Alcator C-Mod Run 1070406 Information

Back to runs

Miniproposals
Miniproposal:471
Date Filed: 3/8/2007
Title:Optimization of the Fast Vertical Control Gains for DIII-D and ITER-like shapes
First Author:Marco Ferrara
Session Leader:Marco Ferrara (shots 1-30)

Operators
Session leader(s):Marco Ferrara
Physics operator(s):Ian Hutchinson
Engineering operator(s):Andy Pfeiffer,Bill Parkin,Bill Byford

Engineering Operator Run Comment
MP471 Fast control gain optimization. Physics Operator Ian Hutchinson, S

Session Leader Plans
Entered: Apr 5 2007 05:44:22:530PM
Author: Marco Ferrara
First half of the run, optimization of the fast vertical gains:

-Start with target 1050706022, with lower peak elongation 1.7 and increase to 1.8 (2/3 shots). Seek for max elongation achievable with old set of gains.
-Change gains to the nominal optimum P=3, D=5.5. Try a few shots to make sure that these gains work for the same target plasma (1/2 shots). Increase elongation to 1.8 -Try a few shots, adjust the gains if needed (3/4 shots). If there seems to be margin for pushing more, try k>1.9, adjust the gains if needed (3/4 shots).
-Total 9/13 shots for the first half of the run.

Second half of the run, ITER shape:

-Target 1040127005 is more difficult, it might require a few shots to get the equilibrium right.
-Start with lower current and smaller elongation k=1.7 and increase to the target Ip=1.6MA, k>1.8 (3/4 shots).
-Because of the large current, feedback control of lock modes is essential.
-Change control gains to the nominal optimum P=3, D=5.5. Try a few shots and optimize gains if needed (4/5 shots).
-If there is time, play with other shape parameters (3/4 shots).
-Total 10/13 shots for the second half of the run.

Physics Operators Plans
Entered: Apr 5 2007 02:45:12:333PM
Author: Ian Hutchinson
Engineering setup for Friday 6 April. MP471 Fast control gain optimization.

Overnight ECDC in D2.

Use power systems setup for shot 1050706022.

A-coil configuration normal.
Gas configuration as we've had for recent shots as far as I know.
Initially disable Argon puff.

Enable the following gate valves and shutters: ECE, VUV, Z-bolo shutters

No ICRF or LH.

Session Leader Summaries
Entered: Apr 6 2007 06:12:24:497PM
Author: Marco Ferrara
Run 1070406 aimed at pushing to high elongations while looking for the optimal (most stable) set of control gains for the fast vertical loop.
Target plasma was 1050706022, but with slightly different vertical programming (-5mm in the flat-top). Also the RXL needed to be modified to increase clearance at the divertor.
During the run the RCUR programming was tweaked during the flat-top to squeeze the plasma and produce high elongations.
The proportional gain was scanned P=2.5,3,3.5,4,4.5 with derivative gain fixed at 5. At low proportional gain and high elongation k>1.85 the plasma experiences a low frequency (about 50Hz) vertical oscillation ending with a disruption. At high proportional gain and similar elongation, it is a high frequency (about 100Hz) vertical oscillation that goes unstable.
Best shot of the day was 1070406016 (well reproducible: see 1070406017) with peak elongation >1.85. In this case P=3 and D=5. Derivative gain was therefore scanned for the same target plasma D=5,6,7,8. The vertical trace seemed to have lower activity at high derivative gains D=7,8.
Optimal proportional gain seems to lie in the range P = 3 - 4, while optimal derivative gain is probably in the range D = 5 - 8.
Last shot of the day 1070406030 aimed at the highest elongation with P=5, D=8 and DPCS cycle down to 72us (limit speed, no samples lost during discharge), but ended with a disruption at 1.44s.
All shots aiming at elongations >1.85 ended with disruptions.

Physics Operator Summaries
Entered: Apr 6 2007 05:16:35:070PM
Author: Ian Hutchinson
Summary
________

A slow start with chopper and data system problems. Then we got into a good groove. The plasmas here routinely produce sustained ohmic H-modes lasting of order 1 second. Elongations to 1.85+ were obtained. However, despite obtaining new record elongation and n/n_c, it was not demonstrated that the proposed adjustments to gains are a big win. See Session Leader for more analysis.


