Alcator C-Mod Run 1070504 Information

Back to runs

Miniproposals
Miniproposal:296
Date Filed: 5/14/2001
Title:Confirmation of Thomson scattering density calibration using electron cyclotron emission cutoffs
First Author:Jerry Hughes
Session Leader:Jerry Hughes (shots 13-19)
Miniproposal:429
Date Filed: 7/25/2005
Title:SOL turbulence in limited plasmas
First Author:Stewart Zweben
Session Leader:Stewart Zweben (shots 1-1)

Operators
Session leader(s):Stewart Zweben,Jerry Hughes
Physics operator(s):Jim Irby
Engineering operator(s):Andy Pfeiffer,Bill Parkin,Gary Dekow

Engineering Operator Run Comment
MP#429 Limiter Ohmic Turbulence (1/2 d) Zweben Irby And MP#296 Thomson/

Session Leader Plans
Entered: May 3 2007 03:31:45:137PM
Author: Jerry Hughes
Session Leader run plan for 1070504 (second half):
MP 296: "Confirmation of Thomson scattering density calibration using
electron cyclotron emission cutoffs" (a.k.a. "TS/ECE
cross-calibration")

PURPOSE:
These shots will operate at low(ish) field and high densities in order
to generate ECE cutoffs throughout the plasma. These give a fairly
unambiguous density measurment, allowing the calibration of
simultaneously measured Thomson scattering densities.

PREPARATION:

No special machine conditioning required.

No RF required.

Setup GPC grating for 4T. Adjust angle on GPC2 for low-field as well.

RUN PLAN:

-Begin with shot 1070503028. Keep Ip=800kA. Lower Bt to 4.0T.

-Target nl04 be 1.2x10^20m^-2 at 0.6s, then stepped to
2.0x10^20m^-2. This should get central n_e sufficiently high to
promote ECE cutoffs, but still allow operation below n_G.

-Repeat shot, incrementing and decrementing Bt in steps of 0.1T as
desired, in order to vary the radii of the measured cutoffs.

-If we get a discharge that is steady and fully cut off on the
LFS before the end of flattop, we might insert a Bt waggle up to 4.5
or 5.0T and back down, to obtain additional data points.

-If Ohmic H-modes are prevalent, switch to inner wall limited or USN
to raise the L-H power threshold.


Entered: May 4 2007 08:55:11:723AM
Author: Stewart Zweben
Continuation of MP#429: inner-wall limited shots for
turbulence study, all with large outer gap of ~ 3.5 cm,
all shots with probe scans and GPI puff at the A-B limiter and possibly
at the innerwall capillary B16-001

Load shot 1060412026

1) 5.4 T, 0.8 MA (repeat of 1060412026), but with lowest possible
density (nl04=4e19 similar to 1030702022)
2) 5.4 T, 0.8 MA (repeat of 1060412026), medium density (nl04=8e19)
3) 5.4 T, 0.8 MA (repeat of 1060412026), highest possible density
(nl04=1.1e20 similar to
950609002- may need NINJA assist at innerwall)

4) 2.7 T, 0.4 MA , lowest possible density (nl04=3e19 similar to 990520012)
5) 2.7 T, 0.4 MA , medium density
6) 2.7 T, 0.4 MA , highest possible density

7) 4.05 T, 0.6 MA , lowest possible density
8) 4.05 T, 0.6 MA , medium density
9) 4.05 T, 0.6 MA , highest possible density

and if possible:

10) 6.75 T, 1.0 MA , lowest possible density
11) 6.75 T, 1.0 MA , medium density
12) 6.75 T, 1.0 MA , highest possible density

Physics Operators Plans

Session Leader Summaries
Entered: May 4 2007 05:10:53:047PM
Author: Stewart Zweben
The first half of this day was MP#429, SOL
Turbulence Experiment, but with a B field
scan at constant q(a). We started by repeating
the inner-wall limited, near-circular plasma
of 1060412026, which was optimized for a
comparison with Bruce Scott's GEMR code.
This was at B=5.4 T, I=0.8 MA, with a large
outer gap to see the SOL turbulence better,
and a relatively low density. All shots had
midplane GPI puff and fast diode data.

Shots 1-2 of today were to re-establish the
condition of 1060412026 and get probe data
and GPI data. These were successful. Shot
1 had X-point GPI puff but no probes. Shot
2 had X-point GPI puff and probes.

Shots 3-4 of today were to repeat this shot
but at a higher density, to do a collisionality
scan. These were successful. Shot 3 and 4
both had X-point GPI and probes.

Shots 5-6 were at a higher field of B=6.75 T
with I=1.0 MA and a relatively low density.
These were successful. Shot 5 had X-point
GPI puff and no probes. Shot 6 had X-point
GPI puff and probes.

Shot 7 disrupted early.

