Alcator C-Mod Run 1070503 Information

Back to runs

Miniproposals
Miniproposal:468
Date Filed: 3/8/2007
Title:LH-driven fast electron diffusion time measurement
First Author:Andrea Schmidt
Session Leader:Andrea Schmidt (shots 26-37)
Miniproposal:488
Date Filed: 4/27/2007
Title:Evaluation of the Fast Ferrite Tuning System on E-Port Antenna
First Author:Yijun Lin
Session Leader:Yijun Lin (shots 1-37)

Operators
Session leader(s):Yijun Lin,Andrea Schmidt
Physics operator(s):Earl Marmar
Engineering operator(s):Bill Cochran,Andy Pfeiffer,Bill Byford

Engineering Operator Run Comment
MP 488: Evaluation of Fast Ferrite Tuning (1/2 day)MP 468: Fast electron

Session Leader Plans
Entered: May 3 2007 09:36:16:077AM
Author: Yijun Lin
MP 488: Evaluation of FFT operation to plasma

1. Evaluate the FFT operation to L-H-L transition. (fine tune FFT parameters
if necessary)
2. Evaluate the performance in different plasma parameter spaces, like density, and current.
3. Evaluate the power handling capabilities.

Physics Operators Plans
Entered: May 2 2007 06:02:46:643PM
Author: Earl Marmar
Engineering setup for Thursday 03 May 2007

MP 488: Evaluation of Fast Ferrite Tuning (1/2 day)
MP 468: Fast electron diffusion (1/2 day)

Session leaders: Y. Lin (MP 488) A. Schmidt (MP 468)
Physics operator: E. Marmar (with help from Steve Wolfe)

ECDC overnight in D2, pressure=2e-4 Torr. Rmin/Rdwell/Rmax = 44/45/103 cm.
Bake at 60 C.

Due to the problem that occurred with flux loop F10 during Tuesday's run, plasma control programming has had to be changed. The current plan is to start testing this with plasma attempts (See Wolfe's logbook entries from 1070502 under MHD for details.)

Power systems as on 1070426013.

A-coil configuration: normal [Dtop -Dbot -Jtop +Jbot] and enabled.

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, Z-bolo shutters

Torvac setup: Gate valves open during pulse.


-------------------------------------------------------------------------------
LH Setup: ready to operate by 1:00 pm at the latest, but can piggyback in the earlier part of the run if desired, to be coordinated with Yijun with regard to timing during the discharges.

ICRF Setup: ready to operate D, E and J for first plasma at 9:00 am

Run Plan:
Assuming all goes well getting and controlling plasmas in the absence of the F10 flux loop, start with FFT tests on E-port, using J and/or D to get H-Modes. It is likely that at least the first hour or so of the run will be consumed trying to get breakdown and current rise. At some point, if sufficient progress has been made, we will switch over to MP 468.

We plan to start the run at 9:00 am and finish at 5:00 pm.

Session Leader Summaries
Entered: May 4 2007 09:56:21:390AM
Author: Yijun Lin
The FFT system has successfully run in the following conditions
1. L-H-L transitions.
2. nl04 from 0.4 to 1.0e20 m^-2, and Ip from .5 to .8 MA
3. Forward power at <500 kW (circulating power < 1.7 MW).

The arc detected on FFT2 promptly shut off the transmitter power. The protection
system worked well.

Future work:
1. Fill in SF6 instead of N2. This should raise the power handling.
2. Install notch filters on the fft direction coupler signals to decouple noise
pickup from D port.

(Additional note on 1070504: Possible water leak into the tank(s) caused by
pumping out the gas in the line when fixing the leak on the elbow. The chilling water pump was running at 45 psi. With the gas pressure gone, the water pressure differential was 60 psi. We have to take out the tanks and open them to fix the problem).
Entered: May 6 2007 09:31:42:590AM
Author: Andrea Schmidt
MP: 468

Second 1/2 day run summary:

We square-wave modulated the LH power, 12.5 ms on, 12.5 ms off, for a variety of conditions. We scanned density from nl04=5e19 to 1e20 with Ip=800 kA. We also got data for nl04=1e20 and nl04=7.5e20 at Ip=500 kA. At the end of the day, we switched to 60 degree approximate phasing and repeated a single shot (800 kA, nl04=5e19) several times in order to boxcar bin average over several shots of data. From piggybacking off of the morning's run, we also had several shots with Ip=800, nl04=7.5e19, 90 degree ideal phasing. During the last few runs, the pellet injector was allowed to fire.

