| Apr 26 2007 07:41:57:297AM | | Robert Granetz | I had the NINJA plenum pressure increased to 10 psi (abs) of D2 (instead of the
5 psi originally requested). This is because on the test stand we used
5 psi on the tank gauge, which actually is 20 psi absolute. So I thought
that 5 psi (abs) might be a little too low.
|
| Apr 26 2007 07:42:59:203AM | | Robert Granetz | Shot 1070411009 loaded (seg 2 active), and segment 1 loaded from 1070425014
(last plasma shot from yesterday).
|
| Apr 26 2007 07:47:28:953AM | | Robert Granetz | DNB is ready and set to fire into shot 1.
|
| Apr 26 2007 07:50:03:877AM | | Robert Granetz | I opened the hand (ball) valve prior to the run. There was no change
in torus pressure, and it doesn't change when I close the shaker
gate valve. I've left that gate valve open.
|
| Apr 26 2007 09:05:56:267AM | 1070426001 | Robert Granetz | Shot 01 -- Plasma, disrupted early, at t=0.42 s. No obvious cause.
Next shot: no changes.
|
| Apr 26 2007 09:23:59:803AM | 1070426002 | Robert Granetz | Shot 02 -- Plasma. Good full-length shot.
Next shot: increase nl_04 from 0.6 to 0.7e20 m-2
|
| Apr 26 2007 09:37:06:137AM | 1070426003 | Robert Granetz | Shot 03 -- Plasma. Disrupted at t=0.80 s due to something going on in the ceiling region
above the C-port area.
Next shot: no changes.
|
| Apr 26 2007 09:47:18:280AM | 1070426004 | Robert Granetz | Shot 04 -- Plasma. Good full-length shot. LH faulted a lot. ICRF fired from
t=1.2 to 1.6 s (E and J antennas).
Next shot: no changes.
|
| Apr 26 2007 10:02:09:320AM | 1070426005 | Robert Granetz | Shot 05 -- Plasma. Good full-length shot. P_LH=300 kW, t=0.7-1.2 s, pretty clean.
P_ICRF=2.0 MW, t=1.2-1.6 s, very clean.
Next shot: no changes.
|
| Apr 26 2007 10:14:52:557AM | 1070426006 | Robert Granetz | Shot 06 -- Plasma. Good full-length shot. P_LH=550 kW, some faulting.
ICRF had lots of faulting. DNB didn't fire.
Next shot: no DPCS changes.
|
| Apr 26 2007 10:24:46:060AM | 1070426007 | Robert Granetz | Shot 07 -- No plasma...no TF, for some unknown reason.
Next shot: try again.
|
| Apr 26 2007 11:03:20:340AM | 1070426008 | Robert Granetz | Shot 08 -- Plasma. Good full-length shot. LH faulted a lot. Picrf=2-2.8 MW.
Next shot: no DPCS changes.
|
| Apr 26 2007 11:03:46:700AM | 1070426009 | Robert Granetz | Shot 09 -- Plasma. Good full-length shot. Picrf=2.8 MW. Plh=400 kW, short pulse length.
Next shot: no DPCS changes.
|
| Apr 26 2007 11:23:43:257AM | 1070426010 | Robert Granetz | Shot 10 -- Plasma. Good full-length shot.
Next shot: no DPCS changes.
|
| Apr 26 2007 11:20:06:537AM | 1070426011 | Robert Granetz | In preparation for the 2nd half of today (dust run), I have created in segment 4 the
DPCS programming necessary for a gas-only shot. It was derived from yesterday's
beam-into-gas shots. I loaded this new segment 4 into the DPCS model tree prior to
this C-Mod shot, so I can grab it later today from any shot, starting with this one.
Note that it used PG4 to puff gas into the vessel (and no fields), but we may want
to try puffing dust into vacuum.
|
| Apr 26 2007 11:37:37:480AM | 1070426011 | Robert Granetz | Shot 11 -- Plasma. Good full-length shot. Startup wasn't so good, with an outside
hit. LH didn't fire.
