Miniproposal:466
Date Filed: 3/8/2007
Title:Slower Ip Ramp Development
First Author:Chuck Kessel
Session Leader:Chuck Kessel (shots 1-22)

Operators
Session leader(s):Chuck Kessel
Physics operator(s):Steve Wolfe
Engineering operator(s):Bill Parkin,Bill Byford

Engineering Operator Run Comment
MP #466 SL Kessel PO Wolfe EO Pierson

Session Leader Plans
Entered: Apr 11 2007 08:06:37:200AM
Author: Chuck Kessel
MP#466
AIM: Establish discharges with slower Ip ramp rates to a flattop Ip of 600 kA, ranging from 250 ms (typical) to 500, 750, and 1000 ms. The experiments will determine how low an Ip value (or how early in time) the plasma current feedback and/or PF coil pre-programming can change the Ip trajectory emerging from the breakdown/startup phase. In addition, attempts will be made to divert the plasma as early as possible in order to take advantage of lower impurity concentrations and provide for very early H-mode transitions in future heated discharges.

1) start with discharge 1050708019, which reached 320 kA at 100 ms. Adjust the 2nd segment of Ip ramp to reach 600 kA by 500 ms. (1-5 shots)

2) try to reduce the early Ip value by adjusting the crowbar timing of the OH comm resistors, OH and PF voltage pre-programming, and 1st segment of Ip ramp feedback gains. Rough target is Ip = 200 kA by 75 ms. (5-10 shots)

3) attempt early diverting by adjusting the EF1 crowbar timing and shape programming to obtain diverted plasmas by 75-150 ms. (5-10 shots)

4) using the discharge with the lowest Ip value in the early ramp, establish other Ip ramp cases at 250 ms, 750 ms, and 1000 ms. Combine this with the earliest diverting plasma if possible, or best combination of low Ip and early diverted plasma. (5 shots)

Physics Operators Plans
Entered: Apr 11 2007 03:25:53:230PM
Author: Steve Wolfe
PO_PLAN for Thursday, April 12, 2007

SL: Kessel
PO: Wolfe
MP#466 "Slower Ip ramp development"

Target shot for today is 5.4T, 600kA flattop, NL04=5e19, LSN.
Argon puffing (small) permitted upon request.
RF and LH piggybacking allowed after 0.7sec.

Engineering Setup:
==================
Overnight ECDC in D2, P=2e-4 Torr, sweep: Rmin=44, Rdwell=45, Rmax=103

Run begins at 09:00 and ends at 17:00

Power Systems as on 1050708019 (*** NOTE: Non-standard Crowbar timing ***)

A-coil: +Dtop -Dbot -Jtop +Jbot 
** HYBRID CONTROL ** enabled (this is different from source shot). 

Note to Eng Op: We may be changing commutation resistor taps during the day.
Please have meters and wrenches close to hand. 

Gas Setup:
 Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
 fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
 leave B-side upper as is Hybrid DISABLED (PG2)
 fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
 leave NINJA as is,  disabled

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, Z-bolo shutters

Torvac setup: Pumpstack gatevalves OPEN

ICRF: Not required, allowed if ICRF Group wants. Check with ICRF for
      turn on instructions.
LH: Not required, allowed if LH Group wants

Physop Plan:
------------
The run plan calls for first reproducing the relatively low early current
obtained on 1050708019, then reducing that current futther, and finally trying
for earlier diversion. 

Since the experiment is based on use of the techniques applied for 1050708019,
it will not be possible to use a recent startup. Therefore, I will need to
reload the target shot and, after recalculating predictors to account for the
changed magnetics (F11 and one BP coil), probably some tuning of breakdown
fields will be needed to get a plasma. PCS_compare gives over 250 lines of 
differences between this shot and a recent startup:

Initial Setup:
--------------
RCUR offset is different (was 1500, now 1800); could be part of slower ramp.
BR0 is 1mT higher (.0003 vs -.0007): probably want to change

EF2 current traces have 1ms shift at -1.518 sec, import seg touch: ignore

EF4 current was -1310, now -1335: Change

All _VOLT controller times different by order 1msec: KEEP OLD?

