| Session Leader Comments |
| Apr 27 2007 09:12:41:940AM | 1070427001 | Greg Wallace | LH fired at 0s due to operator error. Repeat on next shot at .7s as originally planned.
|
| Apr 27 2007 09:34:20:307AM | 1070427002 | Greg Wallace | LH fired at .7s as requested. Many trips but two sustained periods with power on with ICRF at 1 and 1.5MW on J. Coupling was not bad (~20% reflections) during second pulse. Higher reflections during first pulse on bottom rows. Try same shot again without late ICRF from E port to prevent another disruption?
|
| Apr 27 2007 09:56:54:003AM | 1070427003 | Greg Wallace | Another disruption. Steve Wolfe is looking into the cause.
Nearly identical LH response as last shot. Coupling doesn't look too bad at 1 and 1.5MW on J, but tripping is due to what appears to be arc in waveguide 9. Next shot will turn off ICRF to prevent disruption and turn power down to 40kw on klystron 5.
|
| Apr 27 2007 10:07:18:210AM | 1070427004 | Greg Wallace | No ICRF on this shot. Arcing in jungle gym on klystron 5 during first part of pulse. Trips out, then turns on clean. The problem appears to be getting better due to conditioning. Next shot will have same LH power with steady 1MW of ICRF from J.
|
| Apr 27 2007 10:20:38:010AM | 1070427005 | Greg Wallace | No disruption with steady 1MW from J. LH had early arcing on channel 9 & 10, but went away after trip and retry. LH tripped out and did not turn on after 1s; likely cause appears to be loss of density in front of grill which caused poor overall coupling. Next shot will have same LH programming (continue with conditioning) and ICRF will step from 1 to 1.5MW at 1s.
|
| Apr 27 2007 10:35:21:300AM | 1070427006 | Greg Wallace | Shot ran without disruption with 1-1.5MW from J ICRF. No nonthermal signs on loop voltage or ECE, and very big PDI on this shot and shot 5. Decreasing density should help accessability and PDI. Next shot will be same for LH and ICRF, but decreasing density to 6e19 on nl_04.
|
| Apr 27 2007 11:14:57:500AM | 1070427007 | Greg Wallace | Again, arcing in WG 9&10 during first part of pulse, cleaned up by trip and retry. Second part of pulse tripped when density decreased rapidly. Next shot will increase power on other waveguides while keeping power level on klystron 5 same.
|
| Apr 27 2007 11:07:25:390AM | 1070427008 | Greg Wallace | LH started shot clean, then some arcing in channel 9&10 at 750ms. Clean after trip and retry. Still having density drop during later part of pulse which causes high intrinsic reflection and subsequent tripping. Next shot will ramp LH power to try to avoid the arcing in channel 9&10.
|
| Apr 27 2007 11:11:41:077AM | 1070427009 | Greg Wallace | No LH. Repeat for next shot.
|
| Apr 27 2007 11:30:02:397AM | 1070427010 | Greg Wallace | No LH again. Still seems to be a TPS problem.
|
| Apr 27 2007 12:27:39:390PM | 1070427011 | Greg Wallace | LH ran clean until 800ms. At this point density had dropped too much and tripped because of high intrinsic reflection on WG8T. Next shot will move ICRF back by 200ms to see if we can run longer pulse.
|
| Apr 27 2007 12:44:44:457PM | 1070427012 | Greg Wallace | More trips from 8T, even with ICRF off during first part of LH pulse. Looks like we need to change the trip level on that channel.
|
| Apr 27 2007 12:55:33:337PM | 1070427013 | Greg Wallace | LH trip before ICRF turns on. Short retry pulse during ICRF but trips out again as density drops. Next shot will decrease outer gap from 7mm to 3mm to try to keep density up in front of grill.
Cell access to change trip level on waveguide 8T.
|
| Apr 27 2007 01:20:13:940PM | 1070427014 | Greg Wallace | Ran clean until 980ms, then tripped due to drop in density at grill.
Next shot will be Andrea's fast electron diffusion measurements.
|
| Apr 27 2007 03:14:17:013PM | 1070427015 | Andrea Schmidt | nl04=5e19, Ip=800, LH modulation (lots of trips)
|
| Apr 27 2007 03:14:32:107PM | 1070427016 | Andrea Schmidt | nl04=5e19, Ip=800, LH modulation (no trips)
|
| Apr 27 2007 03:14:46:170PM | 1070427017 | Andrea Schmidt | nl04=5e19, Ip=500, LH modulation (no trips)
|
| Apr 27 2007 03:15:34:013PM | 1070427018 | Andrea Schmidt | nl04=1e20, Ip=500, disruption before LH
|
| Apr 27 2007 03:16:05:157PM | 1070427019 | Andrea Schmidt | ??? no plasma
|
| Apr 27 2007 03:15:47:437PM | 1070427020 | Andrea Schmidt | nl04=1e20, Ip=500, disruption before LH
|
| Apr 27 2007 03:17:53:297PM | 1070427021 | Andrea Schmidt | nl04=1e20, Ip=800 kA, plasma back, no LH. Next shot same, with LH (hopefully).