Next shot: add 2 ms to pre-fill puff. Turn on argon puff (100 ms).
|
| Apr 26 2007 11:47:17:187AM | 1070426012 | Robert Granetz | Shot 12 -- Plasma. Good full-length plasma. Good startup. Hard x-rays nearly gone.
Picrf=3.3 MW, pretty steady.
Next shot: no DPCS changes.
|
| Apr 26 2007 12:05:04:880PM | 1070426013 | Robert Granetz | Shot 13 -- Plasma. Good full-length pulse.
Next shot: no DPCS changes.
|
| Apr 26 2007 12:24:52:373PM | 1070426014 | Robert Granetz | Shot 14 -- Plasma. Good full-length shot. LH and ICRF(J) overlapped, but not good for LH.
Next shot: reduce outer gap from 7 mm to 4 mm.
|
| Apr 26 2007 12:31:27:500PM | 1070426015 | Robert Granetz | Shot 15 -- no power shot cycle because a breaker pulled out during INIT.
Next shot: try the original plan again (decrease outer gap by 3 mm)
|
| Apr 26 2007 01:04:25:543PM | 1070426016 | Robert Granetz | Shot 16 - Plasma. Good shot, but disrupted at end of flattop. DIV2 stopped working on
the last shot (the no-power shot cycle). I can't get ahold of JT, so I asked Josh to
see what he can do. We need this camera for the dust experiment.
Next shot: no DPCS changes.
|
| Apr 26 2007 01:18:16:720PM | 1070426017 | Robert Granetz | Shot 17 -- Plasma. Good full-length plasma. Last shot of the LH half-day run.
Next shot: switch over to dust run. Use segment 2 from 1070404026.
|
| Apr 26 2007 01:33:48:400PM | 1070426018 | Robert Granetz | Shot 18 -- Plasma. Disrupted at 1.0 s, probably due to excessive dust injection.
DIV2 sees a bright stream coming out of the capillary, and some discrete
particles later in the puff. Injected signal saturates at 1.26e21 molecules.
Next shot: Turn off dust injector for next shot; see if we have problems getting
plasma back. For the next dust shot. NINJA supply pressure will be
reduced to 3 psi (from 10 psi) of D2. Pulse length will be reduced
to 100 ms (from 150 ms).
|
| Apr 26 2007 01:41:56:887PM | 1070426019 | Robert Granetz | Shot 19 -- Fizzle. Fields and pressure are good. Just post-disruption post-dust recovery.
Next shot: no changes, try again.
|
| Apr 26 2007 01:54:17:783PM | 1070426020 | Robert Granetz | Shot 20 -- Fizzle.
Next shot: reduce pre-fill by 4 ms.
|
| Apr 26 2007 03:05:03:873PM | 1070426021 | Robert Granetz | Shot 21 -- Dud. EF1's didn't charge up properly.
Next shot: try, try again.
|
| Apr 26 2007 04:13:34:070PM | 1070426022 | Robert Granetz | Shot 22 -- Fizzle.
Next shot: decrease pre-fill another 2 ms; add -10 amps to IC_EF4.
|
| Apr 26 2007 04:31:01:890PM | 1070426023 | Robert Granetz | Shot 23 -- Plasma. (forgot what it looked like). Good full-length shot. Dust injection
was turned off for this shot
Next shot: turn on dust injection. Add 2 ms to pre-fill. Add 5 amps to IC_EF4.
NINJA plenum pressure will be 3 psi, pulse length=0.100 s.
|
| Apr 26 2007 05:09:21:577PM | 1070426024 | Robert Granetz | Shot 24 -- Plasma. Good full-length shot. Dust injection was on, although we
purposely did not run the boron shaker beforehand. We did see some dust
""""sliding"""" down the outer divertor shelf, which may imply that there
is not a lot of toroidal motion.
Next shot: add 5 amps to IC_EF4. Decrease pre-fill puff 2 ms. Also, a lithium pellet
will be fired in at t=1.6 s.
|
| Apr 26 2007 05:16:47:703PM | 1070426025 | Robert Granetz | Shot 25 -- Plasma. Good shot. Dust injector fired. We could probably use more
dust. Brock's lithium pellet killed the plasma at t=1.6 s. Startup
was awful on this shot. Don't use this startup segment. DNB also fired.