Scorecard
_________
 Setting date to that of current shot. Change if necessary.
  Shot,Duration(s),Ipmax(MA),Result  Shot,Duration(s),Ipmax,Result
  |   01   0.175   0.661   Plasma  |   02   0.000   0.002   Dud     |
  |    3   No Ip                   |    4   No Ip                   |
  |   05   0.000   0.002   Dud     |   06   1.981   0.987   Plasma  |
  |   07   1.482   0.987   Plasma  |   08   0.000   0.041   Fizzle  |
  |   09   1.980   0.989   Plasma  |   10   1.984   0.995   Plasma  |
  |   11   1.984   0.995   Plasma  |   12   1.984   0.998   Plasma  |
  |   13   1.983   0.995   Plasma  |   14   1.984   0.995   Plasma  |
  |   15   1.983   0.998   Plasma  |   16   1.984   0.995   Plasma  |
  |   17   1.983   0.997   Plasma  |   18   1.247   0.996   Plasma  |
  |   19   1.071   1.008   Plasma  |   20   0.000   0.047   Fizzle  |
  |   21   1.160   0.989   Plasma  |   22   0.000   0.051   Fizzle  |
  |   23   1.403   0.991   Plasma  |   24   0.000   0.050   Fizzle  |
  |   25   1.249   0.996   Plasma  |   26   0.000   0.052   Fizzle  |
  |   27   1.984   0.995   Plasma  |   28   1.985   0.995   Plasma  |
  |   29   1.985   0.995   Plasma  |   30   1.449   0.995   Plasma  |
 
Date 1070406:  30 shots.  21 plasmas.   5 fizzles.   2 duds.   2 System Error.

Session Leader Comments
Apr 6 2007 11:00:15:810AM1070406006Marco FerraraGood plasma, 1.75 EFIT elongation, P=4, D=6 on this shot (standard gains). Next shot, change gains to nominal optimum P=3, D=5.5
Apr 6 2007 01:02:02:093PM1070406007Marco FerraraP=4, D=5.5 seem to be more unstable... more activity on A_out3. Also disruption at 1.5s prob because of EF1 saturation
Apr 6 2007 01:02:13:577PM1070406009Marco FerraraP=4, D=5.5 worked alright. Nc has a minimum -1.05 at 1.3s, the plasma is under vertical control. Next shot try D=5.
Apr 6 2007 01:02:30:483PM1070406010Marco FerraraP=4, D=5 worked alright. Max elongation still 1.77 at 1.3s. Next shot try to raise elongation.
Apr 6 2007 01:02:40:750PM1070406011Marco FerraraP=4, D=5. In this shot the target value of RCUR was reduced during the flattop to increase elongation. Max elongation 1.78 and Nc down to -1.1 at 1.3s. Next shot try to raise elongation more by reducing RCUR.
Apr 6 2007 01:02:52:890PM1070406012Marco FerraraP=4, D=5. Max elongation 1.8 and Nc down to -1.15 at 1.2s. Next shot try to increase elongation through reducing RCUR. Also increase clearance from the divertor pushing in RXL
Apr 6 2007 01:03:36:780PM1070406013Marco FerraraP=4, D=5. Max elongation 1.82 and Nc down to -1.05 at 1.3s. Next shot try to increase elongation through reducing RCUR.
Apr 6 2007 01:03:55:220PM1070406014Marco FerraraP=4, D=5. Max elongation 1.82 and Nc down to -1.07 at 1.3s. Next shot try to increase elongation through reducing RCUR.
Apr 6 2007 01:10:38:440PM1070406015Marco FerraraP=4, D=5. Elongation up to 1.85, Nc down to -1.1 at 1.3s. Next shot change proportional to P=3. No changes in shape programming, only test of P gain in fast vertical control.
Apr 6 2007 01:23:44:117PM1070406016Marco FerraraP=3, D=5. Elongation up to 1.87, Nc down to -1.08 at 1.3s. Next shot increase elongation.
Apr 6 2007 01:41:55:920PM1070406017Marco FerraraP=3, D=5. Elongation up to 1.87, Nc down to -1.08 at 1.3s. Almost identical to shot 16. Next shot increase elongation.
Apr 6 2007 02:03:08:873PM1070406018Marco FerraraP=3, D=5. Disruption when k=1.86, Nc down to -1.17 at 1.22s. Big injection.
Apr 6 2007 02:29:56:490PM1070406019Marco FerraraP=3, D=5. Disruption when k=1.82, Nc down to -1.17 at 1.06s. Try to lower P=2.5, same plasma shape
Apr 6 2007 02:47:32:870PM1070406020Marco FerraraP=2.5, D=5. Low frequency branch unstable. Try to increase the proportional gain to 3.5.
Apr 6 2007 03:25:32:137PM1070406023Marco FerraraP=3.5, D=5. Disruption, low frequency branch
Apr 6 2007 03:41:28:673PM1070406025Marco FerraraP=4.5, D=5. Disruption, high frequency branch at 1.23s
Apr 6 2007 04:15:09:780PM1070406027Marco FerraraP=3, D=6. Didn't disrupt, very similar to shot 17 (same programming, but D=5 in that shot)
Apr 6 2007 04:35:59:770PM1070406028Marco FerraraP=3, D=7. Seems more stable than shot 27. However Nc is smaller here
Apr 6 2007 05:01:06:483PM1070406029Marco FerraraP=3, D=8. Looks stable. Next shot push the elongation adn try DPCS period 72us.
Apr 6 2007 05:18:01:507PM1070406030Marco FerraraP=3, D=8. DPCS period 72us. Target elongation >1.87. Disrupted at 1.44s, both slow and fast branches seem to contribute.