IP control: KEEP

KEEP all original _VOLT waveforms

Acoil: change it to B21_PROJ like modern shot (wire 9, Integrator time, V
waveform)

PG4: set to 20msec ?
PG3: KEEP

Recalculate all the magnetics predictors.

In seg2, modify Ip program to reach 600kA at 500ms. 

1. Establish discharge with Ip(0.1sec)~300kA, Ip(0.5s)=600kA. [1-5 shots]

1a If problems getting breakdown or current rise, revert to recent startup and then re-do
   variations applied on 1050708 and/or 1050602. [3-8 shots]

2. Try to reduce early Ip to Ip(0.075s)~200kA. Tools will be earlier OH
   crowbar, adjustment of voltages (OH's, EF3), Ip feedback. Maybe try to get
   a head start on step 3 (early divertor) but back off if we start getting
   disruptions that might increase the fizzle rate.  

   If desperate, reduce OH commutation resistors. Current values are (per Cryo
   screen): OH1:.033, OH2:.005 +/- .001, EF1: .07 Ohms

   [5-10 shots] SL should decide when to quit on this step and go on to step 3. 

3. At some point, take what we've got for early current and try to bring
   divertor time earlier, aiming for 75-150msec. Tools are EF1 crowbar time,
   CLEARIN, RXL, ZXL program (maybe ZCUR). If necessary, move Seg2 start
   earlier than 0.1 sec. [~5 shots] (we're probably going to run out of shots
   before we finish this, maybe before we start)

4. If things have gone amazingly well and there's time left, use the discharge
   with the best early Ip (and divertor time if possible) and change ramp rate
   to get to 600kA at [250, 750, 1000] msec.




Session Leader Summaries
Entered: Apr 12 2007 10:09:35:903PM
Author: Chuck Kessel
Run 1070412, shots 001-022: MP #466

This run was targeting slower Ip ramp rates and early diverted plasmas to provide reference discharges for hybrid and AT scenario development. An older shot 1050708019 was used as the basis since something similar had been done there. This was obtained by breaking the early Ip ramp that emerges from breakdown at t â?? 75 ms at an Ip â?? 200 kA, and proceeding with a slower Ip ramp rate (the actual breakpoint appears to be at t â?? 40-50 ms and Ip â?? 170 kA). This was largely accomplished by shifting the OH comm crowbar timing and adjusting the Ip feedback gains and their timing, and quickly yielded the desired effect by shots 003-004. The flattop Ip was 600 kA for all shots, and for most of the shots 001-016 the Ip flattop began at 500 ms. By shot 005 the EF1 crowbar was already being adjusted to earlier times to help smooth the Ip ramp and begin the earlier divert. Runaways were present on virtually all shots, in nearly all cases at an early time of 50 ms, and on many cases a long lived phase stretching from 0.1 to 0.4 s. Work continued with earlier EF1 crowbar times, CLEARMIN request and its timing, ZXU/RXU/ZXL/RXL requests and their timing, and ZCUR request and timing. The high li values obtained, 2.0-2.5, in these ohmic heated slow Ip ramp discharges were aggravating the shaping and diverting control. Ultimately, the divert time was moved back from 500 ms to 220 ms, with Ip = 315 kA and li = 2.1 (016). Then a lower Ip ramp rate was examined (017-022), making Ip start its flattop at 1000 ms. Against our intuition, these discharges had early diverting ( at 180 ms) right away, but had runaways and high densities. This was removed by using a tri-linear Ip ramp; Ip to 170 kA at 50 ms, Ip to 400 kA at 250 ms, and then Ip to 600 kA at 1000 ms. Further adjustments of CLEARMIN, ZCUR, ZXL, and RXL feedback parameters got very good inboard gap sustainment with a divert time of 180 ms. It was noticed (near the end of the run day) that the X-pt is close to the outboard shelf when the plasma goes diverted, and may provide a useful knob in future discharge to divert even earlier by making RXL smaller with earlier feedback control.

Overall the run day was successful, 2 slower Ip ramp cases were established, and the divert time was made about 200 ms at low current and high li. The fact that the slower Ip ramp case diverted early right away indicates that the crowbar timing and feedback settings are robust for other Ip ramp rates. The runaways were a persistent problem, probably influencing the current profile and other discharge features, but the discharges were successful in spite of them. These discharges will be combined with early heating and current drive experiments planned in the Advanced Tokamak scenario development later this year.