Shot 8 was a 6.75 T shot like 5-6 but with
a smaller Ninja puff to make a smaller
change of density during this puff. This
was successful. Shot 8 had probes and no
X-point GPI puff.

Shot 9 was an attempt to do B=2.75 T, I=0.4 MA,
but had an early disruption.

Shot 10 was at 2.75 T, 0.4 MA and relatively
low density. This was successful, although
there was an unexplained event at 1.4 sec
which took a notch out of the current (most
likely a ufo). Shot 10 had no probes and
no X-point GPI puff.

Shot 11 was like shot 10at 2.75 T, successful except
for a ufo at 0.9 sec, just after a probe
plunge. Shot 11 had probes but no X-point
GPI puff.

Shot 12 was an attempt to do 2.75 T again
but had an early disruption.


Entered: May 4 2007 08:22:16:730PM
Author: Jerry Hughes
We got three shots with density ramps at 4.1, 4.0, and 3.9T. We obtained suitable
ECE cutoff data in both GPC and GPC2, and were able to calculate updated
calibration coefficients for the core Thomson scattering. They look fairly
reasonable for the core polychromators, and less so for the older spectrometers.

These core TS calibrations will be in the model tree as of tonight.

Physics Operator Summaries
Entered: May 4 2007 05:27:15:507PM
Author: Jim Irby
We had trouble today with blown fuses in the OH1 supply that cost a couple of hours of run time, followed by broken limit switch on a Ross relay that is part of the OH1 resistance measurement that cost another 90 minutes or so. Since we could not tell if the relay was open or closed to the OH bus, we had to fix it before we could operate the machine.

The machine startup was robust when we had all the hardware functioning. We had only one fizzle following a disruption on shot 14. We had another distruption on shot 16, but there was a long delay following this discharge to fix the Ross relay problem.

Note that there is a 3 kA offset in the DPCS setting for the TF: If you want 111 kA you need to program 108 kA. So on shot 14 I got 4.1 instead of 4.0 T.

Score
-----

plasmas 1,2,3,4,5,6,7,8,9,10
11,12,14,16,19

fizzle 15,18

test 13,17


Session Leader Comments
May 4 2007 09:12:09:823AM1070504001Stewart Zwebentry for repeat of 1060412026
looks good, but density a little
higher than desired
May 4 2007 09:39:23:443AM1070504001Stewart Zwebenabout same as shot 1, 5.4T, 0.8 MA
density a little higher than hoped
but OK for low density point in scan
May 4 2007 10:05:59:657AM1070504002Stewart Zwebenabout same as shot 1, 5.4T, 0.8 MA
density a little higher than hoped
but OK for low density point in scan
May 4 2007 10:21:06:867AM1070504003Stewart Zwebentry for higher density point at 5.4T, 0.8 MA
density perhaps a bit higher than desirable
OK for high density point in scan
but only one scan of probe
May 4 2007 10:20:31:350AM1070504004Stewart Zwebentry for higher density point at 5.4T, 0.8 MA
a little lower density than shot 3 but OK
two scans of probe OK
May 4 2007 10:37:18:983AM1070504004Stewart Zwebentry for higher density point at 5.4T, 0.8MA
good high density point for this B
two scans of probe for this shot
May 4 2007 10:36:06:170AM1070504005Stewart Zwebentry for higher field point at 6.75T, 1.0 MA
low density point, but a little higher than expected
no scans of probe for this shot
May 4 2007 11:14:52:323AM1070504006Stewart Zwebenrepeat of higher field point at 6.75T, 1.0 MA
low density point, but a little higher than expected
two scans of probe for this shot
May 4 2007 11:26:06:690AM1070504007Stewart Zwebendisrupted early
no fluctuation data
May 4 2007 11:40:30:867AM1070504008Stewart Zwebengood shot at 6.75 T, 1 MA
two probe scans
no puff at Bay K to get lower density after 0.8 sec
May 4 2007 12:06:48:533PM1070504009Stewart Zwebentry at 2.7 T, 0.4 MA point with low density
disrupted early
May 4 2007 12:17:07:973PM1070504010Stewart Zwebengood shot at 2.7 T, 0.4 MA late in shot
no probe scans, no bay k puff
May 4 2007 12:27:13:540PM1070504011Stewart Zwebengood shot at 2.7 T, 0.4 MA late in shot
two probe scans, no bay k puff
May 4 2007 12:40:24:513PM1070504012Stewart Zwebentry at at 2.7 T, 0.4 MA
disrupts early

May 4 2007 03:06:09:890PM1070504013Jerry HughesTest
May 4 2007 03:29:37:680PM1070504014Jerry HughesPlasma attempt.
Bt=4.1T
Ip=0.8MA
Gas feedback looks about right, but NINJA puff at 0.8s was too much, too fast.
Got several cutoffs.
Repeat with Bt=4.0T, no NINJA.
May 4 2007 03:30:11:413PM1070504015Jerry HughesFizzle
May 4 2007 03:52:55:610PM1070504016Jerry HughesGood cutoffs available.
Too much puffing from main gas valve. Density program will be changed for next
shot to insure a more gradual increase; programmed nl04 to 2.0x10^20, then back down at 1.1s.

