| Session Leader Comments |
| Apr 13 2007 09:12:42:513AM | 1070413001 | Greg Wallace | Test of NINJA on low density plasma. Fill plenum to 12psi and hit plasma at .8sec.
6 X 10ms LH pulses starting at .7sec. Scan phase 60, 90, 120 twice during pulse. Launcher at 1.5mm behind limiter. Spectrum analyzer T'd into mid-D LH probe for observation of PDI. D side probes in saturation, B side swept.
REFCO 60 90 120
AB 20% 50% 75%
CD 25% 50% 70%
LH Probe Density
Top 5-3e17
Mid 3.5-2.5e17
Bot 5-2e17
nl_04 at 3.6-2.8e19 m^-2, ramping down through LH pulse. NINJA did not fire. Will repeat same shot with NINJA on.
|
| Apr 13 2007 09:46:31:257AM | 1070413002 | Greg Wallace | Test of NINJA on low density plasma. Fill plenum to 12psi and hit plasma at .8sec.
6 X 10ms LH pulses starting at .7sec. Scan phase 60, 90, 120 twice during pulse with mechanical phase shifters set at 90. Launcher at 1.5mm behind limiter. Spectrum analyzer T'd into mid-D LH probe for observation of PDI. D side probes in saturation, B side swept.
REFCO 60 90 120
AB 25% 40% 70%
CD 20% 45% 60%
LH Probe Density
Top 4-9e17
Mid 4-3e17
Bot 5-2e17
nl_04 at 3.2-5.1e19 m^-2, ramping up from .8sec. Next shot will move NINJA up to .7sec.
|
| Apr 13 2007 09:51:02:990AM | 1070413003 | Greg Wallace | Test of NINJA on low density plasma. Fill plenum to 12psi and hit plasma at .7sec.
6 X 10ms LH pulses starting at .7sec. Scan phase 60, 90, 120 twice during pulse with mechanical phase shifters set at 90. Launcher at 1.5mm behind limiter. Spectrum analyzer T'd into mid-D LH probe for observation of PDI. D side probes in saturation, B side swept.
REFCO 60 90 120
AB 25% 40% 60%
CD 25% 40% 60%
LH Probe Density
Top 7-12e17
Mid 4e17
Bot 3-5e17
nl_04 at 3.3-5.8e19 m^-2, ramping up from .7sec. Next shot will increase outer gap by 10mm.
|
| Apr 13 2007 10:23:29:633AM | 1070413004 | Greg Wallace | Test of NINJA on low density plasma. Fill plenum to 12psi and hit plasma at .7sec.
6 X 10ms LH pulses starting at .7sec. Scan phase 60, 90, 120 twice during pulse with mechanical phase shifters set at 90. Launcher at 1.5mm behind limiter. Spectrum analyzer T'd into mid-D LH probe for observation of PDI. D side probes in saturation, B side swept.
REFCO 60 90 120
AB 60% 90% 100?%
CD 60% 90% 100?%
LH Probe Density
Top 1-3e17
Mid 1-1.5e17
Bot .6-1.2e17
nl_04 at 3-6e19 m^-2, ramping up from .7sec. Outer gap 10mm larger than shot 3.
Reflections over 60% for all phases. Net power is negative(?) for 120 phasing, suggesting something wrong with the net power calculation.... Next shot will increase NINJA to 20psi.
|
| Apr 13 2007 05:28:03:827PM | 1070413005 | Greg Wallace | Test of NINJA on low density plasma. Fill plenum to 20psi and hit plasma at .7sec.
6 X 10ms LH pulses starting at .7sec. Scan phase 60, 90, 120 twice during pulse with mechanical phase shifters set at 90. Launcher at 1.5mm behind limiter. Spectrum analyzer T'd into mid-D LH probe for observation of PDI. D side probes in saturation, B side swept.
REFCO 60 90 120
AB 40% 50% 80%
CD 50% 75% 90%
LH Probe Density
Top 3.5-9e17
Mid 2-3.5e17
Bot 1-3.5e17
nl_04 at 3.5-9e19 m^-2, ramping up from .7sec.
