Setting up PCS for 1070510 (post-boron evaluation)
Import seg2 from 1050426022
Call alg on RCUR,ZCUR2,ZCUR3,CLEARIN,RXL,ZXL,RXU,ZXU
Do a call alg on Ip just for fun, it was already using rog_fg
Load wire 9 (bolofeed) from B21_PROJ in seg3; move integrator C gate to 0.2;
Zero feedforward on ACOIL_CUR
Bring up the V17-32 screen just to get it updated.
Note that seg3 is on and seg2 off!
Turn on Seg2 and Turn off seg3
Build All
Check dpcs_fizzle settings, verify source_shot=1060308026 (normal field)
save as 1070510999 in /home/wolfe/pcs_scratch
Not done yet. I should have re-called the SSEP wire 11, even though it's off.
Call ssep (wire 11) and reset the offset to -2500.
Build All (doesn't need it)
Do the save again, to 1070510999 in ~wolfe/pcs_scratch.
Quit PCS /safe
|
| May 10 2007 07:35:26:740AM | | Steve Wolfe |
Recover previously prepared PCS setup from
~/pcs_scratch/*_1070510999
Verify seg2 has magnetics algs have been called.
Notice that nl04 target is set for 1.05e20, which seems a little high,
but this was the fiducial.
Also, note that the current is really set to 1.05MA rather than 1.0.
I should check if this was really the fiducial?
Note seg1 pg4 puff is 19msec, seems like an ok place to start, if
it fizzles probably want to drop it.
Load it
Load at 10-May-2007 07:10:56.00
Open tree /home/wolfe/pcs_scratch -1
Open tree done
|
| May 10 2007 09:30:12:737AM | 1070510001 | Steve Wolfe |
Shot#1: Try for plasma with RF
plasma full length, almost lost the startup
EDA H-mode, 125kJ, 1e13 neut/sec
D&E fired,J-faulted out after 100ms or so.
Total 1.6MW from D&E, max at 2
H89 ~1.3 not so great
Prad looks high 2pi diode jumps to .4-.5MW, 2pi foil to 1.4
around 0.88sec.
|
| May 10 2007 09:29:53:597AM | 1070510002 | Steve Wolfe |
Shot#2: Repeat, with pg4 dropped by 2msec to 17msec
Go to higher RF power. Try to keep J on.
Early marfe, big early density. Two EDA-like H-modes
Wmhd still only ~115kJ, only D stayed on, E tripped out early; where's the FFT?
So we only got like 1MW sustained.
Startup was clean, no turnaround, but the early marfe is unpleasant.
If we weren't trying for "fiducials" I'd drop the early density rise.
PF breaker is popping out at about 3minutes after shot? Happened twice.
|
| May 10 2007 09:58:22:857AM | 1070510003 | Steve Wolfe |
Shot#3: Cell access before this shot to open HIREX gate valve,
JT to do something for GPI, Jinseok to open MSE shutter.
Power room access for Bill C to check on phase loss fault after shots.
RF will drop E-port power a little, tune J?
HIREX gate valve still closed, needs to be pumped out first.
Plasma, H-mode, shorter this time, still under 120kJ.
RF 1.6MW, tripping. All off at 1.15sec. No J-port after early trip.
2pi bolo is high (>500) from the start of the H-mode.
Very quick marfe this time. density rise better.
|
| May 10 2007 10:32:30:010AM | 1070510004 | Steve Wolfe |
Shot#4: repeat, except fix chopper voltage (0V instead of 100V)
still hoping to get J-port. Yijun says the issue is high neutral
pressure.
plasma, h-mode still looked short.
160kJ, neuts/hards to 2e13,
E stays on (1 fault) D & J both tripping, max power=3.3MW
only E up to .7MW after 0.9sec, lose H-mode then.
2pi diode is rising almost linearly, gets to 800 before H->L.
|
| May 10 2007 11:35:20:783AM | 1070510005 | Steve Wolfe |
Shot#5: repeat, still trying to get RF to stay on.
Matt says Mo not too bad on #4.