May 4 2007 04:35:25:050PM1070504017Jerry HughesNo power shot.
Made a slight lateral adjustment to laser 2 for next shot . . . if we get one!
May 4 2007 05:11:29:890PM1070504018Jerry HughesFizzle. Good things come to those who wait.
May 4 2007 06:55:04:680PM1070504019Jerry HughesBonus shot. Good cutoffs, once again. Density still overshoots.

Physics Operator Comments
May 3 2007 03:37:32:137PMJim Irby SL PO

MP#429 Limiter Ohmic Turbulence (1/2 d) Zweben Irby
And
MP#296 Thomson/ECE density calibration (1/2d) Hughes,Hubbard Irby

ECDC overnight in D2, pressure=2e-4 Torr. Rmin/Rdwell/Rmax = 44/45/103 cm.
Bake at 60 C.

Power systems as on 1070503025.

A-coil configuration: normal [Dtop -Dbot -Jtop +Jbot] and enabled.

Gas Setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
leave NINJA as is DISABLED

Enable the following gate valves and shutters: ECE, VUV, Z-bolo shutters

Torvac setup: Gate valves open during pulse.
May 4 2007 08:56:22:333AMJim IrbyECDC ran until 6:20 this morning

Loaded seg 2 of 1070503028 into seg 3 for mp 296

Loaded seg 4 of 1060412026 into seg 2 round inner wall limited plasma for mp 429

recalulated magnetics predictors to account for loss of flux loop in seg 2

loaded wire 14 from seg 2 of 1070503028 into wire 14 of seg 2 --- replaced z-meter density control with nl_04 control

nl_04 density request to 4e19/m^2 at 0.5 s in seg 2

May 4 2007 09:22:51:093AM1070504001Jim Irbyturned on seg 2 for first shot --- circular inner wall limited

plasma into rampdown

plasma shape looks good


May 4 2007 09:40:06:710AM1070504002Jim Irbyargon (pg1) from 0.3 to 0.4 s

dropped early nl_04 density request a little

density into rampdown

density a little lower

enabled pg1 (argon) for next shot




May 4 2007 10:06:18:250AM1070504003Jim Irbynl_04 request to 1e20/m^2

TF invert to 1.6 s and fizzle gate to 1.8 s --- get rid of TF coax protection waggle

plasma for 1.6 s --- 500 kA disruption

density rise too high --- overshot to 1.2e20/m2

OH2s reached PLC current limits (26 kA)
May 4 2007 10:15:36:207AM1070504004Jim Irbyslowed down density rise and dropped peak nl_04 request to 0.9e20/m2

plasma for 1.63 s

still reached oh2 PLC limits (-26 kA)


May 4 2007 10:54:42:600AM1070504005Jim IrbyBt to 6.75 T --- 188.8 kA --- PLC limits to 192 kA

Ip request to 1 MA

nl_04 density request to 4e19/m^2

enabled DNB for this shot

plasma into rampdown --- got field and current


May 4 2007 11:22:38:140AM1070504006Jim Irbypower room access before this shot to check fuses --- no problems found
Amanda puts amps back in ECE lab

OH2 current limits from -26 to -27 kA

plasma into rampdown

ECE seems to be okay

seems that fsp is injecting some dust

May 4 2007 11:37:48:693AM1070504007Jim Irbyno DPCS changes, but JT is reducing NINJA puff

injection beginning by 220 ms resulted in disruption at 259 ms

something came in or heated up --- neuts/hards rising early



May 4 2007 11:45:12:290AM1070504008Jim Irbyno changes --- try again

plasma into rampdown

probe throws up dust again -- probe scans seen on neuts/hards


May 4 2007 12:05:33:720PM1070504009Jim IrbyTF request in seg 2 to -75 kA --- PLC current limit back to -165 kA
Ip request in seg 2 to -400 kA

density request remains at 4e19/m^2


disruption at 0.35 s --- not clear why


May 4 2007 12:22:07:070PM1070504010Jim Irbyraised density request a little before 300 ms, repeat otherwise