Physics Operator Summaries
Entered: May 3 2007 05:50:51:593PM
Author: Earl Marmar
Engineering setup for Thursday 03 May 2007

MP 488: Evaluation of Fast Ferrite Tuning (1/2 day)
MP 468: Fast electron diffusion (1/2 day)

Session leaders: Y. Lin (MP 488) A. Schmidt (MP 468)
Physics operator: E. Marmar (with help from Steve Wolfe)

ECDC overnight in D2, pressure=2e-4 Torr. Rmin/Rdwell/Rmax = 44/45/103 cm.
Bake at 60 C.

Due to the problem that occurred with flux loop F10 during Tuesday's run, plasma control programming has had to be changed. The current plan is to start testing this with plasma attempts (See Wolfe's logbook entries from 1070502 under MHD for details.)

Power systems as on 1070426013.

A-coil configuration: normal [Dtop -Dbot -Jtop +Jbot] and enabled.

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, Z-bolo shutters

Torvac setup: Gate valves open during pulse.


-------------------------------------------------------------------------------
LH Setup: ready to operate by 1:00 pm at the latest, but can piggyback in the earlier part of the run if desired, to be coordinated with Yijun with regard to timing during the discharges.

ICRF Setup: ready to operate D, E and J for first plasma at 9:00 am

Run Plan:
Assuming all goes well getting and controlling plasmas in the absence of the F10 flux loop, start with FFT tests on E-port, using J and/or D to get H-Modes. It is likely that at least the first hour or so of the run will be consumed trying to get breakdown and current rise. At some point, if sufficient progress has been made, we will switch over to MP 468.

We plan to start the run at 9:00 am and finish at 5:00 pm.

___________________________________________________________________

After a rather frustrating start, the run went well for the afternoon. Not unexpectedly, we got fizzles on the first 2 shots, and then had 2 full length plasmas in a row after fiddling slightly with gas, BR0 offset and RCUR offset. Then we got 14 fizzles in a row, changing fill and fields. Finally, reducing the BR0 offset to -.002 from -.001 for shot 19, gave us plasma. After 1 more fizzle on shot 24, we settled with BR0 offset of -.003 and all subsequent shots went to full current.

Both MPs got useful shots.

Scorecard:
Plasmas 20
Fizzles 17
______________
Total cycles 37

Session Leader Comments
May 3 2007 09:43:30:127AMYijun LinWork done yesterday on FFT preparation:
1. Adjusted l_stub1_init, and l_stub2_init. (to get better match)
2. Raised PID feedback gain. (to get faster feedback)
3. Adjusted the current overload threshold and tested. (not to be overloaded in normal operation)
4. Adjusted the scale factor of the current measurement.(so the feedback loop is consistent).
5. Included a dc offset in the digitizer on the current measurement.


May 3 2007 09:08:29:237AM1070503001Yijun Linfizzle
May 3 2007 09:36:39:903AM1070503003Yijun LinPlasma. Full length. Wow!
All transmitters ran on. 9:26 AM.
We will be ready 9:56 AM.

When the transmitters are ready,
E: 0.7-1.0 sec. 200 kW.
D: 0.8-1.5 sec, .8 MW
J: 0.8-1.5 sec, 1.6 MW

May 3 2007 09:44:18:597AM1070503004Yijun LinPlasma. Full length.

ICRF not ready.
Will be ready for next shot.

E: 0.7-1.0 sec. 200 kW.
D: 0.8-1.5 sec, .8 MW
J: 0.8-1.5 sec, 1.6 MW
May 3 2007 09:58:22:787AM1070503005Yijun Linfizzle
May 3 2007 10:10:18:870AM1070503006Yijun Linfizzle
May 3 2007 10:22:51:563AM1070503007Yijun Linfizzle
May 3 2007 10:35:28:370AM1070503008Yijun Linfizzle
May 3 2007 10:47:51:773AM1070503009Yijun Linfizzle
May 3 2007 11:00:50:780AM1070503010Yijun LinFizzle
May 3 2007 11:20:54:850AM1070503011Yijun Linfizzle
May 3 2007 11:46:30:063AM1070503012Yijun LinFizzle
May 3 2007 11:46:24:940AM1070503013Yijun LinFizzle
May 3 2007 11:59:07:367AM1070503014Yijun LinFizzle
May 3 2007 12:17:29:997PM1070503015Yijun LinFizzle
May 3 2007 12:24:53:360PM1070503016Yijun LinFizzle
May 3 2007 12:59:21:110PM1070503018Yijun LinFizzle
May 3 2007 01:17:04:817PM1070503019Yijun LinFFT successfully matched through L-H transition. Power reflection was kept below 10% at the transition, and below 1% other times

There was an arc detected by FFT2 at 0.85 sec.
This arc shut off the transmitters. Note: circulated power went up significantly in H-mode.

