Alcator C-Mod Run 1070524 Information

Back to runs

Miniproposals
Miniproposal:468
Date Filed: 3/8/2007
Title:LH-driven fast electron diffusion time measurement
First Author:Andrea Schmidt
Session Leader:Andrea Schmidt (shots 1-12)
Session Leader:Andrea Schmidt (shots 18-29)
Miniproposal:473
Date Filed: 3/9/2007
Title:Lower Hybrid System Check-out and Initial operation
First Author:J. Randall Wilson
Session Leader:Greg Wallace (shots 13-17)

Operators
Session leader(s):Andrea Schmidt,Greg Wallace,Andrea Schmidt
Physics operator(s):Ron Parker
Engineering operator(s):Andy Pfeiffer,Bill Parkin,Bill Byford

Engineering Operator Run Comment
MP#468 LH-driven fast electron diffusion SL: Schmidt PO: Rowan

Session Leader Plans
Entered: May 23 2007 05:19:15:943PM
Author: Andrea Schmidt
Start out the day with fast-modulated LH at 60 deg ideal phasing to obtain two conditions (preferably 4 good shots at each condition):

1) nl04=5e19, Ip=800 kA (starting shot 1070523023)
2) nl04=5e19, Ip=500 kA

Then change to 120 degree ideal phasing to obtain one condition:

1) nl04=5e19, Ip=800 kA

If there is extra time, we will change to 90 degree ideal phasing to obtain one condition:

1) nl04=7.5e19, Ip=500 kA

Physics Operators Plans
Entered: May 23 2007 03:41:53:017PM
Author: Bill Rowan
Physics Operator Plan for Thursday, May 24, 2007

MP#468 LH-driven fast electron diffusion

SL: Schmidt
PO: Rowan

Engineering Setup
------------------

ECDC overnight in D2, pressure=2e-4 Torr. Rmin/Rdwell/Rmax = 44/45/103 cm.
Bake at 60 C.


Run begins at 09:00 and ends at 17:00

Power systems as on 1070523022
Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:
---------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
pump out NINJA then disable.

Enable the following gate valves and shutters, assuming no vacuum problems:
ECE, VUV, Z-bolo shutters

Torvac setup: Pumpstack gatevalves OPEN
RGA's valved off (isolated from machine)


RF Systems:
----------
LH full power
No ICRF for this run

Session Leader Summaries
Entered: May 24 2007 04:52:50:710PM
Author: Greg Wallace
60 degree ideal current drive with same plasma as yesterday went into H-mode immediately after LH turned off. Switched to 120 degree ideal phasing but could not couple even after moving upper x-point out and reducing outer gap to near zero. Even with "zero" outer gap there was no heating on the LH grill or limiters.
Entered: May 24 2007 05:13:28:313PM
Author: Andrea Schmidt
We tried to obtain LH-modulated xray data for several plasma conditions. We started with 60 degree ideal phasing, Ip=800, nl04=5e19 (shots 1-7). Out of these, shots 5-7 were very successful with no/few trips and LH coupled powers where we wanted them, a little higher than 400 kW.

We then lowered to Ip=500 (shots 8 to 12), with few/no trips on shots 10-12.

Shots 13-17 were run by Greg Wallace on MP 473.

We then changed the LH phasing to 120 degrees ideal. For shots 18+, we tried to couple the 120 deg LH modulation, with good results on shots 22, 26, and 29.

Physics Operator Summaries
Entered: May 24 2007 06:00:13:613PM
Author: Ron Parker
This run did not place heavy demand on the PO as the shots were mainly Ohmic with various levels of LH power. The run was mostly devoted to Andrea's MP468. The machine performed well for most of the day. Problems were encountered in coupling the LH power at high n_par (~3.1) since a small evanescent layer at the grill makes coupling much more difficult at high n_par. We ended up pushing the outer gap negative in order to bring the density at the grill up to a level required for good coupling. (There is some question about EFIT's accuracy when the outer gap is + or - 1mm.) Still, even with reasonable grill densities, trips in the LH pulse train were a problem. In the future it seems that we could afford to desensitize a few reflection coefficient trip levels. But in the end, good data were obtained at the high n_par for 800 kA and nl_04 ~5-6e19m-2.