Physics Operator Summaries
Entered: Apr 12 2007 06:49:31:860PM
Author: Steve Wolfe
Session Leader summary for Thursday, April 12
MP#466 Slower Ip ramp development
SL: Kessel
PO: wolfe
EO: Pierson,Parkin,Byford

The aim was to develop a (post breakdown) start-up sequence
with low initial current, slow current rise capability, and 
early diversion. We pretty much accomplished all of these, 
although we didn't quite get it to divert as early as requested.

The starting point was 1050708019, which had a seg2 transition 
current around 320kA, using oh crowbar at 0.06sec and reduced
OH and EF voltages in seg1. This shot had a later current ramp to
high current, which we replaced with a slow ramp to 600kA at .5sec,
followed by flattop at 0.6. Program density was nl04=0.5e20 all day.
This discharge was satisfactorily established in one shot, although
shot#1 was slightly confused by the fact that the LH accidentally 
fired at 0.1 sec instead of 0.7sec, resulting in lots of runaways.

Step 2 of the program, reduction of the early current to 200kA at 
75ms, was accomplished fairly quickly, contrary to my expectations.
The key was simply moving the OH crowbar time earlier, to .04sec,
and adjusting the target Ip value at 0.1sec. Dropping the OH1_VOLT
pre-program voltage and EF3_VOLT and EF1_VOLT values before 50ms was
also helpful. By shot#4 we declared Step 2 complete, and moved on
to step 2, getting the divertor to come in earlier. For these 
low current conditions, the nominal programming was giving a late 
divertor time, around 0.5sec. This was at least partially due to 
high li (~2 to 2.5) in these discharges. It should be noted that 
we were plagued with runaways on most shots all day long. There 
were a few purely thermal cases, but avoiding the runaways remains
an unsolved problem with this scenario.

Getting the plasma to divert earlier proved much harder than I 
expected, and we spent much of the day on this problem. There were
no serious problems moving the EF1 crowbar time earlier than the
nominal .2sec, first to 0.12 and finally to 0.09. However, despite
increasing the CLEARIN target significantly, we were unable to 
get these high li discharges to divert much earlier with normal 
xpoint position. We eventually overcame this priblem by moving
the xpoint up to meet the plasma, then letting it come back down. 
Some care was required to avoid railing the EF2L supply (at zero
current), as on shot 10. It should also be noted that the EF1L 
recharged to near or above the pre-charge level (~-6kA) in these
cases, consistent with higher ZXL. During this part of the run I also 
got rid of a lot of feedforward voltages in seg2, dropped IC_EF4,
tweaked around with density and Ip program and gains. See logbook
for details. Around shot#15 we were getting it to divert at about
0.22sec. Shot 16 had a TF crowbar before t=0, but the plasma continued
more or less normally, diverting around 0.2sec. Both the initial 
clearin ramp and the drop in Zcur were pushed earlier for these 
cases. 

There was about a 90minute delay while the engineers checked out 
the TF power supply. It turns out there had been related unnoticed 
converter current sharing issues for about two weeks before this event.
After a lot of examination and checking and reseating of connections, 
the problem did not recur. 

We decided to go on to the slowest Ip ramp case of Step4 to
verify that we could maintain the earlier diversion with potentially
even higher li in that case. This shot had the same early program,
but the ramp was slowed to reach 600kA at 1.0sec instead of 0.5. These
shots were successful, diverting around the same time (~.2sec), and we
went back to pushing for earlier diversion. Some reprogramming of the 
density rise (slower) seemed to help eliminate a marfe event early in the second
Ip ramp, and generally improved things. Shots 19 and 22 were very good 
cases. For the last several shots we moved the seg2 start to 0.08 sec,
ehich necessitated turning some gains in seg2 on earlier. Shot 22, which
diverted at 0.18sec, had increased clearin P gain of 10, staring at .08sec,
and a weak integral gain (0.5) starting at .1sec. It also had RXL programmed
at -.01 instead of 0. from the beginning. The initial xpoint was near
the outer nose, so even more negative RXL might be helpful. This case
diverted with 290kA and li=2.3. 