FMIT #4 got xbar fired after the pulse.

Next: Add 0.005 m fudge on L_DC1_STUB1 and L_STUB2_DC2 length, and see whether this can move the matched point closer to zero reflection.

May 3 2007 01:28:13:637PM1070503020Yijun LinFFT got zero reflection before L-mode.
However, it oscillating in H-mode.

(The oscillation may be caused by interference from D port. We need
a notch filter on the FFT directional couplers to avoid it. )

There was an arc detected by FFT2 at 0.92 sec.
This arc shut off the transmitters. It seems that the N2 cannot sustain this much power. (We will have to fill SF6 in the future)

Next:
1. Reduce the feedback gain back to previous level. gain_st to -0.1, gain_cur to -0.25.
2. Also loose the threshold of good match (from 0.25% to 1%)
repeat.
3. No D port for a shot.
May 3 2007 01:38:01:187PM1070503021Yijun LinFFT worked very well.
No arc this time (circulating power is lower).
Plasma in and out of H-mode, but the power reflection stayed within 5%.

Next: raise power to 400 kW.
(Raise the feedback gains to gain_st to -0.2 and gain_cur -0.5. We don't run
D together with E. There should not be oscillation).
May 3 2007 01:53:32:380PM1070503022Yijun LinArc on FFT #2 at 1.08 sec.
Power reflection was mostly kept below 5%.

Raising the feedback gain did not do much. The speed of the control
is mostly determined by the power supply capability (rate of current change).

Next: Ramping E power from .2 to .6 MW.

Making notch filters to filter out D port 80.5 MHz power, so that we
can run together with D port.
May 3 2007 02:08:22:447PM1070503023Yijun LinRequest
E port ramping up from .2 to .6 MW, 0.95 to 1.2 sec.
J port starts from 1.0 sec at 2.3 MW demand.

result:
Arc detected on FFT2 at 1.12 sec at 500 kW Pforw.
[Circulation power sqrt(dc2forw^2 + dc2refl^2) ~ 1.7 MW]
Power reflection was mostly kept below 5%.

(a false start cause from J port noise at 1.4 sec)

The power handling is getting better shot by shot.
Next: Raise power and see if it is getting better.


May 3 2007 02:10:54:527PM1070503024Yijun LinFizzle
May 3 2007 02:27:56:267PM1070503025Yijun LinRequest
E port ramping up from .4 to .8 MW, 0.95 to 1.2 sec.
J port starts from 1.0 sec at 2.3 MW demand.

result:
Arc detected on FFT2 at 1.03 sec at 500 kW Pforw.
[Circulation power sqrt(dc2forw^2 + dc2refl^2) ~ 1.6 MW]
Power reflection was mostly kept below 5%.

The power handling is the slightly worse than shot 23.

I think we cannot go higher power with N2 in. Hopefully, SF6 will help in the future.

next: Just run it at lower power and see how it performs at different plasma parameters.


May 3 2007 02:45:12:790PM1070503026Yijun LinRequest
E port ramping up from .4 to .8 MW, 1.3 to 1.5 sec.
J from 1 sec, D from 1.4 sec.

result:

E ran. (D and J max faults because density changed from nl 04 from .8 to 1.0).
Both FFT power currents to max. The load is outside the design region, but the match is mostly below 10%.

The FFT was all right dealing with dc1 arcs (rf retry, not matching to arcs, etc)

Next: repeat.
May 3 2007 03:06:47:720PM1070503027Yijun LinRequest: nl 0.75
E port ramping up from .4 to .8 MW, 1.3 to 1.5 sec.
J port starts from 1.0 sec at 2.3 MW demand.

result:
E ran. arc detected on FFT2 at 1.36 sec (500 kW in H-mode).

Got a mismatch in the start.
The power threshold (50 kW) to start FFT is too high. I would try 10 kW for next shot. (The FFTs would run with noises from D/J, but this seems to not a concern).