Next shot will turn off NINJA and start run LH in startup at .1sec.
|
| Apr 13 2007 10:45:23:120AM | 1070413006 | J. Randall Wilson | turn to trying to couple power during current ramp
first look at short power pulses
timing didn't change
|
| Apr 13 2007 10:50:56:280AM | 1070413007 | J. Randall Wilson | move to 0.1 s
created many fast electrons
looks like 90 degree phasing will be best coupling
go to flat long pulse next time
|
| Apr 13 2007 11:32:09:557AM | 1070413008 | J. Randall Wilson | succesful 0.3 s pulse
|
| Apr 13 2007 11:32:42:383AM | 1070413009 | J. Randall Wilson | raise power
pulse 0.2 s
may have tripped due to large x-ray level??
|
| Apr 13 2007 11:50:05:007AM | 1070413010 | J. Randall Wilson | pulse good at same level as shot 9
x-rays less
|
| Apr 13 2007 12:13:21:077PM | 1070413011 | J. Randall Wilson | increase to 380 kW
|
| Apr 13 2007 12:14:32:580PM | 1070413011 | J. Randall Wilson | increase to 380 kW
good pulse
|
| Apr 13 2007 12:29:03:613PM | 1070413012 | J. Randall Wilson | increase to >400 kw
trip circulator arc?
|
| Apr 13 2007 12:41:31:290PM | 1070413013 | J. Randall Wilson | increase to 490kW
1 drop-out
see ece emission some (small) effect on loop voltage
|
| Apr 13 2007 12:57:02:673PM | 1070413014 | J. Randall Wilson | increase to 625 kW
2 drop-outs
clearer effect on loop voltage
|
| Apr 13 2007 01:08:38:910PM | 1070413015 | J. Randall Wilson | increase to 680 kW
1 drop-outs
clearer effect on loop voltage
|
| Apr 13 2007 01:25:20:950PM | 1070413016 | J. Randall Wilson | same power
disruption after lh off before ICRF
now lets try simultaneous with ICRF
start with gregs 6 pulse low power waveform
|
| Apr 13 2007 01:54:04:663PM | 1070413018 | J. Randall Wilson | move during icrf
icrf drop-outs complicate picking phase (maybe 90 OK)
try again
|
| Apr 13 2007 02:26:24:830PM | 1070413020 | J. Randall Wilson | density appears too low during ICRF
raise pre ICRF density to 6e19
|
| Apr 13 2007 02:56:47:407PM | 1070413021 | J. Randall Wilson | raised density before ICRF
should be fine but still large reflection during ICRF
guessing density drops dramitically during H-mode
next shot decrease outer gap
|
| Apr 13 2007 03:01:26:900PM | 1070413022 | J. Randall Wilson | decreased outer gap
appears to have improved things somewhat
60 degree starting to show some net power
|
| Apr 13 2007 03:16:09:500PM | 1070413023 | J. Randall Wilson | decreased outer gap further
appears to have improved things somewhat
60 degree a little more net power
90 showing some
next shot lower d-port icrf
|
| Apr 13 2007 03:30:58:270PM | 1070413024 | J. Randall Wilson | just j port
better almost satisfactory
next try d port only
|
| Apr 13 2007 03:50:53:853PM | 1070413025 | J. Randall Wilson | d port only
OK but density high ratty h-mode
repeat without early ninja puffing
|
| Apr 13 2007 03:51:37:043PM | 1070413026 | J. Randall Wilson | d port only
less OK cleaner h-mode
no ninja
next shot lower D-port power
|
| Apr 13 2007 04:14:22:013PM | 1070413027 | Greg Wallace | 400kW on D port ICRF. Reflections ~50% at 60 and 90, 80% at 120. Next shot will be at 1.5MW on J port.
|
| Apr 13 2007 04:35:34:120PM | 1070413029 | Greg Wallace | Ohmic H-mode. Reflections not great but not terrible: 40, 60, 90% for 60, 90, 120 phasing. Will try for a bit better match of the plasma to the grill on the next shot by moving the entire plasma down by 5mm.
|
| Apr 13 2007 04:59:20:847PM | 1070413030 | Greg Wallace | Ohmic H-mode at 6T, moved plasma down to match shape better. Refco ~20% on AB row, but ~35% on CD row for 60deg. 90 and 120 phasing did not couple well, especially on lower rows. Edge density was still quite low ~2e17 on lower LH probes.
|
| Apr 13 2007 04:56:29:940PM | 1070413031 | Greg Wallace | Ohmic shot for MSE baseline. Tried to run LH from 1-1.3s but tripped out because no power on klys 12. Last shot will repeat with 10kW on klys 12.
|
| Apr 17 2007 11:36:21:870AM | 1070413032 | Greg Wallace | Last shot. CPS prevented LH from turning on.