|
| Physics Operator Comments |
| Apr 26 2007 06:06:08:940PM | | Ron Parker | Engineering setup for Friday 27 April 2007
MP 473 Lower Hybrid System Checkout and Initial Operation (1/3)
MP 468 LH-driven Fast Electron Diffusion Time Measurement (1/3)
MP 464 LHCD Coupling Optimization (1/3)
Session leaders: R. Wilson (MP 473), A. Schmidt (MP 468), G. Wallace (MP 464)
Physics operator: R. Parker
ECDC overnight in D2, pressure=2e-4 Torr. Rmin/Rdwell/Rmax = 44/45/103 cm.
Bake at 60 C.
The run will start at 09:00 and end at 17:00.
Power systems as on 1070426012.
A-coil configuration: normal [Dtop -Dbot -Jtop +Jbot] and enabled.
Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 5 psi D2 DISABLED
Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, Z-bolo shutters
Torvac setup: Gate valves open during pulse.
Special diagnostics: Hard x-ray camera, DNB (MSE), core & edge TS (even if
uncalibrated)
-------------------------------------------------------------------------------
LH Setup: ready to operate at beginning of run.
ICRF Setup: J-port ready to go for beginning of run.
DNB: desired for entire day.
-------------------------------------------------------------------------------
Run plan:
Plasma from 1070426017. LH launcher at 1.5mm behind limiter, and mechanical phase shifters 90deg co-current drive.
1) Start with J-port antenna power scan. Turn on J at 1MW at .7sec, then increase to 1.5MW at .9sec, then 2MW at 1.1sec.
LH on at .7sec. Start with 50kW per klystron for a 500ms pulse @ 60deg.
1b) Repeat same, but increase LH power by 50kW per klystron with each shot until we cannot increase power. (~5 shots total)
1c) If we cannot couple at low ICRF power, try inner wall diverted plasma to increase outer edge density.
2) Repeat 1 with E-port antenna.
This is plan for MP 473 and MP 464 part of run. If good LHCD conditions
can be established, proceed to MP 468 in afternoon.
|
| Apr 27 2007 09:16:19:360AM | 1070427001 | Ron Parker | First shot started up well, but disrupted at 1.37 s-- maybe due to ICRF @ 2.5 MW from J-port. LH fired at t=0, operator error. Next shot may fizzle.
|
| Apr 27 2007 09:16:39:470AM | 1070427001 | Ron Parker | Good morning, all systems functioning, first shot should be punctual.
|
| Apr 27 2007 09:30:57:757AM | 1070427002 | Ron Parker | Shot 2 started well, but again disrupted after turnon of ICRF on E-port.
LH trips many times, and steady phases last only ~ 100 ms. Interesting sidebands, both due to ICRF (symmetric) and probably PDI (asymmetric).
Next, turn E-port off, limit J to 2 MW.
|
| Apr 27 2007 09:55:33:110AM | 1070427003 | Ron Parker | Shot again starts well, but disrupts at the same time as earlier shots.
Steve thinks spurious signal from ICRF may get into EF controller.
We'll hold shot while trouble shooting.
Next shot, we'll hold the ICRF off.
|
| Apr 27 2007 10:07:28:193AM | 1070427004 | Ron Parker | Shot 4 ran well, no disruption: ICRF pickup seems to be the problem.
Less than .1 V loop voltage drop due to LH @ n_eL(4)=0.75e20.
Next: run ICRF at 1 MW steady from J port, 0.7-1.2 s
|
| Apr 27 2007 10:37:01:377AM | 1070427005 | Ron Parker | Shot 5 ran well, no disruption. Seems to confirm that ICRF was triggering disruption.
|
| Apr 27 2007 10:23:22:887AM | 1070427006 | Steve Wolfe |
Shot#6: No pcs changes that I know of.
Ron's out of the room so I pushed the button.
|
| Apr 27 2007 10:35:40:800AM | 1070427006 | Ron Parker | Shot 6 ran through. LH had multiple faults,
ICRF stayed on, 1.5 MW peak.
Try to lower density (set at 0.6e20) on next shot.
|
| Apr 27 2007 10:50:13:087AM | 1070427007 | Ron Parker | Shot 7 went off well, but LH had multiple trips.
Next: raise power to see if LH would increase grill density and improve coupling.
|
| Apr 27 2007 10:57:57:103AM | 1070427008 | Ron Parker | Shots keep coming, but LH has trouble staying on.
Next: try power ramp.
|
| Apr 27 2007 11:11:52:733AM | 1070427009 | Ron Parker | Shot 9 ran well.
No LH -- Transmitter arc detection faults.
|
| Apr 27 2007 11:41:26:603AM | 1070427010 | Ron Parker | Shot 10 ran OK, but LH again has a problem with tripout of the transmitter.
There will be delay, hopefully short, while the problem is trouble shot.
|
| Apr 27 2007 12:46:31:647PM | 1070427013 | Ron Parker | Shots 11-13 ran well, but with LH coupling problems.
Even without the ICRF, we are getting LH tripouts.
After shot 13, we have decided to have a cell access to adjust the LH trip levels.
|
| Apr 27 2007 02:40:46:987PM | 1070427014 | Ron Parker | Shot 14 ran well. LH good until ICRF came on.
|
| Apr 27 2007 02:41:09:300PM | 1070427015 | Ron Parker | Shot 15 ran OK, Andrea SL. LH coupling poor.
|
| Apr 27 2007 02:36:37:547PM | 1070427016 | Ron Parker | Shot 16 ran well, Andrea got data at 800 kA.
|
| Apr 27 2007 02:34:42:873PM | 1070427017 | Ron Parker | Shot 17 ran well, good data for Andrea at 500 kA.
|
| Apr 27 2007 05:10:07:200PM | 1070427017 | Ron Parker | Shot 17 was a good shot @ 500 kA with good LHRF pulses.
|
| Apr 27 2007 02:33:32:453PM | 1070427018 | Ron Parker |
Shot 18 disrupted early ,too fast a density rise (to 1e20 on m_el04.
|
| Apr 27 2007 05:07:14:887PM | 1070427019 | Ron Parker | Shot 19 did not commutate, no plasma.
|
| Apr 27 2007 05:11:47:200PM | 1070427020 | Ron Parker | Shot 20 disrupted, probably too much density at too low current (early on).
|
| Apr 27 2007 05:14:13:857PM | 1070427021 | Ron Parker | Back to 800 kA for shot 21. Shot ran well but no RF due to tube HV problem (Cart 3, tube 2)
|
| Apr 27 2007 05:04:58:307PM | 1070427022 | Ron Parker | Shot 22 (for Brock) fizzled.
|
| System Availability |
| Apr 27 2007 08:59:23:810AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Not operational for week of 4/22. Installing Ch 9 detector. | Apr 20 2007 12:45AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | | Apr 26 2007 01:38PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | The boards are out of the cell today (1070427) | Apr 27 2007 08:44AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 1 laser only (functionality of YAG2 is being addressed), 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | Apr 26 2007 09:49PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | starting survey at various wavelength positions between 350 and 450 nm | Apr 27 2007 08:27AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 27 2007 11:23:05:833AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | Warning: mssql_fetch_array(): supplied argument is not a valid MS SQL-result resource in /bigdisk/www/html/research/alcator/facility/system_availability/index.php on line 126
|
| Apr 27 2007 01:15:32:953PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Not operational for week of 4/22. Installing Ch 9 detector. | Apr 20 2007 12:45AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex III | no | | Jan 14 2007 01:53PM | John Rice | High Resolution X-Ray | ince,rice | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | | Apr 26 2007 01:38PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | The boards are out of the cell today (1070427) | Apr 27 2007 08:44AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 1 laser only (functionality of YAG2 is being addressed), 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | Apr 26 2007 09:49PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | starting survey at various wavelength positions between 350 and 450 nm | Apr 27 2007 08:27AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 27 2007 01:37:20:510PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Not operational for week of 4/22. Installing Ch 9 detector. | Apr 20 2007 12:45AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | | Apr 26 2007 01:38PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | The boards are out of the cell today (1070427) | Apr 27 2007 08:44AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 1 laser only (functionality of YAG2 is being addressed), 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | Apr 26 2007 09:49PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | starting survey at various wavelength positions between 350 and 450 nm | Apr 27 2007 08:27AM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| Apr 27 2007 02:39:00:610PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spacial resolution: 1.22 cm. | Apr 12 2007 03:46PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Not operational for week of 4/22. Installing Ch 9 detector. | Apr 20 2007 12:45AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | yes | | Apr 26 2007 01:38PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | no | The boards are out of the cell today (1070427) | Apr 27 2007 08:44AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 1 laser only (functionality of YAG2 is being addressed), 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | Apr 26 2007 09:49PM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | starting survey at various wavelength positions between 350 and 450 nm, channels 8 -11 of the inner wall toroidal gas puff views | Apr 27 2007 02:32PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|