End of run.
|
| System Availability |
| Apr 26 2007 08:57:19:653AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Midplane foils being digitized but not calibrated. Midplane AXUV being digitized but analyzed data not ready. 2D (what's left of it) should be ready after maintenance week. | Apr 19 2007 09:52AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Not operational for week of 4/22. Installing Ch 9 detector. | Apr 20 2007 12:45AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Troubleshooting HV Enable circuit for carts. | Apr 24 2007 01:02PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available soon | Apr 12 2007 01:02PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D should be ready after maintenance week. | Apr 16 2007 05:34PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Starting on 4/23, 60GHz and 110GHz are working. 132GHz is being tested. For shot 1070425007 the waveform generator is set at 6VDC | Apr 25 2007 10:51AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | Apr 24 2007 08:23PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | looking around 441.2 nm for Ar XIV (or for lack of) | Apr 24 2007 02:55PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 26 2007 09:24:31:680AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil has 180 Hz noise source. Midplane foils being digitized but not calibrated. Midplane AXUV being digitized but analyzed data not ready. 2D (what's left of it) should be ready after maintenance week. | Apr 19 2007 09:52AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Not operational for week of 4/22. Installing Ch 9 detector. | Apr 20 2007 12:45AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Troubleshooting HV Enable circuit for carts. | Apr 24 2007 01:02PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available soon | Apr 12 2007 01:02PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D should be ready after maintenance week. | Apr 16 2007 05:34PM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Starting on 4/23, 60GHz and 110GHz are working. 132GHz is being tested. For shot 1070425007 the waveform generator is set at 6VDC | Apr 25 2007 10:51AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 1 laser, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | Apr 26 2007 09:18AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | looking around 441.2 nm for Ar XIV (or for lack of) | Apr 24 2007 02:55PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 26 2007 10:36:33:427AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Not operational for week of 4/22. Installing Ch 9 detector. | Apr 20 2007 12:45AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Troubleshooting HV Enable circuit for carts. | Apr 24 2007 01:02PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available soon | Apr 12 2007 01:02PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Starting on 4/23, 60GHz and 110GHz are working. 132GHz is being tested. For shot 1070425007 the waveform generator is set at 6VDC | Apr 25 2007 10:51AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 1 laser, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | Apr 26 2007 09:18AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | looking around 441.2 nm for Ar XIV (or for lack of) | Apr 24 2007 02:55PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 26 2007 12:13:22:010PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Not operational for week of 4/22. Installing Ch 9 detector. | Apr 20 2007 12:45AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | Troubleshooting HV Enable circuit for carts. | Apr 24 2007 01:02PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available soon | Apr 12 2007 01:02PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Starting on 4/23, 60GHz and 110GHz are working. 132GHz is being tested. The waveform generator is set at 6VDC | Apr 26 2007 12:11PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 1 laser, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | Apr 26 2007 09:18AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | looking around 441.2 nm for Ar XIV (or for lack of) | Apr 24 2007 02:55PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 26 2007 01:49:33:953PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Not operational for week of 4/22. Installing Ch 9 detector. | Apr 20 2007 12:45AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | | Apr 26 2007 01:38PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available soon | Apr 12 2007 01:02PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Starting on 4/23, 60GHz and 110GHz are working. 132GHz is being tested. The waveform generator is set at 6VDC | Apr 26 2007 12:11PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 1 laser, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | Apr 26 2007 09:18AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | looking around 441.2 nm for Ar XIV (or for lack of) | Apr 24 2007 02:55PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 26 2007 04:20:55:323PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Not operational for week of 4/22. Installing Ch 9 detector. | Apr 20 2007 12:45AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | | Apr 26 2007 01:38PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | no | available soon | Apr 12 2007 01:02PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Starting on 4/23, 60GHz and 110GHz are working. 132GHz is being tested. The waveform generator is set at 6VDC | Apr 26 2007 12:11PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 1 laser, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | Apr 26 2007 09:18AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | looking around 494.5 nm for B II and B V | Apr 26 2007 04:15PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|