One problem that developed late in the run, specifically shots 26 and 27 (the latter was a dud) was a sudden increase in BZ(0) to 2.5 mT positive. The cause was traced to OH1 current not following accurately its demand (off by about 300 amps.)
As mentioned, this caused a dud on shot 27, but was corrected for shot 29 by delibeerately setting the demand for OH1 300 A greater than the usual level (from -19,600 to -19,300). With this change, BZ(0) was restored to 0 and shot 29 went off well. [PO FOR 1070525 PLEASE NOTE].

Scorecard: 29 attempts at plasma, 2 duds (one of which was due to aforemtnioned OH1 problem), 1 disruption, 1 fizzle following disruption, 1 no power shot(PO error in loading shot) and 24 full length shots.

Session Leader Comments
May 24 2007 09:11:10:957AM1070524001Andrea SchmidtLow density (nl04=5e19), modulated LH pulses from 0.5 to 1.5 s, 60 degree ideal phasing. Next shot will be the same.
May 24 2007 09:33:21:370AM1070524002Andrea SchmidtLow density (nl04=5e19), modulated LH pulses from 0.5 to 1.5 s, 60 degree ideal phasing. Next shot will be the same.
May 24 2007 09:59:01:367AM1070524003Andrea SchmidtLow density (nl04=5e19), modulated LH pulses from 0.5 to 1.5 s, 60 degree ideal phasing. Next shot will be the same.
May 24 2007 10:30:11:330AM1070524005Andrea SchmidtLow density (nl04=5e19), modulated LH pulses from 0.5 to 1.5 s, 60 degree ideal phasing. Next shot will be the same.
May 24 2007 11:10:32:737AM1070524006Andrea SchmidtLow density (nl04=5e19), modulated LH pulses from 0.5 to 1.5 s, 60 degree ideal phasing. Next shot will be the same.
May 24 2007 11:10:51:487AM1070524007Andrea SchmidtLow density (nl04=5e19), modulated LH pulses from 0.5 to 1.5 s, 60 degree ideal phasing. Next shot will be lower current (500 kA).
May 24 2007 11:11:15:050AM1070524008Andrea SchmidtLow density (nl04=5e19), modulated LH pulses from 0.5 to 1.5 s, 60 degree ideal phasing, Ip=500 kA. Next shot will be same.
May 24 2007 12:41:39:397PM1070524013Greg Wallace60 degree ideal repeat of shot 1070523017. Waves barely accessable into L-mode. Plasma went into H-mode after end of LH pulse, possibly because of sudden jump in ohmic heating power. Next shot will be same but with 120 ideal phasing.
May 24 2007 01:23:11:500PM1070524014Greg Wallace120 ideal current drive direction. High intrinsic reflection on top row caused nothing but trips. Next shot will move upper x-point out by 2cm to increase density on top half of grill.
May 24 2007 01:46:50:750PM1070524016Greg WallaceMore trips. Top row is still the problem. Next shot will move upper x-point out by 1.5cm.
May 24 2007 04:50:52:710PM1070524017Greg WallaceMore trips. Top row is still the problem. Turning the run over to Andrea.

Physics Operator Comments
May 24 2007 08:45:51:887AM1070524001Ron ParkerCoorection: Parker will be PO today, replacing Rowan who will be PO on the 29th.
May 24 2007 08:51:41:310AM1070524001Ron ParkerFirst few shots will be loaded from 1070523023 with LH pulses.
May 24 2007 09:07:51:923AM1070524001Ron ParkerFirst shot ran well, several trips on LH pulses.