|
| Physics Operator Comments |
| Apr 13 2007 09:10:49:810AM | 1070413001 | Earl Marmar | load from 1070330004, go for plasma
plasma, early and late hards
good ICRF heating, H-modes
|
| Apr 13 2007 09:28:53:733AM | 1070413002 | Earl Marmar | add 2 msec to prefill puff (now 26 msec)
ninja (A-B) will be on for this shot, starting at 0.8 seconds
plasma; nicer startup, no bounce, early hards gone
|
| Apr 13 2007 09:37:47:567AM | 1070413003 | Earl Marmar | no PCS changes
ninja starting earlier (should hit the plasma at 0.7 seconds)
plasma
|
| Apr 13 2007 10:11:04:927AM | 1070413004 | Earl Marmar | RCUR decreased by 5 mm, clearin unchanged, want to increase outer gap by 1 cm
plasma
outer gap increased by about 6 mm
a lot of spectroscopy signals appear to have been triggered well before the shot,
showing bit noise (CII, z-bright, neuts_hards, ...)
Josh is looking into it.
|
| Apr 13 2007 10:43:17:230AM | 1070413005 | Earl Marmar | no pcs changes. Argon enabled (50 msec pulse starting at .3 s)
plasma
|
| Apr 13 2007 10:38:44:633AM | 1070413006 | Earl Marmar | no pcs changes
plasma
|
| Apr 13 2007 11:17:31:177AM | 1070413007 | Earl Marmar | RCUR back to the way it was on shot 1, increasing it 5 mm from shot 6.
plasma
LH turns on at 0.1 seconds, then hards go wild
starting with this shot, the pumping stack gate valves are being kept closed during pulse and for 3 minutes thereafter
|
| Apr 13 2007 11:17:51:723AM | 1070413008 | Earl Marmar | no pcs changes
plasma
|
| Apr 13 2007 11:17:41:550AM | 1070413009 | Earl Marmar | no pcs changes
plasma
|
| Apr 13 2007 11:49:21:820AM | 1070413010 | Earl Marmar | no pcs changes
gate valves now being kept closed during pulse and for 300 seconds thereafter
plasma
|
| Apr 13 2007 12:19:28:160PM | 1070413011 | Earl Marmar | no pcs changes
plasma
|
| Apr 13 2007 12:19:34:487PM | 1070413012 | Earl Marmar | no pcs changes
plasma
|
| Apr 13 2007 01:19:03:010PM | 1070413013 | Earl Marmar | active mhd turned on for this shot (& subsequent)
plasma
|
| Apr 13 2007 01:19:14:883PM | 1070413014 | Earl Marmar | no pcs changes
plasma
|
| Apr 13 2007 01:19:21:667PM | 1070413015 | Earl Marmar | no pcs changes
plasma
|
| Apr 13 2007 01:19:51:603PM | 1070413016 | Earl Marmar | no pcs changes
plasma
disrupt at .54 seconds
|
| Apr 13 2007 01:34:30:920PM | 1070413017 | Earl Marmar | reduce prefill puff by 2 msec (to 24 msec)
fizzle; slightly late breakdown
|
| Apr 13 2007 02:05:21:713PM | 1070413018 | Earl Marmar | BR_0 offset .3 mT more negative (now -.001 Tesla), just to feel like I'm doing something.
plasma
|
| Apr 13 2007 02:05:48:870PM | 1070413019 | Earl Marmar | no pcs changes.
hung in init (server problem)
no power shot
|
| Apr 13 2007 02:27:00:223PM | 1070413020 | Earl Marmar | no pcs changes.