LH and ICRF were firing at 0.7 and 1.2sec most of the day. I think 
they tried overlapping at some point, but I was too busy with the
early shot to pay much attention. 

Runaways were a problem all day. Most shots had both an early bounce
and runaways building up over the first 200ms. Shots 19 and 22 were
exceptions. There was also one bouncy fizzle (#20). I never found any
way to get rid of these, and they probably were contributing to the
high li and difficulty in early diverting. I made one attempt to 
increase the Bz ramp rate before 15msec by tweaking the early oh1 and
ef3 voltage, but it did not help much. I didn't want to change
RCUR offset because that might have screwed up the slow rise phase 
in seg1 after the early crowbar, but perhaps that should have
been tried. Note that I kept the offset=1500 from 1050708019
rather than changing to 1800, as on more recent shots. 

All in all, this was a pretty good run from the physop perspective. 
A new startup/current ramp tool has been developed. Some additional
improvements look possible, but overall the main goals were met. 

Scorecard:
-----------
   Tests      0
   Duds       1 (No TF)
   Fizzles    1
   Plasmas   20 (18 full length)
  =========  ==
   Shots     22
Total plasma duration: 37.38 s



Session Leader Comments
Apr 12 2007 10:17:15:040AM1070412002Chuck KesselNICE, Ip ramp is good, top of early Ip rise at 250 kA, diverting at 0.54 s, good flattop, steady-ish density at 6.5x10^19
Apr 12 2007 01:35:32:163PM1070412012Chuck Kesselgood shot, divert at 280 ms, got rid of 2nd long time runaway lobe ---> slight shift in Ip gain to earlier time, back off on ZXL request
Apr 12 2007 04:05:55:253PM1070412017Chuck Kesselfirst test of Ip ramp to 600 kA at 1000ms, with same early ramp phase to 200 kA, looks OK, has early divert with a bounce, BUT big density rise and has the long time runaway phase 200-400 ms,
Apr 12 2007 04:38:54:233PM1070412019Chuck KesselGOOD shot, Ip up to 600 kA by 1000ms, tri-linear ramp with 400 kA at 250 ms, removed runaways, density is good, inner gap is very good, divert time about 180 ms
Apr 12 2007 05:23:21:047PM1070412022Chuck Kesselgreat final shot, early divert 180 ms, slowest Ip ramp, X-rays mostly out of the picture, left gap comes on and stays on well, li appears to respond to diverting, Te higher at 1.5 keV. Found a promising knob for even earlier diverting time RXL to keep away from the outboard shelf (the nose).

Physics Operator Comments
Apr 11 2007 04:38:40:540PMSteve Wolfe
Start setting up tomorrow's shot. 
Starting from 1050708019.

Recall mag predictors in seg1 and seg2. 
Seg 1: Put Br0 offset to -.0007 (current value)
       IC_EF4 from -1335 from -1310
       Use RCUR offset=1500 instead of recent 1800
Seg 2: Change current flattop to 600kA. 

Import seg3 and seg 4 from 1070411023 (last shot, unused)
I just don't want to have to re-call all those predictors,
and it gives me a place to copy the B21_PROJ wire from.

Back in seg2, copy wire 9 from seg3 B21_PROJ, change IntC gate to 0.2,
Zero ACOIL_CUR in Seg2 V#01-16.

Buildall; touch wire 5 (I've got to fix that timestamp bug!)
Buildall.

Save as /home/wolfe/pcs_scratch/*_1070412000

NUM             LONG      =            3
copying /home/wolfe/pcs_scratch/pcs_model.tree to /home/wolfe/pcs_scratch/pcs_1070412000.tree
copying /home/wolfe/pcs_scratch/pcs_model.characteristics to /home/wolfe/pcs_scratch/pcs_1070412000.characteristics
copying /home/wolfe/pcs_scratch/pcs_model.datafile to /home/wolfe/pcs_scratch/pcs_1070412000.datafile
looking for.../home/wolfe/pcs_scratch/dpcs_model
NUM             LONG      =            3
copying /home/wolfe/pcs_scratch/dpcs_model.tree to /home/wolfe/pcs_scratch/dpcs_1070412000.tree
copying /home/wolfe/pcs_scratch/dpcs_model.characteristics to /home/wolfe/pcs_scratch/dpcs_1070412000.characteristics
copying /home/wolfe/pcs_scratch/dpcs_model.datafile to /home/wolfe/pcs_scratch/dpcs_1070412000.datafile
Open tree /home/wolfe/pcs_scratch      -1
Open tree done