Try it again.
May 24 2007 09:12:51:863AM1070524001Ron ParkerShort delay while TF Rogowski is checked.
May 24 2007 10:14:22:810AM1070524002Ron ParkerShot 2 ran OK. CMODWS30 hung up after shot, resulting in delay needed to reboot.
May 24 2007 10:16:32:980AM1070524003Ron ParkerShot 3 ran OK. Trouble with getting to logbook on Firefox.
May 24 2007 10:27:43:690AM1070524004Ron ParkerShot 4 was a dud.
May 24 2007 10:38:01:473AM1070524005Ron ParkerShot 5 ran well, no indication why 4 was a dud!

Next: One more repeat.
May 24 2007 10:47:14:790AM1070524006Ron ParkerShot 6 ran well, no drop outs in LH pulse train.

One more repeat.
May 24 2007 11:26:56:820AM1070524007Ron ParkerShot 7 ran OK, LH pulse train OK until ~ 1.4 s.

Next: lower current to 500 kA, same density.
May 24 2007 11:27:18:400AM1070524008Ron ParkerShot 8 ran OK, but LH tripped.
May 24 2007 11:29:26:853AM1070524009Ron ParkerShot 9 ran OK, but LH pulse train gave up after ~0.9 s,even with several retries.
May 24 2007 12:02:14:977PM1070524010Ron ParkerShot 10 ran well, good LH pulse train.
May 24 2007 12:02:53:740PM1070524011Ron ParkerShot 11 was good, RF pulse train ran until end without fault.
May 24 2007 12:44:58:587PM1070524012Ron ParkerShot 12 ran well, LH pulse train ran without faults.
May 24 2007 02:05:43:943PM1070524013Ron ParkerThis shot reverted back to shot 1070523017 in attempt to reproduce H mode
with 60 degree phasing. As expected (well, maybe after the fact), H-mode occurred only after LH turned off. This gave a "bump" in loop voltage that was apparently enough to trigger H-mode. [Note: After several Ohmic H-modes without LH it is not clear what role LH is playing].

Next, we'll stay with this shot but go to 120 deg phasing for better coupling after H-mode sets in. In addition, we'll close the "right gap" by 2 mm.
May 24 2007 01:43:11:950PM1070524014Ron ParkerShot 14 ran OK, but LH did not due to multiple faults.

Next: Move upper X-Point out 2 mm (oops) to improve coupling to top row.
May 24 2007 01:33:49:700PM1070524015Ron ParkerSame result, good shot, but no LH due to multiple trips.
May 24 2007 01:58:56:613PM1070524016Ron ParkerAgain, good shot but no luck coupling and LH trips out on each retry.

Next:try one more time--with RXU out 1.5 cm.
May 24 2007 02:29:42:440PM1070524017Ron ParkerShot 17 ran well, but no luck in coupling. Top of columns 5&6 seem to be tripping
the LH off.
May 24 2007 02:32:57:783PM1070524018Ron ParkerShot 18 ran OK. We are back to Andrea's run, trying for fast modulation of LH
power at 120 deg phasing. Unfortunately, there were still frequent trips for this
shot. However, the density was reduced and this resulted in a drop of density at grill. Next: try again,with outer gap reduced by 2mm.
May 24 2007 02:49:32:337PM1070524019Ron ParkerStill coupling problems. Next: Close right gap 2 mm.
May 24 2007 03:06:42:953PM1070524021Ron ParkerShot 20 did a little better with coupling, but not a full pulse train.

Next: Close outer gap 2 more mm.


May 24 2007 03:15:23:923PM1070524021Ron ParkerShot ran well, but RF faults apparently due to circulator arc in klystron 10.

We'll lower that Klystron's power and try again.
May 24 2007 03:34:50:463PM1070524022Ron ParkerSuccess. Good shot, good RF pulse train. Next: repeat.
May 24 2007 03:42:02:967PM1070524023Ron ParkerOuch! Shot 23 disrupted hard on the inner wall.
May 24 2007 03:56:37:753PM1070524024Ron ParkerShot 24 was a "cleaning" shot, following the disruption. It fizzled.