plasma
|
| Apr 13 2007 02:35:36:790PM | 1070413021 | Earl Marmar | nl_04 target to 6e19 from 3e19
plasma
fast current rise and bounce, lots of early hard x-rays
|
| Apr 13 2007 02:59:21:593PM | 1070413022 | Earl Marmar | increase prefill puff by 1 msec to 25 msec
flatten RCUR programming between .7 and 1.5 seconds to try to keep the outer gap a bit smaller during the RF pulses
plasma
early hards gone
|
| Apr 13 2007 03:11:27:013PM | 1070413023 | Earl Marmar | increase RCUR 1.5 mm after .7 seconds (to shrink outer gap ~3 mm)
plasma
outer gap ~4 mm during ICRF (with some lurches +/- 2 mm)
|
| Apr 13 2007 03:18:24:560PM | 1070413024 | Earl Marmar | no pcs changes
plasma
|
| Apr 13 2007 03:35:29:693PM | 1070413025 | Earl Marmar | no pcs changes
plasma
|
| Apr 13 2007 03:47:25:603PM | 1070413026 | Earl Marmar | no pcs changes
plasma
|
| Apr 13 2007 04:25:32:427PM | 1070413027 | Earl Marmar | no pcs changes
plasma
|
| Apr 13 2007 04:25:39:647PM | 1070413028 | Earl Marmar | no pcs changes
plasma
|
| Apr 13 2007 04:36:47:070PM | 1070413029 | Earl Marmar | load from 1070406013 (high elongation ohmic h-mode, 6 tesla)
import segment 1 from 1070413028
plasma
long, steady ohmic H-mode (as in the imported shot)
|
| Apr 13 2007 04:44:05:653PM | 1070413030 | Earl Marmar | move zcur down 5 mm (trying to a get bit better match between plasma and LH limiters)
plasma
ohmic H-mode again
|
| Apr 13 2007 05:13:40:773PM | 1070413031 | Earl Marmar | load from 1070413028
plasma
|
| Apr 13 2007 05:14:03:023PM | 1070413032 | Earl Marmar | no pcs changes
plasma
end of run
|
| System Availability |
| Apr 13 2007 09:03:12:017AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 2-8 operational, cross-calibrated. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System ready for tests into plasma | Apr 10 2007 08:43AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available soon | Apr 12 2007 01:02PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | The 60, 75 and 88GHz (no sidebands) channels are connected and being tested. The rest are disconnected | Apr 10 2007 10:32PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 polychromators + 3 old (and less accurate) spectrometers. Density is not calibrated yet. Temperatures from polychromators should be reliable. | Apr 11 2007 12:24AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Expected operational after Apr. 13, following recalibration of new spectral channel | Apr 11 2007 12:22AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | no | | Apr 06 2007 08:51AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 13 2007 11:44:42:677AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 2-8 operational, cross-calibrated. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System ready for tests into plasma | Apr 10 2007 08:43AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available soon | Apr 12 2007 01:02PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | The 60, 75 and 88GHz (no sidebands) channels are connected and being tested. The rest are disconnected | Apr 10 2007 10:32PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 polychromators + 3 old (and less accurate) spectrometers. Density is not calibrated yet. Temperatures from polychromators should be reliable. | Apr 11 2007 12:24AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Expected operational after Apr. 13, following recalibration of new spectral channel | Apr 11 2007 12:22AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | yes | looking for Ar X M1 line around 5533 A since shot 6 | Apr 13 2007 11:24AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 13 2007 01:14:35:913PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 2-8 operational, cross-calibrated. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System ready for tests into plasma | Apr 10 2007 08:43AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available soon | Apr 12 2007 01:02PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | The 60, 75 and 88GHz (no sidebands) channels are connected and being tested. The rest are disconnected | Apr 10 2007 10:32PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 polychromators + 3 old (and less accurate) spectrometers. Density is not calibrated yet. Temperatures from polychromators should be reliable. | Apr 11 2007 12:24AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Expected operational after Apr. 13, following recalibration of new spectral channel | Apr 11 2007 12:22AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | yes | looking for Ar XIV M1 line around 4412 A since shot 16 | Apr 13 2007 01:12PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 13 2007 03:41:23:790PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | no | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 2-8 operational, cross-calibrated. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | System ready for tests into plasma | Apr 10 2007 08:43AM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available soon | Apr 12 2007 01:02PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | no | Preparing external amplifiers and DAQ. Midplane ready soon, 2D ready by start of science runs. | Mar 27 2007 05:30PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | still a problem with the post shot script; this is being fixed by hand at present | Mar 29 2007 11:45AM (terry) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | The 60, 75 and 88GHz (no sidebands) channels are connected and being tested. The rest are disconnected | Apr 10 2007 10:32PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 8 polychromators + 3 old (and less accurate) spectrometers. Density is not calibrated yet. Temperatures from polychromators should be reliable. | Apr 11 2007 12:24AM (jwhughes) | Jerry Hughes | Thomson Scattering - Core | jwhughes | | TS - Edge | no | Expected operational after Apr. 13, following recalibration of new spectral channel | Apr 11 2007 12:22AM (jwhughes) | Jerry Hughes | Thomson Scattering - Edge | jwhughes | | Vispec | yes | looking for the absence of a Kr 22+ line around 3841 A since shot 25 | Apr 13 2007 03:33PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|