Next: repeat.
May 3 2007 03:05:16:047PM1070503028Yijun LinRequest: nl 0.65
E port ramping up from .4 to .8 MW, 1.3 to 1.5 sec.

result:
E ran. arc detected on FFT2 at 1.36 sec (500 kW in H-mode).
(same as last shot).

Start-up all-right after lowering the power threshold to 10 kW.

Next: Lower E port demand to 0.3 MW flat. There is no point to run it with arc all the time.

May 3 2007 03:35:11:433PM1070503030Yijun LinRequest: nl 0.6, 0.8 MA
E port 0.3 MW, 1.3 to 1.5 sec
D and J run at 3 MW total.

result:
E ran. Noise from D port made the feedback crazy.
Next: no D port until the notch filters are installed.


May 3 2007 03:46:46:470PM1070503031Yijun LinRequest: nl 0.45, 0.8 MA
E port 0.3 MW, 1.3 to 1.5 sec
J run at 2.2 MW total.

result:
E ran. nice.


May 3 2007 04:01:34:727PM1070503032Yijun LinRequest: nl 0.5, 0.5 MA
E port 0.3 MW, 1.3 to 1.5 sec
J run at 2.2 MW total.

result:
E ran. Multiple L-H-L transitions. But it kept the power reflection below 5%.
J: 4 faults.

May 3 2007 04:18:43:513PM1070503033Yijun LinRequest: nl 0.5, 0.5 MA
E port 0.3 MW, 1.3 to 1.5 sec
J run at 2.2 MW total.

result:
E ran. Multiple L-H-L transitions. But it kept the power reflection below 5%.
(Note: these H-modes are out of the design parameters).
Same as last shot

May 3 2007 04:28:32:750PM1070503034Yijun LinRequest: nl 0.6, 0.8 MA
E port 0.3 MW, 1.3 to 1.5 sec
J run at 2.2 MW total.

result:
E ran. good match.
May 4 2007 09:52:30:433AM1070503037Yijun LinRequest: nl 0.6, 0.8 MA
E port 0.3 MW, 1.3 to 1.5 sec
J run at 2.2 MW total.

result:
E got better match during pellet injection.

Physics Operator Comments
May 2 2007 06:44:58:410PMSteve Wolfe
The following measures have been taken to deal with the loss of
flux loop F10 and the continuing loss of flux loop F11 in preparation 
for operation on Thursday, 1070503:

1) The F10 input has been turned off in the \hybrid::top.config.inputs and
\hybrid::top.dpcs_config.inputs branches, and the \hybrid::top.config:config_id
has been updated to warn Physics Operators to recalculate all magnetics 
predictors. 

2) The fluxihh predictors have been modified to ignore the F10 and F11 loops.
Changes were made to the routines fluxihh.pro and ianup.pro, and a new
ian tree pulse file (ian_005.*) was created; the tree was generated using
/home/wolfe/idl/ian/filaments/wtdfil_new.pro

3) The coefficients in the \analysis::top:fluxihh branch have been updated to
match the behavior of the fluxihh predictors, using
 /usr/local/cmod/codes/mhd/fluxihh/load_predictors_procedure.sh

4) The vacuum predictors (Br_0) was updated by creating a new mhd_static_2012
pulse file and changing \analysis::top:recon_vac:static_shot to point to 2012.
The static tree was populated using /home/wolfe/idl/RECON_VAC/fix_recon_vac.pro
with a tolerance =0.01 and specifying F10,F11,F17,F18A as bad. This change
also updates the RECON_VAC signals. 

5) The filament predictors (ZCUR) are updated automatically by calling them 
with the hybrid f10 input turned off. No additional action was required.

6) The weights on Flux_09 (F10) in \analysis::efit_efitin:fwtsi and
\efit::efit_efitin:fwtsi model files were modified to return 0. on shots
after 1070501010.

7) An expression synthesizing a bogus signal based on full flux
loops f09, f19 and f18a, under the assumption of up-down symmetry, was 
substituted into \mag_fluxes:flux_09 in the magnetics model tree. This 
will be picked up by MFLUX and the VacBrBz nodes. 

8) Ian has imported the new versions of ianup.pro and the ian_005 pulse
files into his directory, which will probably cause MFIL to use these 
values for future shots. 

May 3 2007 09:09:45:067AM1070503001Earl Marmarbring up PCS
This has all the changes that Steve Wolfe put in to account for the F10 flux loop problem.
Load; no obvious problems.

fizzle
fields don't look terrible; BR might be a bit high
breakdown at about the right time; current rise looks slow

when in doubt, change the prefill puff
May 3 2007 09:21:16:100AM1070503002Earl Marmarprefill to 21 msec (from 27 msec)

fizzle
similar to shot 1
high and inside, ball 2
May 3 2007 09:44:20:627AM1070503003Earl MarmarRCUR offset to 1300 (from 1800)
BR0 offset to -.0015 (from -.001)

plasma; doesn't look horrible; some early runaways
ohmic H-mode late in the flattop
May 3 2007 10:08:28:010AM1070503004Earl Marmarno pcs changes

LH should inject on this one (starting at .7 seconds)
plasma
modulated LH
another late flattop ohmic H-mode
May 3 2007 10:02:51:680AM1070503005Earl Marmarno pcs changes

fizzle
Ip might be rising slightly too quickly
May 3 2007 10:10:12:967AM1070503006Earl Marmaradd 1 msec to prefill puff (now 22 msec)
enable DNB gatevalve
enable Argon puff, 50 msec starting at 0.3

fizzle
May 3 2007 10:30:51:817AM1070503007Earl Marmaradd 2 msec to prefill puff (now 24 msec)
BR_0 offset to -.0018 (from -.0015)

fizzle
May 3 2007 10:58:46:640AM1070503008Earl Marmarsubtract 1 msec from prefill puff (now 23 msec)
RCUR offset to 900 (from 1300)

fizzle
May 3 2007 10:57:21:860AM1070503009Earl Marmarsubtract 2 msec from prefill puff (now 21 msec)
BR_0 offset to -.0015
RCUR offset to 1300

fizzle

May 3 2007 11:12:34:973AM1070503010Earl Marmaradd 3 msec to prefill puff (now 24 msec)

fizzle


May 3 2007 11:27:26:713AM1070503011Earl Marmarno pcs changes
disable DNB gatevalve (should give higher fill pressure)

fizzle
second lump on H-alpha looks smaller

May 3 2007 11:38:36:717AM1070503012Earl Marmaradd 2msec to prefill puff, now 26 msec
if this doesn't go, we'll go the other way

fizzle


May 3 2007 11:53:40:770AM1070503013Earl Marmarreduce prefill puff to 19 msec

fizzle


May 3 2007 12:06:05:167PM1070503014Earl Marmarreduce prefill puff to 17 msec

fizzle


May 3 2007 12:15:22:327PM1070503015Earl MarmarEF4 current 15 amp more negative before t=0 (now -1350A)

fizzle
looks like almost no plasma current at all
May 3 2007 12:34:05:363PM1070503016Earl Marmarprefill puff to 20 msec

fizzle

May 3 2007 12:47:33:823PM1070503017Earl Marmarreload segment 1 from shot 3 today (1070503003)

fizzle


May 3 2007 12:55:18:153PM1070503018Earl MarmarBR_0 offset to -.001 from -.0015

fizzle


May 3 2007 01:15:26:940PM1070503019Earl MarmarBR_0 offset to -.002 from -.001

plasma

got ICRF H-modes on this one.


May 3 2007 01:24:34:570PM1070503020Earl MarmarBR_0 offset to -.0025 from -.002


plasma


May 3 2007 01:37:22:123PM1070503021Earl Marmarincrease argon puff to 100 msec, starting at 0.3 seconds

plasma


May 3 2007 02:02:37:087PM1070503022Earl Marmarenable DNB gate valve

plasma


May 3 2007 02:02:53:553PM1070503023Earl Marmarno pcs changes

plasma


May 3 2007 02:13:18:370PM1070503024Earl Marmarargon puff to 125 msec (from 100 msec)

fizzle

May 3 2007 02:30:22:270PM1070503025Earl MarmarBR0 offset to -.003 from -.0025

plasma


May 3 2007 02:42:56:820PM1070503026Earl MarmarSwitching to MP 468, fast electron diffusion with LHCD

nl_04 target to 1e20

plasma


May 3 2007 02:53:10:200PM1070503027Earl Marmarnl_04 target to 7.5e19

plasma

desity was a bit higher than the target


May 3 2007 03:09:22:860PM1070503028Earl Marmarnl_04 target to 6.5e19

plasma
May 3 2007 03:09:12:313PM1070503029Earl MarmarIp to 500kA


May 3 2007 03:39:20:030PM1070503030Earl MarmarIp to 800kA
nl_04 target to 5e19
Reduce outer gap 4 mm (increase RCUR 2 mm)