Apr 12 2007 07:32:17:207AMSteve Wolfe
Continuing setup for slow Ipdot experiment MP#466
Load From scratch 1070412000
Seg1 pg4 from 19 to 23 ms
Seg2: Remove step in OH1_VOLT after .7sec (leftover from current ramp)
      Hold at 50V. Should probably drop OH2_*_VOLT from 20 to 10,
      but leave it for now. 
Load at 12-Apr-2007 07:23:01.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done

Note that the seg1 rcur controller is hand-made, uses only
OH stack and EF3. Consider tuning it, or switching in contihh 
at 50-70ms or so. 

Apr 12 2007 09:30:41:070AM1070412001Steve Wolfe
Shot#1: First try at 300kA early Ip, ramp to 600kA at 0.5sec
Lots of runaways but it ran. Start at 0.1sec.
Move pg3 gas to 15ms in seg 1, delay nl04 a little in seg2.  
Increase pg4 to 24ms from 23ms
Move oh comms to .05sec, smooth oh1_volt drop between 35 and 55ms
Drop ip prog to 250 in seg 1 and 2, change seg2 Ip gain switch 
from 8@.356 to 6@.250

Turns out the LH was on at 0.1sec, that's where the runaways come
from. Undo the pg3 move in seg1.


Apr 12 2007 10:10:20:397AM1070412002Steve Wolfe
Shot#2: Aim for 250kA
delay nl04 a little in seg2.  
Increase pg4 to 24ms from 23ms
Move oh comms to .05sec, smooth oh1_volt drop between 35 and 55ms
Drop ip prog to 250 at 0.1sec in seg 1 and 2, 
change seg2 Ip gain switch from 8@.356 to 6@.250

plasma, 220kA at 50ms, 260 at .1sec, 600@0.5sec, smoother rise,
can still see the gain switch. Also maybe want to back off
EF1 current rise. Seems to be a runaway dump at ~50msec



Apr 12 2007 10:26:14:357AM1070412003Steve Wolfe
Shot#3: Aim for 200kA
Ip target to 200ka @0.1sec (both segs)
Drop OH1_VOLT to zero at 40msec (from 50V)
EF3_VOLT from 2300 to 2200 at 46ms

Plasma, still some early runaways. Current didn't 
come down much from #2, now 245 at 0.1sec. 

Next: Move oh crowbar from .05 to .04



Apr 12 2007 10:43:40:457AM1070412004Steve Wolfe
Shot#4: Still aiming for 200kA
Move oh crowbar from .05 to .04
Drop EF1_Volt demands from 145V to 0 at 50msec in seg 1 
(IC_EF1 gains off at 0-, back on at 60msec)
Next time remember to fill in the gas after 40msec

Plasma, 190kA at 75msec, as we wanted. About 210 at 100msec
Still an extra step in seg2 current rise, EF1's turn around after
crowbar. Density rise very not smooth. Early bounce, runaway dump 
around 30msec. Plasma may move in a little 50-70ms?

Next: start playing with EF1 crowbars. fill in density rise.




Apr 12 2007 10:59:27:413AM1070412005Steve Wolfe
Shot#5:EF1 crowbar from .2 to .12 sec,
Change 150V EF1_VOLT step from .2 to .12sec,0 at .2sec  
Fill in seg1 pg3 pulse.

Runaways worse, disruption at 1.6sec. 

Next: Up 2ms on pg4, move pg3 to 15ms (runaways)
Try to move divertor earlier.



Apr 12 2007 11:27:35:660AM1070412006Steve Wolfe
Shot#6: Pg4 from 24 to 26ms, start pg3 at 15ms
IC_EF4 from -1335 to -1325
CLEARIN from .002 to .01, RCUR out by 4mm, all starintg at .258
Also drop ZXU by 2cm (.06 to .04)

Runaways still bad. Bounces worse. outer gap too small at .3 to .4
Next: still tuning divertor onset


Apr 12 2007 11:47:05:777AM1070412007Steve Wolfe
Shot#7: Move RCUR in 5mm before .5 sec, keep it off the limiter
Get rid of EF1_VOLT in seg2, no compensation at crowbar. 
Move EF1 crowbar from .12 to .09sec

Runaways still there, benign neglect didn't work. 
Crowbarring EF1's gave us more EF1 current early, but still doesn't
get diverted any earlier. 