plasma into rampdown -- got field and current

large injection at 1.4 s notched out current and density


May 4 2007 12:34:50:277PM1070504011Jim Irbyrepeat

plasma into rampdown; still had a density/current drop but earlier


May 4 2007 01:15:07:370PM1070504012Jim Irbyrepeat

lost plasma by 0.45 s; disruptive by 0.3 s

going into power room:
self power 0h1
com failure oh2 u and l
check fuses

6 fuses lost on oh1
will need to hi-pot



May 4 2007 03:14:13:533PM1070504013Jim IrbyOH1 test --- 2 kA PLC

looks good
May 4 2007 03:21:05:833PM1070504014Jim Irbytry for plasma

disruption at 1.34 s --- density about 2.2e20/m^2 with help from NINJA

a couple of large objects fall in an bounce --- wide 2


May 4 2007 03:34:24:883PM1070504015Jim IrbyNINJA off for this shot

TF current request for last shot was 111 kA, but I got 114 kA and 4.1 T instead of 4.0 T ---- dropped request to 111*4.0/4.1 or 108.1 kA

fizzle --- didn't drop fill following the disruption
May 4 2007 03:50:22:937PM1070504016Jim Irbyprepuff from 21 to 20 ms --- just to have done something

plasma for 1.33 s --- 4.01 T
May 4 2007 03:59:04:457PM1070504017Jim Irbychanged density programming to bring up density more slowly and also to strart back down at 1.1 s.

reduced prepuff to 19 ms

**** no power shot *****
**** Ross relay status readback indeterminant ****
**** Will require power room access ****
May 4 2007 05:15:10:313PM1070504018Jim Irbydropped TF to 3.9T (105.7kA in DPCS)

fizzle
May 4 2007 05:44:56:780PM1070504019Jim Irbyone last try --- no DPCS changes

plasma for 1.36 s

density did rise more slowly but still overshot to 2.2e20/m^2. Density somewhat lower following 1.1 s as programmed, but still remained too high.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:04:06:667AMPlasmaOk
209:32:30:957AMPlasmaOk
309:47:36:323AMPlasmaOk
410:06:16:673AMPlasmaOk
510:32:29:963AMPlasmaOk
611:06:32:760AMPlasmaOk
711:23:17:813AMPlasmaOk
811:36:38:113AMPlasmaOk
911:53:45:043AMPlasmaOk
1012:07:55:860PMPlasmaOk
1112:22:46:710PMPlasmaOk
1212:36:53:120PMPlasmaBadPF breaker opened at end of plasma
1303:01:19:357PMTestOkOH1 PLC Test
1403:12:04:970PMPlasmaOk
1503:27:32:943PMPlasmaOk
1603:40:56:357PMPlasmaOk
1703:55:17:707PMPlasmaBadBad Ross Relay Status on OH1
1805:07:53:483PMPlasmaOk
1905:20:02:143PMPlasmaOk

System Availability
May 4 2007 09:03:43:790AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready.Apr 26 2007 10:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational.May 03 2007 10:22AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesTested 1.8MW to IDC, 5/1/07. Problems with 8B and 23.May 01 2007 10:59AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, but analyzed data not ready. 2D arrays being debugged.Apr 26 2007 10:28AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe swept frequency channel is connected, bypassing the 110GHz board. The waveform generator voltage is 6.57V (129GHz). 60, 88, 88L and 88U GHz channels are connected and being tested. Others are disconnected.May 04 2007 12:22AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks.May 01 2007 08:27AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - EdgeyesTemperature calibration is complete. Density is uncalibrated.Apr 24 2007 08:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecnovisible spectrometer between 350 and 670 nm, 4 spatial channelsMay 01 2007 08:58AM (agraf)Alex GrafVisible Spectrometeragraf


May 4 2007 03:00:59:467PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready.Apr 26 2007 10:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational.May 03 2007 10:22AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower HybridyesTested 1.8MW to IDC, 5/1/07. Problems with 8B and 23.May 01 2007 10:59AM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, but analyzed data not ready. 2D arrays being debugged.Apr 26 2007 10:28AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe swept frequency channel is connected, bypassing the 110GHz board. The waveform generator voltage is 6.57V (129GHz). 60, 88, 88L and 88U GHz channels are connected and being tested. Others are disconnected.May 04 2007 12:22AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks.May 01 2007 08:27AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - EdgeyesTemperature calibration is complete. Density is uncalibrated.Apr 24 2007 08:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


May 4 2007 03:54:56:220PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready.Apr 26 2007 10:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationno Jan 14 2007 01:47PM Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational.May 03 2007 10:22AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, but analyzed data not ready. 2D arrays being debugged.Apr 26 2007 10:28AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe swept frequency channel is connected, bypassing the 110GHz board. The waveform generator voltage is 6.57V (129GHz). 60, 88, 88L and 88U GHz channels are connected and being tested. Others are disconnected.May 04 2007 12:22AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks.May 01 2007 08:27AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - EdgeyesTemperature calibration is complete. Density is uncalibrated.Apr 24 2007 08:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf