Alcator C-Mod Run 1070516 Information

Back to runs

Miniproposals
Miniproposal:482
Date Filed: 4/27/2007
Title:CXRS Diagnostic Development
First Author:Rachael Mcdermott
Session Leader:Dennis Whyte (shots 1-29)

Operators
Session leader(s):Dennis Whyte
Physics operator(s):Jim Irby,Steve Wolfe,Jim Irby
Engineering operator(s):Bill Cochran,Sam Pierson,Ed Fitzgerald

Engineering Operator Run Comment
mp482

Session Leader Plans
Entered: May 15 2007 08:06:49:120PM
Author: Rachael Mcdermott
Session Leader Plan for Wednesday, May 16 2007

MP # 482 Pedestal CXRS Diagnostic Development

Purpose:
The purpose of this mini-proposal is to develop better methods of background subtraction in order to improve our capability of making reliable temperature, density, and velocity meansurements via charge exchange recombination spectroscopy.

Preparation:

Recently boronized machine
enough RF power to produce sustainable H-mode 2-3MW
80MHz 0.5-1s pulses beginning at .75-1s

Diagnostics:
All CX diagnostics, Edge and Core TS, ECE, edge probes for early L-mode periods only, bolometry, Hirex and its various relations.

Enable the following gate valves and shutters:
ECE, VUV, Z-bolo shutters; DNB gatevalve
Allow low level Argon puff(1 psi 100ms) early in shot (0.3s) from shot 1

No Lower Hybrid
No pellet injection (sorry Brock)

T=5.4T (forward field)
I=800ka-1Ma
Working Gas D2
Density: nl_04 = 0.8-1.2 *10^20 m^-2
LSN plasmas, use 1050823002 as reference equilibria

Shot Sequence:
1) No DNB, nl04=0.8x1020 m-2, RF power ramp 1-3MW to find power threshold
2) No DNB, nl04=0.8x1020 m-2 with power at least 1MW above the threshold.
Long pulse DNB, 6-6.5A, extending 100ms before and after the RF pulse nl04=0.8x1020 m-2 (See Figure 2)
3) Chopped DNB 20ms on and off, nl04=0.8x1020 m-2 (See Figure 4.)
Phase Shifted chopped DNB 12ms on and off, nl04=0.8x1020 m-2
4) Third shot time allowing with chopped DNB timing to be decided possibly shifted to capture more of the LH transition

5-8) Repeat above procedure for nl_04-1.2*10^20 m^-2

Gap Scans:
9-10) No DNB, RF power at least 1MW above threshold power, Nl04=1.2*1020 m-2
Gap scan 1.5cm -0.5cm during H-mode, 2 shots

Physics Operators Plans
Entered: May 15 2007 09:32:56:007AM
Author: Jim Irby
Physics Operator Plan for Wednesday, May 16, 2007

MP#482 Pedestal CXRS Diagnostic Development


SL: R. McDermott
PO: Irby

Engineering Setup
------------------

Run begins at 9:00 and ends at 17:00

Power systems as on 1050823002

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:
---------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
pump out NINJA and backfill with 8 PSI of D2, then disable.

Enable the following gate valves and shutters:
ECE, VUV, Z-bolo shutters; DNB gatevalve

Torvac setup: Pumpstack gatevalves OPEN
RGA's on

We need enough ICRF to produce a sustained H-Mode (approx 3 MW)
ICRF: FMIT#1,2 in RUN-ON by 06:45
ICRF: FMIT#3,4 in RUN-ON by 06:45

LH: None

Session Leader Summaries
Entered: May 16 2007 05:12:53:543PM
Author: Dennis Whyte
A successful day. We completed the MP for
CXRS background subtraction calibrations.

The boronization seems to have held since we were
able to get steady H-modes through most of the day, with
the exception of the USN H-modes at the end of the day.

Physics Operator Summaries
Entered: May 17 2007 07:33:53:647AM
Author: Jim Irby
I loaded the startup from 1070511036 and all was well until shot 14. We again began the afternoon fizzle sequence of a fizzle or two followed by a plasma. Before shot 24 we did 10 minutes of ECDC in helium at 5e-5 Torr. This process seemed to fix the problem and we then had 5 plasmas in a row. We have had good results using ECDC in D2 previously to end the fizzle cycle, but helium has the advantage of being pumped out quickly. The last shot was lost to a data system problem.

disruptions 07
fizzles 14,16,17,19,20,22,23
plasmas 01,02,03,04,05,06,07,08,09,10
11,12,13,15,18,21,24,25,26,27
28

data system problem on 29 --- no power shot

Session Leader Comments
May 16 2007 09:56:22:010AM1070516001Dennis WhyteNo H-mode. RF (J-ant) had many trips.
Strange density pump out at onset of RF.
Huge Fe injection at 0.3 s.
Inner gap is 1 cm as compared to 1.5 in fiducial
shot 1050823002.