Bill is still trying to track down the EF1 fault issue.
HIREX gate valve opened after Hovac'ing
plasma, H-mode still short like on 4, but lower Prad (500kW);
actually it goes L-H after 1sec. Only had E, except for a brief
D pulse. J does nothing but faults.
Only 100kJ.
Next: try starting J earlier, relative to D,E
|
| May 10 2007 11:49:55:070AM | 1070510006 | Steve Wolfe |
Shot#6: Lower target density to 0.9 from 1.05(contrary to what I said).
Another late H-mode, 1.2sec this time,
Several small injections in early flattop
Got D and E, J still faulting out. Max RF is around 1.8MW
Density didn't come down much, Gas comes up at 0.7sec; PG3 puff in
seg2 is coming in at the wrong time.
Next: remove seg2 Pg3 puff at 0.7sec.
|
| May 10 2007 12:04:05:717PM | 1070510007 | Steve Wolfe |
Shot#7:remove seg2 Pg3 puff at 0.7sec.
Stays in H-mode longer, Density was higher.
Possible lost fringe on NL04 feedback.
Only getting 1.5MW D+E, J had no chance this time; P0 above 0.9mTorr
Next: try again
|
| May 10 2007 12:12:17:940PM | 1070510008 | Steve Wolfe |
Shot#8: try again
Two hmodes, got the lower density and J at least came on.
~140kJ, neuts/hards to 1.5e13 in first H-mode.
J still struggling, but stays on for awhile. Prf between 2 and 3
Prad high with injections.
Startup has a bounce, and small early runaways.
|
| May 10 2007 12:27:40:930PM | 1070510009 | Steve Wolfe |
Shot#9: PG4 from 17 to 19msec.
Decrease outer gap from 1.5cm; increase RCUR by 2mm,
aiming for ~1.0cm gap
Jport a little better this time, but 3 hmodes, radiating away
neuts/h at 2e13, wmhd to 155kJ.
|
| May 10 2007 12:41:22:530PM | 1070510010 | Steve Wolfe |
Shot#10: repeat
4 hmodes this time, decreasing neuts each time.
165kJ, up to 4e13. Rate of rise of prad increasing,
but maybe just because power is up sooner; got to >3.5MW,
all antennas faulting 4 or 5 times.
Boronization not looking too good after only 10 shots.
|
| May 10 2007 12:54:20:987PM | 1070510011 | Steve Wolfe |
Shot#11: repeat, change rf waveform
2 hmodes, lost a xmttr? D and E both short, J a little better.
130kJ, barely over 1e13
|
| May 10 2007 01:08:07:180PM | 1070510012 | Steve Wolfe |
Shot#12: pg4 from 19 to 18msec (moved in a little on #11)
Three hmodes, none very good.
D stays in, E dies earlier, J struggles; max ~3MW
For 13: Increase Ar puff to 50msec and enable bside lower
|
| May 10 2007 01:43:09:163PM | 1070510013 | Steve Wolfe |
Shot#13:Increase Ar puff to 50msec and enable bside lower
Stagger D+E and J to look for Mo response (probably should have
done it earlier)
One h-mode with D+E, J didn't stay on.
ECE is cutoff? TCI signal goes away.
TS shows normal looking H-mode density, but there's no rf power there?
almost ohmic h-mode
Weird combination of failed signals.
|
| May 10 2007 01:37:28:660PM | 1070510014 | Steve Wolfe |
Shot#14:Swap J and D+E timing
Fizzle. moving in, maybe should have dropped pg4 again.
|
| May 10 2007 01:50:52:320PM | 1070510015 | Steve Wolfe |
Shot#15: pg4 from 18 to 16msec
Swap J and D+E timing (J first)
Plasma two h-modes, similar but J has lower radiation, slightly
higher W, neuts, doesn't end up with as high density. It also faults more
and sooner. D+E actually has more power (1.5MW vs 1.3)
Next: swap the order back
|
| May 10 2007 02:04:44:640PM | 1070510016 | Steve Wolfe |
Shot#16: swap the order back (D+E first)
Lost the event server, but Maria dubbed for Pat.
Two hmodes during D+E, one late but I think it's
'almost ohmic' again; J had trouble getting going.
|
| May 10 2007 02:18:28:910PM | 1070510017 | Steve Wolfe |
Shot#17: raise nl04 back to 1.05e20
fizzle. Need to lower the fill still more?
|
| May 10 2007 02:36:23:480PM | 1070510018 | Steve Wolfe |
Shot#18: pg4 from 16 to 15ms; Br0 from -.003 to -.0035
raise nl04 back to 1.05e20
plasma. 1 Hmode, early. 116kJ. D+E. J faulting continuously
in the late position.
Next: run them together again, at higher target density
|
| May 10 2007 02:46:38:297PM | 1070510019 | Steve Wolfe |
Shot#19: run them together again, at higher target density
plasma - h-mode later, not strong.
J still won't stay on, max faults early
H-mode comes at power step on D+E at 0.9sec
startup looking shaky again; hesitates and moves in
|
| May 10 2007 03:01:54:957PM | 1070510020 | Steve Wolfe |
Shot#20: Drop rcur offset from 1300 to 1000; reduce pg4 from 15 to 14msec
fizzle. Moved in anyway, I think. There is a bounce signature on the light.
|
| May 10 2007 03:13:33:777PM | 1070510021 | Steve Wolfe |
Shot#21: Put rcur offset from 1000 to 1300; Br0 back to -.003
no gas change.
Plasma. No hesitation this time. No H-mode this time.
E-port only. Both D and J take max faults early
|
| May 10 2007 03:27:08:920PM | 1070510022 | Steve Wolfe |
Shot#22: repeat
Another fizzle. Still looks like it moves in.
pressure starts very low, but rises. If this had happened
at the start of the run I'd say it was because we didn't ecdc after boronization
Try raising the puff, since dropping isn't helping.
|
| May 10 2007 03:38:53:347PM | 1070510023 | Steve Wolfe |
Shot#23: raise pg4 to 17msec
plasma again, current rise looks good again. Go figure.
One h-mode more or less. D+E on fairly steady, J has three
short intervals, then gives out.
|
| May 10 2007 03:40:30:140PM | 1070510023 | Steve Wolfe |
Shot#23: raise pg4 to 17msec
plasma again, current rise looks good again. Go figure.
One h-mode more or less. D+E on fairly steady, J has three
short intervals, then gives out. 130kJ, 1.5e13
|
| May 10 2007 03:54:16:560PM | 1070510024 | Steve Wolfe |
Shot#24: Import seg3 from 1060719011 (high triang slot JFT2M shape shape)
Call all the mag predictors and load with seg3 on, seg2 off
This is programmed for almost no density! We'll see what we get.
No TF. Maybe it doesn't want to run this ahot?
Try again anyway
|
| May 10 2007 04:15:59:680PM | 1070510025 | Steve Wolfe |
Shot#25: Try again for 1060719011 clone
Try again anyway
fizzle. It really doesn't want to run this shot!
Pressure seems to have come up some, hardly any current rise.
Br0 looks the same, but oh2 currents look too close together.
No they don't, I was looking at the wrong shot.
|
| May 10 2007 04:22:39:120PM | 1070510026 | Steve Wolfe |
Shot#26: No changes, try again
plasma, finally!
Can you find the h-mode in this shot? Msybe.
E-port ran, otherwise not so much. Let Yijun tune.
Startup looked fine, next one will probably fizz
|
| May 10 2007 04:35:31:403PM | 1070510027 | Steve Wolfe |
Shot#27: repeat, rf tuning up
Disrupted at 1.5 sec, similar stored energy, etc. for a while,
but this time E isn't happy either. J looks like a comb,
D takes a couple tries, then faults out.
This had another slow current rise, almost didn't go.
After that disruption, I expect I need to drop gas.
|
| May 10 2007 04:49:47:583PM | 1070510028 | Steve Wolfe |
Shot#28: Pg4 from 17 to 14msec
Increase argon from 40 to 80msec; Alex claims to be seeing
interesting rotation effects at L-H-L transitions.
plasma (didn't think we'd get that one)
Peak neuts/hards at 1.5e13, but doesn't last long.
D+E run with trips, J trips with short runs; max rf=3MW
110kJ, initial H-mode gets H=2, then drops rapidly to 1.
It does seem to have ELMs
|
| May 10 2007 05:10:03:137PM | 1070510029 | Steve Wolfe |
Shot#29: last plasma of the day
Similar to 28, not quite as high neuts.
E ran clean, D with a few faults, J better but at reduced power,1MW
Max rf =2.5MW. wmax=110kJ, 1.3e13 on neuts/hards
startup looks fine on this one.
|
| System Availability |
| May 10 2007 09:04:15:743AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 03 2007 10:22AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | The swept frequency channel is connected, bypassing the 110GHz board. The waveform generator voltage is 6.57V (129GHz). 60, 88, 88L and 88U GHz channels are connected and being tested. Others are disconnected. | May 04 2007 12:22AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | May 01 2007 08:27AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 10 2007 09:50:44:480AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. | May 03 2007 10:22AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Starting on shot 1070510001, the 60, 110, 88, 88lsb, 88usb are connected but still being tested. The Swept frequency channel is fixed at 6.57V (129GHz), also in the testing stage. | May 10 2007 09:21AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | May 01 2007 08:27AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 10 2007 10:14:50:440AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. But, low and noisy signals on SOME shots, others OK. | May 10 2007 10:01AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Starting on shot 1070510001, the 60, 110, 88, 88lsb, 88usb are connected but still being tested. The Swept frequency channel is fixed at 6.57V (129GHz), also in the testing stage. | May 10 2007 09:21AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is not calibrated yet. Temperatures should be fairly reliable. Additional spatial channels will be added over the next several weeks. | May 01 2007 08:27AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 10 2007 11:27:43:843AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. But, low and noisy signals on SOME shots, others OK. | May 10 2007 10:01AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Starting on shot 1070510001, the 60, 110, 88, 88lsb, 88usb are connected but still being tested. The Swept frequency channel is fixed at 6.57V (129GHz), also in the testing stage. | May 10 2007 09:21AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 10 2007 11:41:08:757AM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. But, low and noisy signals on SOME shots, others OK. | May 10 2007 10:01AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Starting on shot 1070510001, the 60, 110, 88, 88lsb, 88usb are connected but still being tested. The Swept frequency channel is fixed at 6.57V (129GHz), also in the testing stage. | May 10 2007 09:21AM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 10 2007 02:53:58:750PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | no | | Jan 14 2007 01:47PM | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. But, low and noisy signals on SOME shots, others OK. | May 10 2007 10:01AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Starting on shot 1070510019, the 60, 110, 88, 88lsb, 88usb are connected but still being tested. The Swept frequency channel is sweeping at 1Hz (I'll check the frequency when there is cell access), also in the testing stage. | May 10 2007 02:50PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|
| May 10 2007 04:56:21:727PM |
| System | Available | Comment | Availability Changed | Owner | Description | Who Can Change | | Active MHD | yes | Fully operational | Mar 28 2007 09:19PM (sears) | Joe Snipes | Active MHD Antenna | sears,snipes | | BES | yes | vertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm. | Feb 06 2007 10:00AM (bravenec) | Ron Bravenec | Beam Emission Spectroscopy | bravenec | | Bolometers | yes | 2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready. | Apr 26 2007 10:27AM (mlreinke) | Matt Reinke | Bolometers | hutch,mlreinke | | Boronization | yes | First Boronization 5/9/07 | May 10 2007 04:55PM (irby) | Jim Irby | Boronization | dekow,irby | | CNPA | no | | Jan 14 2007 02:06PM | Ron Parker | Compact Neutral Analyzer | parker | | Cryopump - Upper Divertor | no | In-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system. | Mar 30 2007 10:53AM (labombard) | Brian LaBombard | Upper Divertor Cryopump | irby,labombard | | CXRS | yes | The pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm. | May 01 2007 12:31PM (bespam) | Bill Rowan | Charge Exchange Spectroscopy | bespam,blip,rachmcd,rowan | | D Alpha | yes | \ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are available | Mar 11 2007 10:28PM (terry) | Jim Terry | Balmer Alpha Monitor | irby,terry,wolfe | | Dalsa | yes | camera is re-installed, and view has been calibrated | Feb 26 2007 03:28PM (marmar) | Earl Marmar | Visible Bremsstrahlung | marmar | | Disruption Mitigation | no | | Jan 14 2007 02:02PM | Bob Granetz | Gas Jet | granetz,whyte | | Divertor IR | no | | Mar 06 2007 10:50AM | Glen Wurden | Divertor IR Digital Video | gwurden,terry | | Divertor IR Spectroscopy | no | | Mar 06 2007 10:51AM | Glen Wurden | Divertor IR Spectroscopy | gwurden,ldorf,terry | | DNB | yes | All systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shots | Mar 28 2007 09:36AM (beals) | Bob Granetz | Diagnostic Beam | beals,granetz | | FRC-ECE | yes | All channels now working. | Apr 04 2007 11:04AM (phillips) | Perry Phillips | Heterodyne ECE-32 channels | phillips | | G-Side Ratiomatic | yes | The gauge is operational. | Mar 30 2007 10:54AM (labombard) | Brian LaBombard | G-side ratiomatic ionization gauge | labombard,toland | | GPC | yes | Chs 1-8 operational. But, low and noisy signals on SOME shots, others OK. | May 10 2007 10:01AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPC2 | yes | Most slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD. | Apr 11 2007 09:34AM (hubbard) | Amanda Hubbard | ECE Polychromater | hubbard,schmidt | | GPI | yes | New view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational. | Mar 27 2007 01:59PM (terry) | Jim Terry | Gas Puff Imaging | terry,zweben | | H/D | yes | spectral calibration needs to be checked, but system should be ready for the run | Feb 26 2007 03:28PM (marmar) | Earl Marmar | H/D Ratio | marmar | | Hirex Jr | yes | | Mar 06 2007 08:59AM (rice) | John Rice | High Resolution X-Ray | ince,rice | | Hirex Sr | yes | Storing Data, but profiles not yet available | Apr 27 2007 01:20PM (ince) | John Rice | High Resolution X-Ray | ince,rice | | HXR | yes | Something might be wrong with channel 26; all others working fine. | Mar 23 2007 10:43AM (schmidt) | Ron Parker | Hard X-Ray Array | parker,schmidt | | ICRF D-Antenna | yes | 80.5 MHz. ready | Mar 28 2007 08:50AM (ylin) | Steve Wukitch | D-port antenna | wukitch,ylin | | ICRF E-Antenna | no | 80 MHz. FFT installation/coaxial line needs more work | Mar 16 2007 09:32AM (ylin) | Steve Wukitch | E-port antenna | wukitch,ylin | | ICRF J-Antenna | yes | 78 MHz | Apr 04 2007 08:56AM (ylin) | Steve Wukitch | J-port antenna | wukitch,ylin | | Lower Hybrid | no | 6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. | May 04 2007 03:44PM (dterry) | Ron Parker | Lower Hybrid | dterry,parker | | LPI | yes | | Apr 26 2007 08:35PM (bose) | Earl Marmar | Lithium Pellet Injector | bose,marmar | | Ly-alpha | yes | Midplane data being digitized, but analyzed data not ready. 2D arrays being debugged. | Apr 26 2007 10:28AM (mlreinke) | Matt Reinke | Lyman alpha cameras | labombard,mlreinke | | McPherson | yes | Working normally. | Apr 19 2007 09:52AM (mlreinke) | Jim Terry | VUV Spectrometer | mlreinke,terry | | Michelson | yes | Operational. | Mar 28 2007 08:33AM (hubbard) | Amanda Hubbard | ECE Te Profiles | hubbard,schmidt | | MKS | yes | E-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box. | Mar 20 2007 06:42PM (g) | Brian LaBombard | Baratron pressure gauges | labombard | | MLP | no | Bench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe. | Mar 13 2007 09:57PM (labombard) | Brian LaBombard | Mirror Langmuir Probe Electronics System | labombard | | MSE | no | (1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. | Apr 03 2007 12:05PM (sscott) | Steve Scott | Motional Stark Effect | jinseok,sscott | | Neutrons | yes | Both neutron systems are fully operational | Apr 05 2007 11:19AM (fiore) | Catherine Fiore | Neutron Detectors | fiore | | Neuts and Hards | yes | operational | Mar 21 2007 04:29PM (irby) | Jim Irby | X-Ray/Neutron Detector at K-Hor | irby | | NINJA | yes | All capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter). | Mar 29 2007 11:47AM (terry) | Brian LaBombard | NINJA gas puff | labombard,terry | | PCI | no | System unavailable. The laser is under repair. | Apr 04 2007 11:16PM (lianglin) | Miklos Porkolab | Phase Contrast Imaging | edlund,lianglin,ntsujii,porkolab | | Penning Gauges | yes | 8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'. | Mar 13 2007 10:01PM (labombard) | Brian LaBombard | Penning Ionization Gauges | labombard | | Plasma TV | yes | WIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational. | Mar 27 2007 01:53PM (terry) | Jim Terry | Video of plasma via several cameras | dekow,irby,terry,wolfe | | Polarimeter | no | Retro shutter closed | Mar 15 2007 11:00AM (irby) | Jim Irby | C-Mod Polarimeter | irby | | Probe Array - ISD | yes | Probes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:47PM (labombard) | Brian Labombard | Inner Lower Divertor Probe Array | labombard | | Probe Array - LH | yes | All 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. | Mar 13 2007 09:46PM (labombard) | Brian LaBombard | Lower Hybrid Probe Array | labombard | | Probe Array - OSD | yes | Probes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. | Mar 13 2007 09:45PM (labombard) | Brian LaBombard | Outer Lower Divertor Probe Array | labombard | | Probe Array - UDIV | yes | 14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis. | Mar 13 2007 12:46PM (labombard) | Brian LaBombard | Upper Divertor Probe Array | labombard | | Reflectometer | yes | Starting on shot 1070510019, the 60, 110, 88, 88lsb, 88usb are connected but still being tested. The Swept frequency channel is sweeping at 1Hz (I'll check the frequency when there is cell access), also in the testing stage. | May 10 2007 02:50PM (dominguez) | Earl Marmar | Reflectometer | dominguez,marmar | | Scanning Probe - ASP | yes | Perpendicular Mach probe head is installed. The drive is operational. | Mar 15 2007 09:09PM (labombard) | Brian LaBombard | A-Port Scanning Probe | labombard | | Scanning Probe - FSP | yes | Perpendicular Mach probe head is installed. The probe drive is now operational. | Mar 13 2007 09:51PM (labombard) | Brian LaBombard | F-Port Scanning Probe | labombard | | Scanning Probe - WASP | yes | A-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed. | Apr 12 2007 04:18PM (nsmick) | Brian LaBombard | Inner Wall Scanning Probe | labombard,nsmick | | TCI | yes | NL04 at 71.04 cm from 3/9/07 calibration | Mar 09 2007 05:47PM (irby) | Jim Irby | Two-Color Interferometer (TCI) | irby,murray | | TS - Core | yes | 2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks. | May 10 2007 10:37AM (jwhughes) | Jerry Hughes | Core Thomson scattering | jwhughes | | TS - Edge | yes | Temperature calibration is complete. Density is uncalibrated. | Apr 24 2007 08:20PM (jwhughes) | Jerry Hughes | Millimeter resolution edge Thomson scattering | jwhughes | | Vispec | yes | 350 and 670 nm, 4 spatial channels | May 04 2007 01:02PM (agraf) | Alex Graf | Visible Spectrometer | agraf |
|