | Apr 05 2007 08:28AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 9. | Apr 05 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | no | looking around B II B V (491 - 497 nm) | Apr 05 2007 10:47AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 5 2007 11:42:03:880AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 04 2007 01:39PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational, cross-calibrated. | Apr 04 2007 02:08PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Apr 03 2007 03:54PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | System unavailable. Analog Measurement System power supply failure. Parts here 040607 | Apr 05 2007 11:03AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port WASP successfully collected data on 04/04. Working on final plunge calibration. Some intermittent open circuit on SE Electrode. No data yet taken with K-WASP. | Apr 05 2007 10:19AM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 spatial channels. Density is not calibrated yet. Temperature should be fine. | Apr 05 2007 08:28AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 9. | Apr 05 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | yes | as of shot 10 looking around 553.3 nm for Ar X | Apr 05 2007 11:30AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 5 2007 01:48:31:883PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 04 2007 01:39PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational, cross-calibrated. | Apr 04 2007 02:08PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Apr 03 2007 03:54PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | System unavailable. Analog Measurement System power supply failure. Parts here 040607 | Apr 05 2007 11:03AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port WASP successfully collected data on 04/04. Working on final plunge calibration. Some intermittent open circuit on SE Electrode. No data yet taken with K-WASP. | Apr 05 2007 10:19AM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 spatial channels. Density is not calibrated yet. Temperature should be fine. | Apr 05 2007 08:28AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 9. | Apr 05 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | no | Fast readout around DBeta | Apr 05 2007 01:38PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 5 2007 02:15:36:523PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 04 2007 01:39PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational, cross-calibrated. | Apr 04 2007 02:08PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. | Apr 03 2007 03:54PM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | System unavailable. Analog Measurement System power supply failure. Parts here 040607 | Apr 05 2007 11:03AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available by 4/2 | Mar 27 2007 04:44PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | | Mar 05 2007 05:34PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | no | A-port WASP successfully collected data on 04/04. Working on final plunge calibration. Some intermittent open circuit on SE Electrode. No data yet taken with K-WASP. | Apr 05 2007 10:19AM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 spatial channels. Density is not calibrated yet. Temperature should be fine. | Apr 05 2007 08:28AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Replacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 9. | Apr 05 2007 08:29AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | yes | Fast readout around DBeta | Apr 05 2007 01:57PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|