May 16 2007 10:24:25:240AM1070516002Dennis WhyteH-mode,at PRF ~ 1.5 MW.

but RF started to trip out just after
the transition. As a result the H-mode was not very constant.
Mo and Prad jump around a bit with the RF but
overall look steady.

Have decided we'll get likely get reliable and
repeatable H-mode with P_Rf = 2 MW steady.
Hopefully the lower power input will also lengthen
the utility of the BZN.

Chromex has views of top of outer divertor shelf.
Will monitor for Mo I. No Mo I present at this point.


May 16 2007 10:19:45:223AM1070516003Dennis Whyte2 MW RF starting at 0.75 seconds.
L-H transition looks good, with
steady H-mode by ~ 1 s.

Looks like a good fiducial with
steady L-H transition and H-mode density
steady after ~250 ms. This will be adequate
for the CXRS background studies.


What looks liks an antennae injection of Ni/Mo simultnaeously
with the RF drop out and back transition
at 1.15 s. Mcpherson shows steady
Cu light during H-mode/RF phases.



May 16 2007 10:54:28:563AM1070516004Dennis WhyteConstant RF at 2 MW from 0.75 to 1.5 s
Good L-H transitions and steady H-mode with constant
Prad.
but a small impurity injection 1.09 s kicked
down stored energy.

The DNB was on at 5 A from 0.5 to 1.75, but
the intensity increment was very weak on CXRS.
This turns out to be consistent with post-BZN
results from last weak. So it appears there
is not enough signal strength to utilize the
constant beam on constant for analysis and we're
switching to the beam blips.
May 16 2007 11:07:03:320AM1070516005Dennis Whyteconstant H-mode at 2 MW Rf, with a few
Rf drop outs. Reproducible L-H transition.

McPherson continues to show low Mo in H-mode, but
small injectionsin early phases of discharge.

DNB had 20 ms beam blips. CXRS shows good signal.
Will now phase DNB blips


May 16 2007 11:21:43:700AM1070516006Dennis Whyteconstant H-mode at 2 MW Rf,
Reproducible L-H transition compares to
prevsious shots based on density evolution.

Prad has creeped up and core Mo too.
No signs of Mo I on Chromex (inner wall,
vertical target or upper shelf)

13 ms DNB blips. Good CXRS signals.



May 16 2007 11:44:12:863AM1070516008Dennis Whytenl_04 at1.2e20
RF never really took hold due to matching problems.

Fewer injections with this long L-Mode.


May 16 2007 11:56:53:493AM1070516009Dennis Whytenl_04 at1.2e20
RF still has matching problems.
RF gurus inform us that the edge pressure
is a bit too high.

We're going to lower nl04 to 1.1e20 to get
more reliable RF.



May 16 2007 12:23:06:850PM1070516011Dennis Whytenl_04 = 1.0e20
H-mode at 1 MW RF
Steady H-mode at ~1.5 MW RF
J-ant had matching problems

so this looks like a good fiducial
at higher density. Will program
steady 1.5 MW RF for production shots.
May 16 2007 12:49:40:530PM1070516012Dennis WhyteH-mode, with 1.4 MW RF

Target nl = 1.0e20

Looks like good higher density fiducial

There are signs that the Prad is becoming
less stable in H-mode.

No sign of Mo I on Chromex




May 16 2007 12:52:52:750PM1070516013Dennis WhyteH-mode, with 1.4 MW RF
Target nl = 1.0e20

Had a few drop outs but steady
Prad.

Good DNB beam blips and CXRS data.




May 16 2007 01:41:14:940PM1070516015Dennis WhyteGood repeat H-mode at 1.5 MW.
May 16 2007 01:57:43:417PM1070516016Dennis Whytefizzle
May 16 2007 02:03:28:747PM1070516017Dennis Whytefizzle
May 16 2007 02:28:41:107PM1070516019Dennis Whytefizzle


May 16 2007 02:45:15:143PM1070516020Dennis Whytefizzle


May 16 2007 03:11:03:013PM1070516021Dennis Whytethe first applicaiton of 2 MW RF did not
result in H-mode. It's not clear why since the
target looks identical to 18 which went into H-mode

the H-mode was delayed until 0.9 s
but CXRS got some right gap sweep data


May 16 2007 03:11:11:513PM1070516022Dennis Whytefizzle


May 16 2007 04:34:38:437PM1070516026Dennis WhyteTransiet H-mode in USN at 2.5 MW RF at 1.1 s.

Radiated / Mo power is rising rapidly...what does
this tell us about the importance of divertor Mo sources?


May 16 2007 04:39:58:377PM1070516027Dennis WhyteTwo transient H-modes in USN at 2.5 MW RF

No signs of Mo I on Chromex



Physics Operator Comments
May 16 2007 09:46:29:837AM1070516001Jim IrbyLoaded shot 1050823002 --- SNL, 800kA
Loaded shot 1070511036 into seg 1
recalulated seg 2, 3, and 4

Set PG1 for argon from 300 to 400 ms is enabled for the first shot

No change in prepuff from Friday: 18 ms

ICRF from 0.75 to 1.5 s with ramp to determine h-mode threshold

nl_04 request 8e19/m^2

diag and DNB gatevalves enabled (but no DNB for first two shots)

loaded shot at 0859

Waiting for rf conditioning of J-Port --- looking much better than yesterday

BP 1.1e-7 Torr

start at 09:31

plasma into rampdown --- no h-mode

lots of iron according to Matt --- .33 s


May 16 2007 10:20:17:690AM1070516002Jim IrbyIncreased clearin by 2 mm

BP 8.3e-7 Torr

plasma into rampdown --- more rf and an h-mode

h-mode at about 1.5 MW

inner gap still 2 mm too small, outer gap okay

plasma into rampdown


May 16 2007 10:20:59:440AM1070516003Jim Irbyno changes

plasma into rampdown -- 2 h-modes --- Rachael is happy with the shot

DNB on next shot
May 16 2007 10:52:02:923AM1070516004Jim IrbyNo DPCS changes

hope for a little better rf

plasma into rampdown --- steady h-mode

DNB into plasma
May 16 2007 10:54:16:110AM1070516005Jim IrbyNo DPCS changes

Good plasma.
Wolfe taking over as physop for an hour.
May 16 2007 11:08:57:960AM1070516006Steve Wolfe
Shot#6: After shot#5, tmp 2 seems to have faied. Gate valve
closed, will operate with one pump for now. 
Base pressure before INIT is 3.2e-6, asking for trouble!
plasma, 2 hmodes, possible injection trip at 1.24sec
base pressure at breakdown up to .045 from 0.04, but 
startup looks ok. 



May 16 2007 11:25:29:217AM1070516007Steve Wolfe
Shot#7: Go to 1.2e20 for this shot. No beam, RF ramp.
Disrupted 1.36sec. Looks like an injection, 
No H-mode. Hardly any RF; everybody faults out. 

Next: drop pg4 after high demsity disruption. 

May 16 2007 11:33:57:580AM1070516008Steve Wolfe
Shot#8:  drop pg4 from 18 to 16 msec after high density disruption. 
Irby's back and will take over from here

May 16 2007 11:49:23:650AM1070516008Jim Irbyplasma for 1.8 s

some injections starting abour 1.75 s


May 16 2007 11:55:52:057AM1070516009Jim IrbyNo DPCS changes

RF tune should be better this shot

plasma into rampdown --- 1.86 s

rf still tripping out


May 16 2007 12:13:39:440PM1070516010Jim Irbynl_04 request to 1.1e20 /m^2 from 1.2e20/m^2

plasma into rampdown but still no rf


May 16 2007 12:28:09:943PM1070516011Jim Irbynl_04 request to 1.0e20/m^2

density into rampdown --- sustained h-mode at abt 1.5 MW

j-port in trouble at this density


May 16 2007 12:46:39:530PM1070516012Jim Irbyno DPCS changes --- try to repeat shot 11

plasma into rampdown --- h-mode --- only 1.37 MW, d-port great, e-port trips


May 16 2007 01:02:38:880PM1070516013Jim Irbyno DPCS changes

plasma into rampdown --- rf power constant at 1.45 MW
good h-mode


May 16 2007 01:15:00:523PM1070516014Jim Irbyno DPCS changes

fizzle --- 2 mT jump in Bz0 at 6 to 8 ms??