If the plasma won't come to the xpoint, let the xpoint come to 
the plasma: reprogram RXL, ZXL. 


Apr 12 2007 12:00:10:313PM1070412008Steve Wolfe
Shot#8: Leave RXL at 0 straiht across (was 5mm out early, probably s noop)
Keep ZXL higher until 500msec
Don't know what to do about the runaways, try dropping PG4 to 26 to 22msec

Runaways are very reproducible. So is late divertor. 
Move ZXL up, ZCUR a little further down. 


Apr 12 2007 12:17:01:307PM1070412009Steve Wolfe
Shot#9: ZXL up by 3cm from 0.1 to 0.4
ZCUR from -.009 to -.02; Rcur a bit in between .4 and .6sec

Plasmas, runaways, xpoint came up, but still slow to divert. 
Next: EF2_VOLT to zero in seg2, Raise ZXL some more


Apr 12 2007 12:30:19:420PM1070412010Steve Wolfe
Shot#10: EF2_VOLT to zero in seg2, Raise ZXL some more
plasma xpoint moved, EF2 still going positive. Diverts 
at same time (roughly)

OH2 feedforward could be turned down, move both xpoints closer.



Apr 12 2007 01:00:05:337PM1070412011Steve Wolfe
Shot#11: OH2_VOLTs to zero in seg2 after .11
ZXL to .06, ZXU down to 0.02. 

Disruption at 0.56sec, actually diverted at 0.33
Something bad happened at 0.45, chopper floors, 
EF2L went to zero current at 0.37sec, EF1L is going
more negative than pre-charge. 

Back off that zxl



Apr 12 2007 01:20:22:550PM1070412012Steve Wolfe
Shot#12: ZXL from .06 to .05, 
IC_EF4 from 2000 to 1000
RCUR in by 3mm before .55sec
Start Ip gain 6@130msec instead of 250 go for a smoother Ip rise.

plasma full length fwwer runaways. 
Diverted at btween .28 and .3, with li=2.05
Looks calm and comfy, outer gap is bigger. 
EF2L comes up to -500A, then back down. 



Apr 12 2007 01:26:48:580PM1070412013Steve Wolfe
Shot#13: Add an Ip point at 230ms, 350kA
Runaways are back, plasma endured. 
Still diverting around 280msec.

Try bring CLEARIN up sooner, further


Apr 12 2007 01:44:03:433PM1070412014Steve Wolfe
Shot#14: Start CLEARIN ramp at .110 (from .150s) 
ramp to .015@0.2s (was .01@.258); Start CLEARIN P-gain at 7.5 (was 5)
Increase initial Ip gain from 6 to 8

No TF. 


Apr 12 2007 01:53:54:890PM1070412015Steve Wolfe
Shot#15: Start CLEARIN ramp at .110 (from .150s) 
ramp to .015@0.2s (was .01@.258); Start CLEARIN P-gain at 7.5 (was 5)
Early Ip gainstep at 8 (was 6). 

Plasma, still has an early burst of runaways
Marfe .17 to .4sec
Diverts at .22sec 

Try to get div even earlier. 


Apr 12 2007 02:21:25:710PM1070412016Steve Wolfe
Shot#16: Start CLEARIN ramp at .10 (from .110s) 
ramp to .015@0.15s (was .2). 

TF crowbar during plasma, tripped near t=0.
Plasma to 1.3sec. Still have the marfe and the runaways.
Diverted at 0.2sec. There will be a fairly long delay to
check and replace TF fuses. Cell access when the N2 clears.

We will probably have a TF test before going back to plasma. 


Apr 12 2007 04:02:05:313PM1070412017Steve Wolfe
Shot#17: Leave divertor program alone, try long Ip ramp:
600kA at 1.0sec (was .5sec)
Turn on dpcs_ftae2 Active MHD for Jason

All fuses check out. There is a TF convertor problem that's been 
there for two weeks, at least, possibly a bad device or fuse. 
All busses check ok. Gwinn thinks ok to go for plasma, can try 
a hipot tomorrow or next week, if it doesn't get worse.