Physics Operator Comments
Apr 6 2007 08:37:17:087AMIan HutchinsonLoad shot from 10705028. Load segment 2 from 1050706022 seg 2.
Messages: DPCS working copy not superceded.
Set zcur to -5mm from zero. This ought to stabilize the shot noticeably.
Load. This is the shot we start from
Apr 6 2007 09:00:22:860AMIan HutchinsonSetup of segment 3 for part 2 of MP.

Import segment 2 from 1040127005.
Message: Error opening dpcs tree shot. Then follow the Wolfe instructions as follows:

1. RCUR : Bring up Edit Wire screen and recalculate (CALL) predictors for
all three rows. You will see the date change in the alg-version window. When
done hit Apply, and ok the factor screen. If you use apply instead of OK the
edit wire screen stays in place and you can just go down the row of buttons
on the main PCS screen.

2. ZCUR : CALL the predictor (only the middle one is active). Hit APPLY and
ok the factor screen

3. zero_03 : I think we want to change this back to being the fast ZCUR. Do
a LOAD WIRE from Wire 10 in the same segment as you are working in. Leave
the Directory as pcs_scratch and the shot number as -1. This will change the
contents to ZCUR. Now CALL the predictor, note that the alg-version date
changes, and hit APPLY and ok the factor screen.

4. CLEARIN: CALL the predictor. Note that this will remove the 12700 offset
value; that's good because you were advised to zero this in one of the
messages you acknowledged earlier. APPLY, ok factor, ...

5 -8. RXL, ZXL, RXU, ZXU: Same drill, CALL the predictors, APPLY, ok the
factors, move on.

9. bolofeed: You want to change this to the B21_PROJ feedback algorithm for
the A-coils. There are four steps:
a) Do LOAD WIRE from a segment that has this predictor; if you started
from a shot from today then there is one in Segment 4, wire 9. Leave
directory as
"pcs_scratch" and shot=-1.
b) CALL the predictor (I'm not positive this is needed, but there is a
more recent version than the one in seg4 and I don't know what changed. Hit
APPLY and acknowledge the message from P_INFO and ok the factor screen.
c) Bring up the Integrator Gates screen (button at bottom of segment
window) and move the start of Gate C to 0.2 seconds (or earlier). OK this
screen.
d) Bring up the V#01-16 Screen. It will probably put up two pop-ups about
changing the names of outputs. Acknowledge these. Zero out the waveform for
the Acoil_VOLT (2nd trace in right hand column). Ok the window.

10. ZCUR: You don't want this one any more, so hit ZERO_ALL. Hit APPLY and
acknowledge the P_INFO pop-up. If you get a factor screen, ok that too.

11-12: zero_11,zero_12 : No action required
13. EF2_BY_EF4: no action required
14. NL_04: If the SL wants a different density then reprogram it. Otherwise,
no action required.
15. IC_EF4: no action required. We may want to increase the program value
later in the run.
16. IP: CALL the predictor. This will have the effect of zeroing the 70000
amp offset, and it can't hurt. If the SL wants to change the current program
to a lower value than 1.6MA ( I recommend it) then make the change. OK the
screen and the factor screen when it comes up.

For some reason, the TF seems to have been programmed to -147kA, instead of
-150kA. Not that it matters a lot, but this should probably be changed
(V#01-16 screen).

Wire 3 gains to d=5.5 to compensate for the change of gains.
Apr 6 2007 09:19:13:073AM1070406001Ian HutchinsonPlasma disrupts at .157s, because chopper did not work.
Also got no gas puff, or at least no puff diagnostics.
Apr 6 2007 09:34:49:153AM1070406002Ian HutchinsonChopper and gas test.
Got gas, and diagnostics look ok.
No chopper.

Call all magnetics predictors in segment 2.
Apr 6 2007 10:35:49:473AM1070406003Ian HutchinsonNo power data hang.
Apr 6 2007 10:49:06:917AM1070406005Ian HutchinsonFinally got a data cycle to run. Chopper test works.
Apr 6 2007 11:00:28:810AM1070406006Ian HutchinsonPlasma.Chopper is working. Substantial noise but there's no obvious instability.

Change fast zcur gains. D to 5.5. from 6., P to 3 from 4.

Apr 6 2007 11:17:22:037AM1070406007Ian HutchinsonPlasma disrupts at 1.48. EF1U is saturated at this point (in prior shot too)

Reduce nl04 early to prevent density overshoot.
Reduce RXU from .015 to .012 to prevent EF1U saturation.
Apr 6 2007 11:27:36:120AM1070406008Ian HutchinsonFizzle.

Br offset to -0.4 mT from -0.7 mT.
Apr 6 2007 11:40:25:030AM1070406009Ian HutchinsonPlasma. Ramps down.

D to 5.0 from 5.5. nl04 to .9e20. Attempts to fix the nl04 gain not working
at the moment.
Apr 6 2007 12:14:22:293PM1070406010Ian HutchinsonPlasma to rampdown.

Call nl04 predictor to correct calibration.
Lower Rcur to .653 from .6545 at 1.5 s, a 1.5mm inward motion, should make
the plasma more unstable, as requested.
Apr 6 2007 12:15:03:370PM1070406011Ian HutchinsonPlasma to rampdown.

Reduce Rcur by another 1.5mm to .6515.
Apr 6 2007 12:34:46:723PM1070406012Ian HutchinsonPlasma to rampdown.

Reduce RXL by 5mm at 1.3s.
Rcur to .6500 at 1.45s. (A further 1.5mm reduction).
Tweak RXU at late time. Still trying to avoid EF1U saturation.
Apr 6 2007 12:45:12:913PM1070406013Ian HutchinsonPlasma to rampdown.

RXL decreased a further 3mm to .007 at 1.3s
Rcur to 0.6485, a further 1.5 mm reduction at 1.45s.
Apr 6 2007 01:09:40:597PM1070406014Ian HutchinsonPlasma to rampdown.

Rcur to .647.
RXL to .003 (4mm)

Observe that the Zcur P is now at 4 whereas, it was supposed to have been set
to 3 at shot 6. This appears to be operator error, but should be checked.
Apr 6 2007 01:23:01:477PM1070406015Ian HutchinsonPlasma to rampdown.

P gain to 3 from 4. No other changes.
Apr 6 2007 01:47:25:053PM1070406016Ian HutchinsonPlasma to rampdown. Slightly lower amplitude chopper fluctuations.

Rcur to .6455 at 1.45s. This is what I meant to do. But it does not seem to have
happened.
Apr 6 2007 01:56:06:623PM1070406017Ian HutchinsonPlasma till rampdown. I think this is just a repeat of the previous shot.
The elongation does not substantially increase.

Rcur .6455 really really. Load.
Apr 6 2007 02:13:14:607PM1070406018Ian HutchinsonPlasma Disrupts at 1.27s. Injection at 1.13.
z-oscillations at 1.08s may be the cause.

No PCS changes.
Apr 6 2007 02:30:58:677PM1070406019Ian HutchinsonPlasma disrupts at 1.07s. Growing oscillation leads to VDE.

P to 2.5 from 3.
Apr 6 2007 02:34:50:773PM1070406020Ian HutchinsonFizzle.

No PCS changes
Apr 6 2007 02:58:03:017PM1070406021Ian HutchinsonPlasma. 20 Hz vertical oscillation for this P=2.5 case. Disrupts at 1.16s.

P to 3.5 from 2.5.
Apr 6 2007 03:10:24:207PM1070406022Ian HutchinsonFizzle.

No PCS changes.
Apr 6 2007 03:39:55:780PM1070406023Ian HutchinsonPlasma disrupts at 1.39s. Oscillation period 19ms, but with some second harmonic.

P to 4.5 from 3.5
Apr 6 2007 03:56:05:897PM1070406025Ian HutchinsonPlasma disrupts at 1.24s. Oscillation period 10ms. This is the fast mode perhaps.

Rcur back to .6470 (1.5ms further out).
Rcur offset to 1500 in segment 1.
P to 3, D to 6.
Apr 6 2007 03:58:24:600PM1070406026Ian HutchinsonFizzle. Slightly late breakdown.

No PCS changes.
Apr 6 2007 04:33:43:630PM1070406027Ian HutchinsonPlasma till rampdown. Oscillation period 17ms.

D to 7 from 6.
Apr 6 2007 04:58:22:860PM1070406028Ian HutchinsonPlasma to rampdown. Oscillation amplitude reduced. Period 17ms, but with higher harmonics.

P to 8 from 7.
Apr 6 2007 05:01:14:780PM1070406029Ian HutchinsonPlasma till rampdown.

Rcur to .6455 (1.5mm lower). Try for record.
Apr 6 2007 05:17:41:833PM1070406030Ian HutchinsonPlasma disrupts at 1.43. Several injections, so not entirely a fair test, but
this is a VDE.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:00:26:003AMPlasmaBadefc did not run, gas did not fill
209:15:04:237AMTestBadefc failed
410:03:14:960AMTestBadIgor failed
510:32:53:550AMTestOkEfc chopper lost ready in check
610:47:28:340AMPlasmaOk
711:00:22:017AMPlasmaOk
811:13:07:910AMPlasmaOk
911:25:52:463AMPlasmaOk
1011:45:12:047AMPlasmaOk
1112:03:27:913PMPlasmaOk
1212:18:02:293PMPlasmaOk
1312:30:22:940PMPlasmaOk
1412:43:28:477PMPlasmaOk
1501:03:10:890PMPlasmaOk
1601:18:58:723PMPlasmaOk
1701:37:52:450PMPlasmaOk
1801:53:33:787PMPlasmaOk
1902:11:16:857PMTestBad
2002:28:55:177PMPlasmaOk
2102:41:45:133PMTestBad
2202:54:37:310PMPlasmaOk
2303:07:10:973PMPlasmaOk
2403:24:57:290PMPlasmaOk
2503:37:27:250PMPlasmaOk
2603:53:17:927PMPlasmaOk
2704:06:17:040PMPlasmaOk
2804:28:43:987PMPlasmaOk
2904:55:02:763PMPlasmaOk
3005:07:49:753PMPlasmaOk

System Availability
Apr 6 2007 09:00:02:800AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Apr 04 2007 01:39PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational, cross-calibrated.Apr 04 2007 02:08PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Apr 03 2007 03:54PM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridnoSystem unavailable. Analog Measurement System power supply failure. Parts here 040607Apr 05 2007 11:03AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesstill a problem with the post shot script; this is being fixed by hand at presentMar 29 2007 11:45AM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
Reflectometerno Mar 05 2007 05:34PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port WASP successfully collected data on 04/04. Working on final plunge calibration. Some intermittent open circuit on SE Electrode. No data yet taken with K-WASP.Apr 05 2007 10:19AM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - Coreyes2 lasers, 8 spatial channels. Density is not calibrated yet. Temperature should be fine.Apr 05 2007 08:28AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoReplacement filter has been reinstalled. Bench recalibration needed. Should be ready sometime during the week of April 9. Apr 05 2007 08:29AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
Vispecno Apr 06 2007 08:51AM (agraf)Alex GrafVisible Spectrometeragraf