Next: Try again
May 24 2007 04:23:23:200PM1070524025Ron ParkerShot 25 went off OK, but LH pulse train didn't.
May 24 2007 04:35:23:830PM1070524026Ron ParkerShot 26 ran well and useful LH data was obtained. A couple of longer pulses interferred with the desired picket fence pulse train, but these can be accounted for in the data reduction.
May 24 2007 04:59:19:497PM1070524027Ron ParkerAnother dud! Why?

It appears that OH1 is not following its demand by ~ 300 A, which gives a BZ
error of about +2mT. To correct, we've increased the OH1 current by 300 A, from -19,600 to -19,300 A.

This problem began with shot 26.
May 24 2007 05:04:07:873PM1070524028Ron ParkerShot 28 was a no power shot, OH1 current change wasn't loaded prior to init.
Jun 5 2007 02:08:02:543PM1070524029Ron ParkerAgainst all odds, the shot went, the LH pulse train was perfect (no trips) and Brock got to fire his pellet.

More importantly, the OH1 was close to its nominal value even though it was set 300 A lower, i.e., set @ -19,300 and realized -19,700. This problem needs to be either fixed, or accounted for, for tomorrow's run.

Engineering Operator Comments
ShotTimeTypeStatusComment
108:56:55:280AMPlasmaOkTF rog. Failed
209:19:25:443AMPlasmaOkTF rog. bad
309:55:41:553AMPlasmaOk
410:13:54:073AMPlasmaOk
510:26:39:250AMPlasmaOk
610:40:54:803AMPlasmaOk
710:53:40:717AMPlasmaOk
811:06:24:283AMPlasmaOk
911:20:46:897AMPlasmaOk
1011:35:58:247AMPlasmaOk
1111:51:17:800AMPlasmaOk
1212:11:18:993PMPlasmaOk
1312:29:17:877PMPlasmaOk
1401:14:01:987PMPlasmaOk
1501:27:12:440PMPlasmaOk
1601:43:07:983PMPlasmaOk
1702:03:41:757PMPlasmaOk
1802:21:13:387PMPlasmaOk
1902:34:05:830PMPlasmaOk
2002:51:46:713PMPlasmaOk
2103:05:34:810PMPlasmaOk
2203:20:37:253PMPlasmaOk
2303:37:37:620PMPlasmaOk
2403:54:20:970PMPlasmaOk
2504:06:55:257PMPlasmaOk
2604:22:55:793PMPlasmaOk
2704:40:55:503PMPlasmaOk
2804:58:05:650PMPlasmaOk
2905:09:34:360PMPlasmaOk

System Availability
May 24 2007 08:56:29:547AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready.Apr 26 2007 10:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, but analyzed data not ready. 2D arrays being debugged.Apr 26 2007 10:28AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 60, 110, 88LSB, 88USB and 88 are connected but still being tested. The Swept frequency channel is sweeping with the waveform voltage swept at 5Hz with the voltage 4V-8V (117.8GHz-135.5GHz), also in the testing stage.May 21 2007 07:26PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019.May 21 2007 02:39PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf


May 24 2007 10:13:34:920AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDyesFully operationalMar 28 2007 09:19PM (sears)Joe SnipesActive MHD Antennasears,snipes
BESyesvertical array of six views at R ~ 87.3 cm, radial array of three views out to R ~ 89 cm, both at outboard midplane. Three discrete fiber views of beam at R ~ 70.0, 76.5 and 82.5 cm.Feb 06 2007 10:00AM (bravenec)Ron BravenecBeam Emission Spectroscopybravenec
Bolometersyes2Pi diode operational, 2Pi foil being upgrade for noise resistance. Midplane foils being digitized but not calibrated, still ICRF pickup. Midplane AXUV and divertor being digitized but analyzed data not ready.Apr 26 2007 10:27AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationyesFirst Boronization 5/9/07May 10 2007 04:55PM (irby)Jim IrbyBoronizationdekow,irby
CNPAno Jan 14 2007 02:06PM Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoIn-vessel hardware is installed; in-vessel cryogenic systems are leak-tight and have passed LN2 cool-down tests. Work is proceeding on external LHe and LN2 transfer lines as well as PLC control system.Mar 30 2007 10:53AM (labombard)Brian LaBombardUpper Divertor Cryopumpirby,labombard
CXRSyesThe pedestal toroidal array was installed, spatially and absolutely calibrated. There are 10 chords intersect the beam at the major_R_range=[75,4:87.4]cm. Spatial resolution: 1.2 cm. The F-top poloidal array was installed and spatially calibrated. There are 19 chords intersect the beam at the major_R_range=[67.8:91.0]cm. Spatial resolution: 1.22 cm.May 01 2007 12:31PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,rachmcd,rowan
D Alphayes\ha2_bright and \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 are availableMar 11 2007 10:28PM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsayescamera is re-installed, and view has been calibratedFeb 26 2007 03:28PM (marmar)Earl MarmarVisible Bremsstrahlungmarmar
Disruption Mitigationno Jan 14 2007 02:02PM Bob GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,ldorf,terry
DNByesAll systems are operational, but as of 28 March 2007, the beam needs additional conditioning for full performance shotsMar 28 2007 09:36AM (beals)Bob GranetzDiagnostic Beambeals,granetz
FRC-ECEyesAll channels now working.Apr 04 2007 11:04AM (phillips)Perry PhillipsHeterodyne ECE-32 channelsphillips
G-Side RatiomaticyesThe gauge is operational.Mar 30 2007 10:54AM (labombard)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
GPCyesChs 1-8 operational. May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPC2yesMost channels (except 1,8,10,17) operational. Set to lower freqs for LHCD.May 24 2007 08:40AM (hubbard)Amanda HubbardECE Polychromaterhubbard,schmidt
GPIyesNew view just outside of the lower X-point is operational, but data is being archived locally , not to the tree. Midplane GPI is not operational.Mar 27 2007 01:59PM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyesspectral calibration needs to be checked, but system should be ready for the runFeb 26 2007 03:28PM (marmar)Earl MarmarH/D Ratiomarmar
Hirex Jryes Mar 06 2007 08:59AM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesStoring Data, but profiles not yet availableApr 27 2007 01:20PM (ince)John RiceHigh Resolution X-Rayince,rice
HXRyesSomething might be wrong with channel 26; all others working fine.Mar 23 2007 10:43AM (schmidt)Ron ParkerHard X-Ray Arrayparker,schmidt
ICRF D-Antennayes80.5 MHz. readyMar 28 2007 08:50AM (ylin)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennano80 MHz. FFT installation/coaxial line needs more workMar 16 2007 09:32AM (ylin)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes78 MHzApr 04 2007 08:56AM (ylin)Steve WukitchJ-port antennawukitch,ylin
Lower Hybridno6B Pressure window failed. Arcing in 6B, 8B,9B & 23B. May 04 2007 03:44PM (dterry)Ron ParkerLower Hybriddterry,parker
LPIyes Apr 26 2007 08:35PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane data being digitized, but analyzed data not ready. 2D arrays being debugged.Apr 26 2007 10:28AM (mlreinke)Matt ReinkeLyman alpha cameraslabombard,mlreinke
McPhersonyesWorking normally.Apr 19 2007 09:52AM (mlreinke)Jim TerryVUV Spectrometermlreinke,terry
MichelsonyesOperational. Mar 28 2007 08:33AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyesE-Top, E-Bottom, F-top (cryo), G-side, and B-bottom are operational. F-top gauge has a 'sniffer tube' to measure pressures in cryopump gas box.Mar 20 2007 06:42PM (g)Brian LaBombardBaratron pressure gaugeslabombard
MLPnoBench tests are proceeding on a prototype MLP system. We hope to roll the system into the cell for testing in a few weeks, powering up a single electrode on the A-port scanning probe.Mar 13 2007 09:57PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno(1) Bandpass filters replacement underway (2) Beam-into-gas spectrum measurement underway (3) Shutter mechanism currently unstable; remains open. (4) Expect beam-into-gas calibrations complete about 4/24. Apr 03 2007 12:05PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesBoth neutron systems are fully operationalApr 05 2007 11:19AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesoperationalMar 21 2007 04:29PM (irby)Jim IrbyX-Ray/Neutron Detector at K-Horirby
NINJAyesAll capillaries displayed by the NINJA_CONTROL GUI have been tested. NINJA puffed on 1070329009 (A-B limiter).Mar 29 2007 11:47AM (terry)Brian LaBombardNINJA gas pufflabombard,terry
PCInoSystem unavailable. The laser is under repair.Apr 04 2007 11:16PM (lianglin)Miklos PorkolabPhase Contrast Imagingedlund,lianglin,ntsujii,porkolab
Penning Gaugesyes8 in-situ Penning ionization gauges appear to be operational: CB_DivU, CB_OutL, CB_DivL, KA_OutU, KA_OutL, B_DivL, Cryo_1, Cryo_2. Cryo_1 and Cryo_2 are new and installed in the upper cryopump 'gas-box'.Mar 13 2007 10:01PM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV (without an ND filter) are operational.Mar 27 2007 01:53PM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoRetro shutter closedMar 15 2007 11:00AM (irby)Jim IrbyC-Mod Polarimeterirby
Probe Array - ISDyesProbes at 15 of the 16 poloidal locations ('ramped' geometry) are operational. n,Te, particle flux reported every 10 ms.Mar 13 2007 09:47PM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesAll 6 probes on the lower hybrid launcher (tungsten, 1.5 mm projection) are operational. Mar 13 2007 09:46PM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesProbes at 10 poloidal locations (one 'ramped' and one 'flush') are operational. n,Te, particle flux reported every 10 ms. Mar 13 2007 09:45PM (labombard)Brian LaBombardOuter Lower Divertor Probe Arraylabombard
Probe Array - UDIVyes14 probes are operational ('ramped' geometry). n,Te, particle flux reported every 10 ms.Two high-gain channels are installed and operational for ECDC plasma diagnosis.Mar 13 2007 12:46PM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesThe 60, 110, 88LSB, 88USB and 88 are connected but still being tested. The Swept frequency channel is sweeping with the waveform voltage swept at 5Hz with the voltage 4V-8V (117.8GHz-135.5GHz), also in the testing stage.May 21 2007 07:26PM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesPerpendicular Mach probe head is installed. The drive is operational.Mar 15 2007 09:09PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesPerpendicular Mach probe head is installed. The probe drive is now operational.Mar 13 2007 09:51PM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP successfully collected data on 04/04. Some intermittent open circuit on SE Electrode. K-WASP took data on 04/11. Both ready to scan as needed.Apr 12 2007 04:18PM (nsmick)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
TCIyesNL_04 at 71.04 cm from 3/9/07 calibrationMay 23 2007 07:38AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - Coreyes2 lasers, 11 spatial channels. Density is calibrated based on ECE cutoffs obtained on 4 May 2007. Additional spatial channels will be added over the next several weeks.May 10 2007 10:37AM (jwhughes)Jerry HughesCore Thomson scatteringjwhughes
TS - Edgeyes2 lasers, 20 spatial channels. Fiber holder position is -125mm (standard). Density is cross-calibrated to the core system, based on shots 1070504014, 016, and 019.May 21 2007 02:39PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjwhughes
Vispecyes350 and 670 nm, 4 spatial channelsMay 04 2007 01:02PM (agraf)Alex GrafVisible Spectrometeragraf