Plasma, runaways look worse. Slower than linear Ip rise before .3sec
Diverts at 0.2sec, then goes back limited briefly. 
Density has an early rise, entre deux marfes.
Xrays are rising mostly avter 0.2sec, early bounce still there,
but smaller. 

Next: Drop OH1_VOLT and raise EF3_VOLT before 15ms.
Raise density to 5e19 faster. 



Apr 12 2007 04:13:38:803PM1070412018Steve Wolfe
Shot#18: Early OH1_VOLT plateau from 150 to 125
EF3 from 2400 to 2550. 
Raise nl04 faster. Initial Clearin from .015 to .018
Diverted after 180ms, stays off the wall
Early bounce is worse. Long Ip pause between .1 and .25sec

Try to fix Ip rise early


Apr 12 2007 04:26:02:243PM1070412019Steve Wolfe
Shot#19: Ip gain at 8 after .1sec, add Ip point at .3s, 400ka
Zcur drop to -.02 at .16 (was .20)
Slow down nl04 rise (to .4sec)
No runaways and we got what we asked for on the current rise. 
That's a beaut! Diverts at 0.2 and stays steady, density rise looks
smooth. 

Next: try to move divertor even earlier.


Apr 12 2007 04:38:58:843PM1070412020Steve Wolfe
Shot#20: Seg 2 start to .08
Make sure gains start earlier. 
Clearin and zcur ramp to .12sec

Fizzle. Bouncer didn't make it. 


Apr 12 2007 04:55:43:270PM1070412021Steve Wolfe
Shot#21:PG4 to 25ms from 23
 Seg 2 start to .08
Make sure gains start earlier. 
Clearin and zcur ramp to .12sec

PLasma and runaways both back 
Bounce is back too.
Divertor at same time, 0.2sec 


Apr 12 2007 05:13:14:590PM1070412022Steve Wolfe
Shot#22: Clearin P from 7.5 to 10 early
Turn on I gain of 0.5 at 0.1sec
Initial RXL at -.01

Plasma full length, no runaways. 
Diverts at .18sec
Density rise has a bit of a bump, couple of small injections. 
Nice shot. No bounce on startup. 
Initial xpoint is still near outer nose, could have stood 
even more negative RXL would have been better. 

ICRF makes an H-mode at 1.1sec

End of run. Left a good one on the drum. 


Apr 12 2007 06:08:54:030PM1070412022Steve Wolfe
Following the run, turn off dpcs_ftae2.
It turns out that the output was saturated because
the AE_order in the magnetics tree was set to 1 instead of 2 (?)
and the resulting frequencies were above 1MHz for these low
density shots. 

Engineering Operator Comments
ShotTimeTypeStatusComment
109:06:38:060AMPlasmaOk
210:02:26:927AMPlasmaOk
310:18:09:260AMPlasmaOk
410:34:59:907AMTestBad
510:52:44:053AMPlasmaOk
611:20:09:140AMPlasmaOk
711:39:36:057AMPlasmaOk
811:52:22:937AMPlasmaOk
912:06:56:207PMPlasmaOk
1012:21:15:447PMPlasmaOk
1112:36:30:470PMPlasmaOk
1201:07:44:887PMPlasmaOk
1301:22:27:250PMPlasmaOk
1401:34:49:053PMPlasmaBadNo TF
1501:47:02:747PMPlasmaOk
1602:00:22:080PMPlasmaBadTF Comm fault
1703:52:44:577PMPlasmaOk
1804:07:47:127PMPlasmaOk
1904:20:19:227PMPlasmaOk
2004:35:00:983PMPlasmaOk
2104:47:34:080PMPlasmaOk
2205:01:10:273PMPlasmaOk