May 16 2007 01:21:11:807PM1070516015Jim Irbyef4 from -1335 to -1340 A --- just to say I did something

plasma into rampdown

Bz0 back to normal


May 16 2007 01:47:01:740PM1070516016Jim Irbyincreased prepuff by 1 ms to 17 ms

put in outer gap sweep from 1.5 cm to 0.5 cm from 0.9 s to 1.3 s
rcur: 0.658 to 0.663

fizzle ---

Bz0 and Br0 okay, gas okay


May 16 2007 02:04:42:467PM1070516017Jim Irbyno changes

fizzle ---

fields and gas still look okay
May 16 2007 02:21:54:697PM1070516018Jim Irbyprepuff from 17 to 18 ms

plasma into rampdown

got the outer gap scan, but I forgot to drop density to 8e19/m^2


May 16 2007 02:28:26:653PM1070516019Jim Irbyno DPCS changes

fizzle ---
May 16 2007 02:46:49:020PM1070516020Jim Irbytry less gas --- 18 to 16 ms

gv2 open again for this shot

fizzle

May 16 2007 03:03:38:930PM1070516021Jim Irbyadded 1 ms of gas

plasma into rampdown --- late l to h transition


May 16 2007 03:11:06:683PM1070516022Jim Irbyno changes

fizzle
May 16 2007 03:26:38:063PM1070516023Jim Irbyloaded 1070511024 --- usn
loaded 1070516022 into seg 1
nl_04 request to 8e19/m^2

running seg 3

added 1 mm to rcur (reduce outer gap by 2 mm)

BP 7.6e-7 Torr

beautiful upper null fizzle


May 16 2007 04:08:21:223PM1070516024Jim Irby10 minutes of ecdc in Helium at 5e-5 Torr; 44/45/103

BP 7.9e-7 Torr

plasma into rampdown but very little rf


May 16 2007 04:18:19:337PM1070516025Jim Irbyrepeat with rf we hope

plasma into rampdown --- no h-modes, rf
May 16 2007 04:26:53:870PM1070516026Jim Irbyrepeat

plasma into rampdown --- brief h-mode; elm-free


May 16 2007 04:38:37:407PM1070516027Jim Irbyrepeat with more rf if possible

plasma into rampdown

TCI CO2 demod for nl_05 failed, but stored data anyway. Same as last week, but
HeNe channel 3.


May 16 2007 04:56:05:693PM1070516028Jim Irbyrepeat

plasma into rampdown --- 3 h-modes
May 16 2007 05:11:14:230PM1070516029Jim Irbyloaded seg 2 of shot 1070516018 into seg 2
turned of seg 3, turned on seg 2
dropped nl_04 request to 8e19/m^2

no power shot --- data system problems




Engineering Operator Comments
ShotTimeTypeStatusComment
109:32:00:800AMPlasmaOk
209:51:11:320AMPlasmaOk
310:07:57:907AMPlasmaOk
410:23:52:037AMPlasmaOk
510:51:29:313AMPlasmaOk
611:05:24:320AMPlasmaOk
711:19:47:823AMPlasmaOk
811:34:27:877AMPlasmaOk
911:49:35:227AMPlasmaOk
1012:02:38:340PMPlasmaOk
1112:15:24:813PMPlasmaOk
1212:31:14:773PMPlasmaOk
1312:45:18:450PMPlasmaOk
1401:04:46:177PMPlasmaOk
1501:17:17:430PMPlasmaOk
1601:43:10:330PMPlasmaOk
1701:56:18:040PMPlasmaOk
1802:09:22:400PMPlasmaOk
1902:22:07:417PMPlasmaOk
2002:34:54:000PMPlasmaOk
2102:47:17:737PMPlasmaOk
2203:00:34:413PMPlasmaOk
2303:21:16:093PMPlasmaOk
2403:54:31:390PMPlasmaOk
2504:07:11:220PMPlasmaOk
2604:19:40:180PMPlasmaOk
2704:32:21:637PMPlasmaOk
2804:47:59:660PMPlasmaOk
2905:00:58:227PMTestBad

System Availability
May 16 2007 09:31:42:097AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready.Apr 26 2007 10:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. But, low and noisy signals on SOME shots, others OK.May 10 2007 10:01AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost slow channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.Apr 11 2007 09:34AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, but analyzed data not ready. 2D arrays being debugged.Apr 26 2007 10:28AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesStarting on shot 1070510019, the 60, 110, 88, 88lsb, 88usb are connected but still being tested. The Swept frequency channel is sweeping at 1Hz (I'll check the frequency when there is cell access), also in the testing stage.May 10 2007 02:50PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL04 at 71.04 cm from 3/9/07 calibrationMar 09 2007 05:47PM (irby)Jim IrbyTwo-Color Interferometer (TCI)irby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - EdgeyesTemperature calibration is complete. Density is uncalibrated.Apr 24 2007 08:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf