| MP#488 Evaluation of the Fast Ferrite Tuning System,MP#355 ICRF Testing |
| Session Leader Plans |
| Physics Operators Plans |
| Entered: May 14 2007 03:07:48:060PM |
| Author: Bill Rowan |
| Physics Operator Plan for Tuesday, May 15, 2007
MP#488 Evaluation of the Fast Ferrite Tuning System MP#355 ICRF Testing and Conditioning SL: S. Wukitch and Y. Lin PO: Rowan Engineering Setup ------------------ The machine will be boronized on Monday, May 14. NO post-boronization ECDC -- NONE overnight, NONE in the morning. Run begins at 10:00 and ends at 17:00 Power systems as on 1070510007 Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled Gas setup: --------- Fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) pump out NINJA and backfill with 8 PSI of D2, then disable. Enable the following gate valves and shutters, assuming no vacuum problems: ECE, VUV, Z-bolo shutters; Enable DNB gatevalve if requested by DNB operator. Torvac setup: Pumpstack gatevalves OPEN RGA's valved off (isolated from machine) ICRF: FMIT#1,2 in RUN-ON by 08:30 ICRF: FMIT#3,4 in RUN-ON by 06:45 LH: None Start with PCS loaded from 1070510007. This shot is selected because it is the first shot from 1070510 with removal of seg2 Pg3 puff at 0.7sec. The puff resulted in high neutral pressure which was the cause of difficulties with J-port ICRF operation.) |
| Session Leader Summaries |
| Physics Operator Summaries |
| Entered: May 15 2007 02:13:22:223PM |
| Author: Bill Rowan |
| The ICRF conditioned without plasma today. At 2pm, it was clear that this would not be finished by the end of the day so C-Mod was shut down and ICRF conditioning continued. |
| Session Leader Comments |
| Physics Operator Comments | |||
| May 15 2007 09:51:08:203AM | Bill Rowan |
The start of the run will be delayed past 10am due to ICRF conditioning. Stay tuned! | |
| May 15 2007 09:52:04:013AM | Bill Rowan | Loaded PCS from 1070510007. This shot is selected because it is the first
shot from 1070510 with removal of seg2 Pg3 puff at 0.7sec. The puff resulted in high neutral pressure which was the cause of difficulties with J-port ICRF operation. | |