System Availability
Apr 12 2007 09:06:12:780AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Apr 04 2007 01:39PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 2-8 operational, cross-calibrated.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem ready for tests into plasmaApr 10 2007 08:43AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable by 4/2Mar 27 2007 04:44PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesstill a problem with the post shot script; this is being fixed by hand at presentMar 29 2007 11:45AM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 60, 75 and 88GHz (no sidebands) channels are connected and being tested. The rest are disconnectedApr 10 2007 10:32PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port WASP successfully collected data on 04/04. Working on final plunge calibration. Some intermittent open circuit on SE Electrode. No data yet taken with K-WASP.Apr 05 2007 10:19AM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - Coreyes2 lasers, 8 polychromators + 3 old (and less accurate) spectrometers. Density is not calibrated yet. Temperatures from polychromators should be reliable.Apr 11 2007 12:24AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoExpected operational after Apr. 13, following recalibration of new spectral channelApr 11 2007 12:22AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
Vispecno Apr 06 2007 08:51AM (agraf)Alex GrafVisible Spectrometeragraf


Apr 12 2007 01:07:25:760PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersects the beam at the range major_R=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersects the beam at the range major_R=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Apr 04 2007 01:39PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 2-8 operational, cross-calibrated.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem ready for tests into plasmaApr 10 2007 08:43AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable soonApr 12 2007 01:02PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesstill a problem with the post shot script; this is being fixed by hand at presentMar 29 2007 11:45AM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 60, 75 and 88GHz (no sidebands) channels are connected and being tested. The rest are disconnectedApr 10 2007 10:32PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port WASP successfully collected data on 04/04. Working on final plunge calibration. Some intermittent open circuit on SE Electrode. No data yet taken with K-WASP.Apr 05 2007 10:19AM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - Coreyes2 lasers, 8 polychromators + 3 old (and less accurate) spectrometers. Density is not calibrated yet. Temperatures from polychromators should be reliable.Apr 11 2007 12:24AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoExpected operational after Apr. 13, following recalibration of new spectral channelApr 11 2007 12:22AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
Vispecno Apr 06 2007 08:51AM (agraf)Alex GrafVisible Spectrometeragraf


Apr 12 2007 03:52:21:887PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Apr 12 2007 03:46PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 2-8 operational, cross-calibrated.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem ready for tests into plasmaApr 10 2007 08:43AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable soonApr 12 2007 01:02PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesstill a problem with the post shot script; this is being fixed by hand at presentMar 29 2007 11:45AM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 60, 75 and 88GHz (no sidebands) channels are connected and being tested. The rest are disconnectedApr 10 2007 10:32PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoA-port WASP successfully collected data on 04/04. Working on final plunge calibration. Some intermittent open circuit on SE Electrode. No data yet taken with K-WASP.Apr 05 2007 10:19AM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - Coreyes2 lasers, 8 polychromators + 3 old (and less accurate) spectrometers. Density is not calibrated yet. Temperatures from polychromators should be reliable.Apr 11 2007 12:24AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoExpected operational after Apr. 13, following recalibration of new spectral channelApr 11 2007 12:22AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
Vispecno Apr 06 2007 08:51AM (agraf)Alex GrafVisible Spectrometeragraf


Apr 12 2007 04:20:04:070PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersno2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm.Apr 12 2007 03:46PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 2-8 operational, cross-calibrated.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex IIIno Jan 14 2007 01:53PM John RiceHigh Resolution X-Rayince,rice
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesSystem ready for tests into plasmaApr 10 2007 08:43AM (dterry)Ron ParkerLower Hybriddterry,parker
LPInoavailable soonApr 12 2007 01:02PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoPreparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs.Mar 27 2007 05:30PM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesstill a problem with the post shot script; this is being fixed by hand at presentMar 29 2007 11:45AM (terry)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 60, 75 and 88GHz (no sidebands) channels are connected and being tested. The rest are disconnectedApr 10 2007 10:32PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - Coreyes2 lasers, 8 polychromators + 3 old (and less accurate) spectrometers. Density is not calibrated yet. Temperatures from polychromators should be reliable.Apr 11 2007 12:24AM (jwhughes)Jerry HughesThomson Scattering - Corejwhughes
TS - EdgenoExpected operational after Apr. 13, following recalibration of new spectral channelApr 11 2007 12:22AM (jwhughes)Jerry HughesThomson Scattering - Edgejwhughes
Vispecno Apr 06 2007 08:51AM (agraf)Alex GrafVisible Spectrometeragraf