plasma


May 3 2007 03:51:28:160PM1070503031Earl Marmarnl_04 target to 4.5e19

plasma
May 3 2007 04:03:20:587PM1070503032Earl Marmartweak the early PG3 gas pre-programming (segments 1 and 2)
Ip to 500 kA
increase outer gap 2 mm (reduce RCUR 1 mm)

plasma
May 3 2007 04:24:57:703PM1070503033Earl Marmarnl_04 target to 5e19

plasma
May 3 2007 04:33:18:893PM1070503034Earl Marmarincrease RCUR 1mm
Ip to 800 kA
enable LPI gate valve

plasma
May 3 2007 05:02:53:937PM1070503035Earl Marmarno pcs changes

plasma
May 3 2007 05:02:37:280PM1070503036Earl Marmarno pcs changes

plasma
May 3 2007 05:23:42:990PM1070503037Earl Marmarno pcs changes

plasma
disrupts shortly after Li pellet injection at 1.51 s

Engineering Operator Comments
ShotTimeTypeStatusComment
108:59:13:920AMPlasmaOk
209:11:50:160AMPlasmaOk
309:24:08:823AMPlasmaOk
409:39:24:170AMPlasmaOk
509:55:56:943AMPlasmaOk
610:08:27:747AMPlasmaOk
710:20:57:063AMPlasmaOk
810:33:36:693AMPlasmaOk
910:46:00:847AMPlasmaOk
1010:58:51:343AMPlasmaOk
1111:19:05:397AMPlasmaOk
1211:32:01:543AMPlasmaOk
1311:44:38:190AMPlasmaOk
1411:57:26:803AMPlasmaOk
1512:10:25:683PMPlasmaOk
1612:23:12:360PMPlasmaOk
1712:35:46:100PMPlasmaOk
1812:48:21:963PMPlasmaOk
1901:01:04:110PMPlasmaOk
2001:15:32:740PMPlasmaOk
2101:28:35:730PMPlasmaOk
2201:41:11:327PMPlasmaOk
2301:55:02:223PMPlasmaOk
2402:09:01:900PMPlasmaOk
2502:21:42:263PMPlasmaOk
2602:34:10:427PMPlasmaOk
2702:46:44:493PMPlasmaOk
2802:59:38:623PMPlasmaOk
2903:14:32:990PMPlasmaOk
3003:28:19:730PMPlasmaOk
3103:42:44:200PMPlasmaOk
3203:56:33:113PMPlasmaOk
3304:11:48:697PMPlasmaOk
3404:25:34:563PMPlasmaOk
3504:39:41:990PMPlasmaOk
3604:55:36:310PMPlasmaOk
3705:09:20:313PMPlasmaOk

System Availability
May 3 2007 08:58:48:030AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready.Apr 26 2007 10:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesDewar recooled 5/2. Expect Chs 1-8 operational.May 02 2007 09:03AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesTested 1.8MW to IDC, 5/1/07. Problems with 8B and 23.May 01 2007 10:59AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, but analyzed data not ready. 2D arrays being debugged.Apr 26 2007 10:28AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe swept frequency channel is connected, bypassing the 110GHz board. The waveform generator voltage is 6.57V (129GHz). All other channels are disconnected.May 01 2007 10:02AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks.May 01 2007 08:27AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - EdgeyesTemperature calibration is complete. Density is uncalibrated.Apr 24 2007 08:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecnovisible spectrometer between 350 and 670 nm, 4 spatial channelsMay 01 2007 08:58AM (agraf)Alex GrafVisible Spectrometeragraf


May 3 2007 10:33:17:037AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready.Apr 26 2007 10:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational.May 03 2007 10:22AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesTested 1.8MW to IDC, 5/1/07. Problems with 8B and 23.May 01 2007 10:59AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, but analyzed data not ready. 2D arrays being debugged.Apr 26 2007 10:28AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe swept frequency channel is connected, bypassing the 110GHz board. The waveform generator voltage is 6.57V (129GHz). All other channels are disconnected.May 01 2007 10:02AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks.May 01 2007 08:27AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - EdgeyesTemperature calibration is complete. Density is uncalibrated.Apr 24 2007 08:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecnovisible spectrometer between 350 and 670 nm, 4 spatial channelsMay 01 2007 08:58AM (agraf)Alex GrafVisible Spectrometeragraf